Loading…
Loading…
17,508 results • Best match
Estimate for providing and fixing Pre-cast slabs on Air Force RCC Nallah from Nangla Road to Gaunchi drain Sohna road in Ward No. 08 NIT Faridabad.(Recall)
REPAIR/ MAINT OF RETAINING WALL, FENCING, PCC/ RR MASONRY, BRICK DRAINS, DRAIN COVER AND HARDSTANDING ETC AT MIL STN KALKA UNDER GE (I) JUTOGH
Cleaning of Silt from Manholes and Haudi of SWD and repairing of storm water drain etc in sec 20 PIII sirsa
Desilting and Repair of Storm water Drain adjacent to Bitumen road from sector-30 to Power Grid Colony ,MC Thanesar ,Kurukshetra.
Cleaning of existing storm water drain using bucket type de-silting machine complete in all respect, HSIIDC, MIE Part-A Bahadurgarh
Desilting and Repairing of Storm Water drain at main bazaar and various other places of rewari town complete in all respect
De-silting of storm water drain 1000 mm and 400 mm dia. by super sucker machine, Udyog Vihar, Phase-1, Gurugram
Cleaning of existing storm water drain line using bucket type de-silting machine complete in all respect, HSIIDC,MIE part-B
Cleaning of existing storm water drain using bucket type de-silting machine complete in all respect at MIE part-A, Bahadurgarh.
Strengthening/Rehabilitation of 2400mm Storm Water Drain from Bus Stand Rotary to Traffic Light Sector 4/11 Panchkula by MWSL Technology.
Up-gradation of infrastructure of Drainage Scheme in Industrial Sector-21 and 26, Bhiwani. Providing external storm water drainage scheme Construction of 2 Nos. 450 Sft. area staff quarter, 1 No. control room including Public Health amenities and Ele
Up-gradation of infrastructure of drainage scheme in Industrial Sector-27 and 28A, Hisar. Providing external storm water drainage scheme Construction of Two Nos. 450 sft area staff quarter, 1 No. Control Room including Public Health Amenities and Ele
Construction of RCC Nala From H/o Desh Raj to Bus adda i/c Dismentling of old Brick Nala at village Saran
Constructing underground RCC NP2 pipeline drain for dewatering of flood water of village Laluwal from RD 1560 to 0 linking with existing pipeline drain Houdi at RD 6110 outfalling into Rangoi Nallah at RD 6.35 Km left side
Completion of R.C.C Water Nala at village Dariyapur
Construction of nala in mohalla koliyan to underpass
Construction of RCC Nala at village Akheri Madanpur
construction of rcc nala 1.5x1.5 at village Matanhail
CONST OF STREET(ZP) FROM NALA DAKROGH TOWARDS JUNGLE RASTA AT VILL NALA DAKROGH GP JABROT BLOCK PINJORE
const of rcc nala from h/o harish gujjar to old nala at village dayal garh block jagadhri
Repair of Nala, Patch Work and RCC Slab on Nala inWard No. 1 to 3 in MC Kanina
Repair of Nala, Patch Work and RCC Slab on Nala inWard No. 10 to 13 in MC Kanina
Const. of R.C.C. Nala from Main road Boh to Main Nala near Boh Ground in ward no. 03
Hiring of Machinery for cleaning/de-silting of Gaunchi Nallah from hardware to gaunchi nallah and bata flyover to mujesar disposal in Ward No.02, Ballabgarh.
A/Mtc of L/s work in Nallah Area in Sector- 4 Panchkula. (Mtc of grassy lawn of Nallah Area and all other works contingnet thereto)
Hiring of Machinery Cleaning/ De-silting of nallah of Gaunchi Nallah from Shivalik School disposal puliya to Tewatia Petrol pump Sohna road Div. I NIT Faridabad.
A/Mtc of L/s work in Nallah Area in Sector- 4 Panchkula. (Mtc of grassy lawn of Nallah Area and all other works contingnet thereto)
Const. of Wastewater nala and nali
Construction of drain type 2 and relaying of IPB tiles in from h/o Bijender to main road near PNB in sunaria kalan ward no. 22, MCR
Construction of Drain no 1 from G.T Road to Sector 29 Via Devi Mandir, Kutani Road, Sanoli Road, Bhram kumari and Sector 25 and colours Grassi Paver
Construction of Drain From H/o Satveer Member to Akash plot and Akash plot to Maharana Pratap park and Maharana Pratap park to H/o Satveer Member
F Rangran 6.08 UPGRADATION OF STREET FROM GURUDWARA TO KASHYAP CHOUPAL and CONSTRUCTION OF DRAIN TO POND AT VILLAGE PHALSANDA RANGRAN IN BLOCK BABAIN IN DISTRICT KURUKSHETRA.
Construction of drain type II from H O Ramesh S o Dalle Singh to H o Balwan Master Dada Bhaiya wali Gali in ward no 15 Sampla
Const of nala from ambedkar bhawan to ho kadku, cont of street frm nurshah pirr to kisanpura rd, const of nala frm main gali to ho amarnath, const of street frm ho rajiv gandhi to ramesh hair dressure, const of nala frm puliya to nala pratap nagar
Desilting/Cleaning of Nala in MC limit area MC Barwala
CONSTRUCTION OF NALA RAMKUMAR TRACTOR MYSTERY TO AMAR JYOTI SCHOOL
Khasa Mahajan Dhani waste water nala to pond with Brick work for Waste water nala (CMA)
Repair of Drain Nala and ILPB Of Phirni at Village Pingli Block Chirao
Construction of Drain from h no 20 A Surinder Niwas to h no 15 Saini Niwas,89/17 A to Main Drain and h no 67 to near Hanuman Mandir Mohinder Nagar Ward no 12 Ambala city
Internal clearance of Rori Ghaggar Drain from RD 10000 to 130750
Cleaning of existing storm water drain (Culvert Box Drain) along National Highway 10 by Mechanized System using Supersucker-cum-desilting machine at HSIIDC, Industrial Estate, Bahadurgarh.
Cleaning of Nala Before on Set of Monson as preventive measure to control Flood live situation at city in MC Kalanaur
Desilting of existing storm water drainage system Nuh town including the cost of loading and unloading of the sludge from the drain with hiring of JCB Machine and Sewer man and skilled mason its disposal with mechanical upto a suitable site beyond t
Internal Clearance of Nathusari Link Drain from RD 0-9750 outfalling at RD 104000-L Hisar Ghaggar Drain.
Operation and maintenance of sewerage system and Storm Water drainage system in eastern Side of Railway Line from ward no-01 to 05 Under Municipal Corporation, Sonipat and all other works contingent
for non pressure underground sewerage through trenchless technology in sector 50 Gurugram Connection of sewerage line storm water drainage for new pocket in sector 50 Gurugram and all other works contingent thereto
Operation and maintenance of sewerage system and Storm Water drainage system in Western Side of Railway Line Under Municipal Corporation, Sonipat for 1 year and all other works complete in all respect.
Operation and maintenance of sewerage system and Storm Water drainage system in eastern Side of Railway Line from ward no-06 to 10 Under Municipal Corporation, Sonipat and all other works contingent
Construction of Internal roads, providing Water supply, Sewerage system, Storm water drainage system in Mukhyamantri Shehri Awas Yojana plots in Housing Board site in Sector-9p, 10 and 11p Mohindergarh ( Deposit Work)
Construction of Street, Drain and RCC Nala from Shop of Islam to Community Centre, RCC Nala From Community Centre to Monu Pandit and Construction of Street from Community Centre to Shamshan Ghat near Raipur Dairy Complex, Ward No.-12, For l/c soceity