Loading…
Loading…
8,330 results • Best match
SH- construction of B-wall with seeting places and V-shape drain)
C/O hume pipe culvert, metalling and tarring and U shape drain.
CO C.C. Pavement and U-Shape drain at RD. 0.500 to 0.700
Construction of V-Shape Drain at RD 33/000 to 35/300
SH C O side drain in KM 0 0 to 0 750
SH C.O B.wall, R.wall and V.shape drain at RD 22.920 to 22.980
SH Construction of U Shape drain between Km0/030 to 0/630
Construction of trench weir and drain in Banner Khad Under JJM-I
SH C O U Shape drain portion at Rd. 0.0 to 0.500
Removal of slips and construction of unlined surface drain at various RDs)
Construction of V-shape drain between Km. 0/600 to 1/050.
SH C/o V Shape drain in Km11/315 to 11/780
including thermoplastic paint edge line Vshape drain at essential RDs under PMGSY
SH C/o V Shape drain between Km27/0 to 29/0
SH C o U shape drain portion at RD 0.120 to 0.390 )
Periodical maintenance by Bitumen concrete and C/O PCC U-shape drain.
Construction of U-Shape Drain at RD. 7/400 to 7/515)
C/o U-Shape drain between Km. 2/850 to 3/00
C/O Drain to protect the Pump House Near Takoli Sabji Mandi
U-shape drain at 0/045 to 0/160 ( L 115.00 Mtr)
C/O U-shape drain from km.135/350 to 136/000
C/O U-shape drain from km.135/330 to 135/350
C/O V-shape drain from km.5/400 to 5/850
C/O U-shape drain from km.134/000 to 134/800
C/O U-shape drain from km.141/350 to 142/080
C/O U-shape drain from km.132/600 to 133/300).
C/O V-Shape Drain Between Km 0/000 to 2/700)
Construction of New Academic Block G Plus 4), modern digital library (LGF Plus 1 Plus G Plus 2), Academic Block for UILS at Ava Lodge (G Plus 3) and multi-level car parking (Basement Plus 3 Plus G plus 1) including development of site. (SH ... of drainage plan, ...
C/O 102.50mtr. span PSC Box girder type bridge over Bakkar Khad at RD. 4/594 and C/O 50.00 mtr. span PSC Box Girder type bridge over Jiana Nallah at RD. 4/300 on Purli to Kujabalh via Jiana road. Package No. HP-03-119 2018-19
PROVN OF 1 X 15 KVA DG SET AND 2 X WINDOW AIR CONDITIONER AT K NALLAH, PROVN OF 2 X 65 BHP WATER PUMPS AND SOLAR STREET LIGHTS ON INTERNAL ROADS AT MANDI AND SPECIAL REPAIR TO BLDG NO. T-27 AT BG UNDER GE 881 EWS
SH C o intake chamber Providing laying jointing of HDPE pipe of various dia Co storage tank c o barbed wire fencing around the storage tank C o barbed wire fencing around the storage tank C o nallah crossing C o public stand post 3 Nos C o prote
Construction of Intake Chamber near Jott ka Nallah Installation and Energisation 2 Nos Hand Pump LJ and Testing of GI pipe 32mm Dia Rising main Prov Laying of PPR Pipe 25 mm Dia 1780 Rmt 32 mm Dia 850 Rmt at Village Raj Gundha and Kukar Gundha etc
SH C O Nallah intake Chamber Phase I II RCC sedimentation tank 30000 ltrs cap at Lower Mohaun RCC filter bed 75 sqmm 37.50 sqm each two units at Lower Mohaun RCC main storage tank 90000 litrs at Taru RCC main storage tan 35000 ltrs cap at Kushla RC
Sh Nallah head weir check dam at source const of intake RCC BP Tank const of Raw water tank const of slow sand filter const of sed tank const of RCC main storage tank and sub main storage tank ELJ and testing of GI Pipes of various dia
Periodic Maintenance of Nore to Wazir Bowali road KM. 0/0 to 37/00.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 13/00 to 15/00 for the
Periodic Maintenance of Nore to Wazir Bowali road KM. 0/0 to 37/00.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 13/00 to 15/00 for the
Balance work for the C.O ITBP road leading to Indo China Border road from Charang Chad to Kota Dogri Km. 0.00 to 6.00. SH. Providing and laying Balance OGPC from Km 4.425 to 6.00 and C.O Protection work solid cause way V.Shape drain and W Metal crash
C/o link road from Chamb Bhujan road to Palangiri village Kangoo Ka Johar Km. 0/0 to 0/800 (SH- Providing and laying Grade-I, Grade-II and premix carpet, R/wall, W/wall, B/wall, Drain and parapets in Km. 0/0 to 0/800)
Periodic Maintenance of Arsu Shillikot road KM. 0/0 to 8/150.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 3/00 to 6/00 for the year 20
Periodic Maintenance of Nainavati to Karad road KM. 0/0 to 11/795.(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 1/00 to 3/00 for the year
Special repair to Bherewala Matrallion road Km. 0/0 to 1/600. (SH- Providing and laying wet mix macadam in essential reaches and 20 mm thick open graded per-mix carpet and C/o V-shape side drain in km 0/0 to 0/800. (on LHS).
Periodic Maintenance of Amrabag to Tandi road Km. 0/00 to 12/500 .(SH- Providing annual surfacing including surface correction with WBM grading-3 , C/O road side drain and providing and applying road marking strips in km 0/00 to 2/00 for the yea
Special repair on Nehar to Maitri Setu Bridge Km. 0/0 to 2/500 (SH- ROFD at RD 1/444 to 1/220, C/o U-shape drain, Edge wall and C/o Protection work i.w. wire crate in valley side at RD 1/100) NTPC Deposit
SDF/2025/630, R/O (Repair of) RRD on Pragpur to Chambapattan road Km 0/00 to 3/00 (SH P/F interlocking paver blocks at RD 0/570 to 0/630 and C/o V shape drain at RD 5/572 to 5/622) Deposit Work.
Construction/Improvement on circular road i Shimla Town (SH C/O Breast wall and protection work between RD. 148/300 to 148/345 at Ranjan Hotel , RD. 148370 to 148/385 and covered drain between RD. 148/310 to 148/405 on both side of panchyat Bhawan
Construction of Baridhar Garudnag Deothal Chontru road km 0/000 to 4/500 (SH- Tarring in km 0/000 to 2/000 ,V-shape drain in km 0/000 to 2/000 and 900mm dia RCC hume pipe culvert at RD 1/250,1/850,) W P
Restoration of Rain Snow damage to RCD road km 0 00 to 92 695 SH Hiring of JCB Excavator Cum Loader for removal of snow slips laying of moorum on road surface maintenance of drain and repair of shoulder from km 21 95 to 51 00
Restoration on road km 0 00 to 5/00 SH C O R Wall at RD 2 270 to 2 290 2305 to 2320 2 540 to 2 560 3 9 00 to 3 930 to 3 980 U shape drain km 4 300 to 5 00
Widening and CD/MT of link road to Bhureshwar Mahadev Temple in km 0/0 to 2/315 (SH ROFD, R/wall, CD works , GSB , WBM-II III, M/T works , Road side V-shape drain and Parapets etc. in km 0/00 to 2/315
MT on Link road Olinda to Bohru from km0000 to km 11090 under NABARD RIDF XXVII SH Formation cutting Co Retaining wall CD work CC Pavement PL GSB WMM PL Bituminous concrete Road side Drain Parapets PF Kilometer stone Sign Boards in Km 0000 to 11090