Loading…
Loading…
8,333 results • Best match
Restoration on road km 0 00 to 5/00 SH C O R Wall at RD 2 270 to 2 290 2305 to 2320 2 540 to 2 560 3 9 00 to 3 930 to 3 980 U shape drain km 4 300 to 5 00
Widening and CD/MT of link road to Bhureshwar Mahadev Temple in km 0/0 to 2/315 (SH ROFD, R/wall, CD works , GSB , WBM-II III, M/T works , Road side V-shape drain and Parapets etc. in km 0/00 to 2/315
MT on Link road Olinda to Bohru from km0000 to km 11090 under NABARD RIDF XXVII SH Formation cutting Co Retaining wall CD work CC Pavement PL GSB WMM PL Bituminous concrete Road side Drain Parapets PF Kilometer stone Sign Boards in Km 0000 to 11090
Restoration of rain snow damage to RCD road km 0 00 to 92695SH hiring of JCB Excavator Cum Loader for removal of snow slips Laying of moorum on road surface maintenance of drain and reapir of shoulders from km 3000 to 49500 and various link roads
R/o road on Mehach Dhar to Shilh via Badhar road KM. 0/00 to 8/00 (SH Removal of slips and C/o unlined drain in Km. 0/00 to 8/00 and C/o 900 mm dia hume pipe culvert at RD 0/860)
Job 6 Construction of link road from Baba Beli Ram Dera to Ward No. 6 of Village Lal Singi Tehsil and Distt. Una at Km. 0-0 to 1-200 G.P.Lalsingi Sub Head C.O C.C Pavement and drain at RD. 0-0 to 0-138 Under MMSY
A R M O LWSS Shimla Town from Gumma SH Restoration of flood Rain damages at LWSS Gumma including restoration of New Head weir drain chambers R wall wire crates and anchoring to the gravity line 400 mm dia and 300 mm dia from New head weir
Periodic Maintenance of Nainavati to Karad road KM. 0/0 to 11/795.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 1/00 to 3/00 for the year
A.R and M.O on NH505A Km 0.00 to 17.00 SH. C.O 600 mm dia Hume Pipe Culvert at RD 5.738 P.F 600 mm dia Hume pipe for drain at RD 5.517.50 to 5.560 R.Peo Chowk and 5.592.30 to 5.602.30 ITBP Diversion Road along with PCC Chamber etc.
Periodic Maintenance of Nore to Neether road KM. 0/0 to 44/765.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 36/00 to 39/00 for the year
Construction of road from Kasial to Village Punal in GP Luthial Km 0.0 to 1.530 SH Construction of formation cutting, 900mm dia HP culvert at RD 0.227 and 0.407, U shape drain at RD 0.121 to 0.225 and cement concrete pavement at RD 0.121 to 0.250 Und
Periodic Maintenance of Nore to Neether road KM. 0/0 to 44/765.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 2/00 to 6/00 for the year 20
Periodic Maintenance of Behna Dalash road KM. 0/0 to 14/00.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 1/00 to 6/00 for the year 2021-
Periodic Maintenance of Nore to Wazir Bowali road KM. 0/0 to 37/00.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 13/00 to 15/00 for the
C/o link road to Harizan Basti Amboa Km. 0/0 to 2/0 (SH. C/o balance work of Steps for Causeway Downstream side at RD 1/800, C/o 3.00 mtr span RCC slab Culvert at RD 1/650, Retaining wall and U-shape Drain)
Widening and Tarring of Shallaghat Kothi Kolka Chamyawal road Km 0/0 to 11/960 (SH - Formation defiance i/c retaining walls, CD works, GSB, WBM Grade-II and III, MT works interlocking paver block pcc parapets, V shape drain Singh board in Km stone i
Job 3 Construction of and M/T link road from Village Jankaur Pekhubela to Bhadouri up to Swan Nadi Tehsil and Distt. Una km. 0-0 to 0-800 Sub Head P.L Filling, GSB, U-shape drain in RD. 0-0 to 0-450 Under OTMNP
Improvement of Beehan to Karoa road under Industrial corridor Km. 0/0 to 5/0 (Bharwain to Dehipukhar via Karoa road portion 7/0 to 12/0) (SH. Providing and laying cement concrete pavement and construction of V-shape and U-shape drain at various RDs)
Improvement and widening of motorable road to Village Sapni Km 6.200 to 8.300. SH-P.L G-I, G-II, G-III and 20mm thick premix carpet with seal coat and C.O P.C.C V-Shape drain at RD 6.520 to 6.610 and 7.150 to 8.360. Under BADP.
Periodic Maintenance of Nagan to Khenvi road KM. 0/0 to 12/240.(SH- Providing annual surfacing including surface correction with WBM grading- 3 , C/O road side drain and providing and applying road marking strips in km 4/00 to 6/00 for the year
C/O Link road Village Kajwa Km. 0/0 to 2/150 (SH P/L WBM G-ll, G-lll and M/T alongwith PCC road side drain in Km. 0/0 to 1/0 and 900mm dia hume pipe culvert at RD. 0/090,0/195)
Construction of Helipad at Sanghnai Tehsil Ghanari Distt Una SH Const of approach road for Helipad by providing and laying GSB WMM and Tarring in km 000 to 0700 and Retaining wall at RD 0500 to 0650, protection wall including drain from RD 00 to 026
Recarpeting of road from NH 105 to Doctor Reddy and other Industries at Bhud and upto village Bhud, G.P. Malpur. (SH C/o U shape drain, P/L WBM grade 1,2 and 3, and P/L 40mm Bituminous Concrete over 50 MM Dense Bituminous Macadam , thermoplastic p
Construction of Bhagyanghat Lana Miun road km 0/00 to 3/00 (SH Construction of 900 mm dia Hume pipe culvert along with both side wing walls at RD 1/180 Providing and laying WBM Grading -1 and unlined drain between km 0/00 to 1/500).
Restoration of rain damage on Churi to Lylh road Km 0/00 to 4/00 UNDER PDNA ( SH Construction of RCC 3.00 Mtr slab culvert at RD 2/900 to 3/805, PCC Drain at RD 1/00 to 1/120 and 1/200 to 1/474.
Restoration of rain damages on link road Amb to Athwan road km 000 to 2000 SH Const of Retaining wall at RD 1425 to 1466 both sides Breast wall at RD 1496 to 1506 LHS 1506 to 1520 with Ushape Vshape drain 1506 to 1549 both sides
Periodic Maintenance of Nore to Neether road KM. 0/0 to 44/765.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 36/00 to 39/00 for the year
Periodic Maintenance of Arsu Shillikot road KM. 0/0 to 8/150.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 3/00 to 6/00 for the year 202
Construction of Link road Pirsaluhi (Kangra) to Kitpal (Hamirpur) km 0/000 to 5/740 in District Kangra (HP)(SH Formation cutting, passing places,C/o R/walls, CD works, P/L GSB,WMM,tarring work,side drain and parapets, , road sign board, C/o 102.511 m
Up-gradation of Dhabas to Sarahan Road Km. 0/0 to 23/895 HP-09-696 SH 0/0 to 10/000 km for ROFD Protection works, Road side drain, GSB, WBM, BC AND BM, crash barrier , road furniture, dumping site 0/0 to 10/0
Construction of road from Patta Jatian road to Paplah bridge via Patta Brahmana in GP Patta SH Construction Edge wall with V shape drain at RD 1.400 to 1.432 and Breast wall from RD 2.245 to 2.295 LHS and providing and aying CC Pavement at RD 5.54
Restoration of rain damages on NH-305 by construction of wire crate retaining wall at Km. 28.005 to 28.060 and breast wall at Km. 28.005 to 28.045 and V shape drain between Km. 28.00 to 28.130 for the year 2020-21 in the state of Himachal Pradesh.
R/R damages on Prem Nagar Chandog Girdh Sandrol road Km 0/0 to 15/0 (SH- C/O 900 mm dia Hume pipe culvert alobhwith wing wall at RD 9/255 PCC U shape drain at RD 9/200 to 9/330 damages due to disaster.
Const of link road Bhaira to Sathothar km 000 to 1800 SH Const of 8 meter RCC slab culvert at RD 1474 with approaches Const of Ushape drain at RD 1370 to 1425 and Const of Retaining wall at RD 2930 to 2953 RHS under MMGSY
Periodic Maintenance of Arsu Kundakod road KM. 0/0 to 3/120.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 1/00 to 2/00 for the year 202
Periodic Maintenance of Arsu Kundakod road KM. 0/0 to 3/120.(SH- Providing annual surfacing including surface correction with WBM grading- 3 , C/O road side drain and providing and applying road marking strips in km 1/00 to 2/00 for the year 20
Restoration of rain damages on link road Balugaloa Gheen Khabbal Kholi road Km 0/000 to 8/000 in Tehsil Baroh Distt Kangra (HP) (SH-Construction of Breast wall at RD 3/060 to 3/072 and U-shape drain at RD 3/060 to 3/095).
Annual Periodical Maintenance for the year 2021-22 On Chambok Lindoor road Km. 0/0 to 5/0 SH- Providing and laying 20mm thick premix carpet with seat coat including BUSG in Km. 0/0 to 2/750 and Construction of PCC drain 300 mtrs. length.
Periodical renewal coat to Jamta Rajban road km 23/0 to 43/0. (SH- P/L G-III and 30mm thick bituminous concrete in km. 32/0 to 33/0 and 34/0 to 35/0 and road side V-shape drain in various RDs Under AMP.
Restoration of rain damages on link road from Guler to Gathutar in km 000 t0 3500SH Co Retaining wall from RD 1280 to 1295 and Cement Concrete Pavement from RD 1100 to 1125 2030 to 2095 and UShape drain from RD 2700 to 2745 Under NDRF
Restoration of rain damages on C.o link road from Darkata Tripal road to Sand in Km 0.0 to 1.500 SH ROFD Construction of Hume Pipe Culvert at RD 0.305 V-Shape Drain at between RD 1.200 to 1.500 Providing and laying Cement concrete pavement from RD 0.
Restoration of Rain snow damage to RCD road km 0 00 to 92 695 SH Hiring of JCB Rxcavator cum loader for removal of Snow slips, laying of moorum on road surface maintenance of drain and repair of shoulders from km 21 195 to 51 00
Restoration of Rain Damages on Link road to village Talangna km. 0/0 to 8/00(SH P/L WBM G-I from km. 0/00 to 0/600 and C/O Unlined drain from km. 0/00 to 0/600 in damage portion )Under PDNA 2023
Providing metalling and tarring of road from Bayal (Batching plant near steel bridge) to Village Koyal in project affected area of Rampur HPS Km. 0/00 to 8/700. (SH- M/T works, side drain, Parapets and protections walls at various Rds. in Km. 5/060
Restoration of rain damages on C.o link road from Gugga Mandir to Harizan Basti GP Haripur in Km 0.0 to 1.500 SH ROFD Construction of Hume Pipe Culvert at RD 0.305, V-Shape Drain at between RD 1.200 to 1.500 Providing and laying Cement concrete pave
Job 6 Construction of MCH building at Una Distt. Una Sub Head Construction of link road to Upper Arniala ward No 1 from Una Aghar Mandi road with Retaining Wall, U-shape drain and Cement Concrete pavement in km. 0-0 to 0-150 MCH Deposit Work
Restoration of Rain Damages on Pullilani Bhallar Bhallona road km. 0/0 to 16/0 (SH C/O PCC R/wall from RD. 7/475 to 7/485 and C/O Unlined drain in km. 0/0 to 9/0 in some reaches ) Under PDNA -2023
R/R damages on link road Tallad Ghat Award road in km 0/0 to 5/00 (SH C/O B/wall and V- shape Drain at RD 1/230 to 1/280and B/wall 3/120 to 3/140, 4/140 to 4/158) under PDNA
Restoration of rain damages on Bhogarwan to Samleta road km 0.0 to 13.515 SH Providing and laying cement concrete pavement at RD 12.00 to 12.315,U-shape drain with edge wall at RD 12.00 to 12.100 RHS 12.100 to 12.230 LHS and Retaining wall at RD 12.1
Restoration of rain damages on Khabli Dosarka to HLB Nadaun Road in Km 0.00 to 7.300 SH Construction of Cement concrete Berm 4.100 to 4.190 4.150 to 4.280, 4.860 to 4.890 5.010 to 5.040 V-Shape Drain Bed 4.100 to 4.240, 4.150 to 4.200 4.610 to 5.000