Loading…
Loading…
8,334 results • Best match
R/R damages on Nanj to Nanj Pul road Km. 0/00 to 1/00 (SH C/o PCC B/wall at RD 0/300 to 0/345, 0/525 to 0/560, 0/735 to 0/805 and V shape drain and Metalling and Tarring in Km. 0/00 to 1/00) Under PDNA 2023
C/O Guru kund talli road in Km 0/0 to 12/200 (SH C/O Wire crate in R/wall at RD 6/425 to 6/650, V-shape drain at RD 6/400 to 6/460, Gr.-I, Gr.-II, Gr-III and Interlocking tile at RD 6/400 to 6/460) Under PDNA
AMP for the year 2024-25 on Rural roads 1 Pragpur to Sr Sec School Pragpur road-VR0140 SH Consruction of CC pavement in Km 0/800 to 0/870 1/900 to 1/200 2 Nakki Khad to Garli road VR 0132 SH PCC Vshape drain from RD 0/450 to 0/521 3 Basalag to Ch
Periodical renewal on Haripur to Jamnighat road km. 0/0 to 2/400. (SH P/L G-III for repair of pot holes and 30 mm bituminous concrete in km. 0/0 to 1/0 and 1/0 to 2/0, road side furnitures and Road side V-shape drain in various RDs). under AMP for
DSGN CONST OF RCC PCC R WALL B WALL WING WALL OF VARIOUS SIZE AND V SHAPE DRAIN APRCH SLAB INCL PROOF CHECK OF DSGN DRG SURF WK ON APRCH RD TO BILLING BR AT KM 113pt200 ON MS RD UNDER 70 RCC 38 BRTF P DPK IN HP STATE UNDER JOB NO 404 409 RE RAE
Restoration of rain damages on link road Daloh to Mundkhar road km 0/00 to 1/500 SH C/o B/wall at Rd 0/400 to 0/430,0/010 to 0/025,0/800 to 0/820 and construction road side U-shape drain at Rd 0/500 to 0/700 and construction of road side V-shape drai
Restoration of rain damages on Kainthly to Ladhan Road Km 0/0 to 4/500 (SH Providing R/walls at Rd 0/010 to 0/030,2/485 to 2/493,2/503 to 2/510,2/570 to 2/580,3/538 to 3/555 and U-Shape drain at Rd 2/850 to 2/940) (UNDER PDNA-2023)
C/O CD and M/T on link road Jamu to Jamdagi Temple km. 0/00 to to 2/500 (SH P/L WBM G-I, G-II, and M/T alongwith road isde drain in km. 0/00 to 1/00 and 900 mm dai Hume Pipe Culvert from RD. 0/240 and 0/980)
M/T and CD Work on Sangrah to Tikkri road km. 0/00 to 3/400 (SH Balance work for P/L WBM G-1 in km. 2/495 to 3/400, G-II, G-III and M/T along with road side drain in km. 0/00 to 1/00 and 2/495 to 3/400)
C/o of road from Kadharghat to Palag Serikadi Km 0/0 to 7/03(SH Formation cutting 5/7 metre wide in KM 0/0 to 7/030,c/o of CD works for 900 mm dia RCC hume pipe culvert,unlined surface drain,wire crate walls for dumping structure in Km 0/0 to 7/03
Restoration of rain damages on NH 503 Extn Km. 0/0 to 44/700 (SH Construction of R/wall at RD 19/130 to19/150(RHS),35/270 to 35/280 (LHS),35/400 to 35/422 (RHS) and C/O U shape drain at RD 35/270 to 35/300 (LHS) in the state of HP
C/o balance work of road to village Neri Km. 1/195 to 2/150 (SH- C/o R/wall, PCC Parapets, V-shape drain, Providing and laying soiling G-I, G-II, G-III at RD 1/720 to 2/150 and 20mm thick premix carpet with seal coat at RD 1/195 to 2/150).
C/o of Exist road from HRTC Bus Stand Ghumarwin approach road from Bus stand to Seer Khad Bridge on NH-103 km 0/00 to 0/300 SH C/o 600 mm dia Hume pipe culvert at Rd 0/210, C/o U-shape Drain,Steel work for Railing work, Providing and laying paver blo
C/O M/T on Link road from Renuka Ji to Jataun Km. 0/00 to 3/900 (SH - P/L WBM G-1 G-ll, and M/T from Km. 2/00 to 3/00 alongwith road side drain from Km. 0/00 to 1/00 and 2/00 to 3/00 and Essential Parapets ) under MNP
Widening/Improvement of MRR via Lakkar Bazar km. 147/825 to 153/075 (SH C/O widening of road at 149/500 to 149/560, C/O U-Shape drain between km. 147/900 to 150/100 and C/O raised foot path between km. 147/900 to 150/100 and C/O raised foot path betw
Restoration of rain damages on link road Sidh Chano mandir Dadhol Kallan to Bhel km 0/00 to 1/200 SH Proposed Solid cause way at Rd 0/030 and Construction of road right side V-shape drain at Rd 0/720 to 1/110 and C/o R/wall at Rd 0/390 to 0/405, 0/8
Restoration of link road H B Paplah Km 0 00 to 4 225 SH CO R wall at RD 0 150 to 0 172 P L interlocking paver block at RD 0 500 to 0 620 and CC pavement at RD 0 120 to 0 220 and V Shape drain at Km 0 150 to 0 250 PDNA
Construction of Mattal Bakhog Nag Timba road Km 0/0 to 3/0 ( SH Construction of PCC R/wall at RD 2/135 to 2/155 and 2/735 to 2/750 and Preparation of Sub-Grade and Consolidation of Sub-Grade G-I and unlined drain between Km 1/0 to 3/0) under MNP
Job 4 Restoration and Repair of road from Guga Mandir Haroli upto Payjal Yojna Haroli RD. 0-0 to 2-100 Sub Head Providing and laying 80mm thick BC at RD 0-045 to 0-320, C.O Retaining wall at RD 0-120 to 0-140 and C.O V-shape drain at RD 0-060 to 0-10
C/O link road from village Naiyan Basti Baliwal to Mohalla Rajputtan Km 0/00 to 1/600 G. P. Baliwal SH C/O CC pavement at RD 0/00 to 0/358 and 900 mm dia pipe culvert at RD 0/020 and C/O U shape drain at RD 0/00 to 0/045-RHS)- under MMSY
Construction of road from main road to harizan basti Shaya Chhabron km 0/0 to 1/725 (SH Providing and laying WBM G-I, G-II, G-III and Taring in km 0/0 to 0/550 , C/O unlined drain and C/O 900 mm dia RCC Hume pipe culvert alongwith both side wing wal
Restoration of rain damages on Chamba Tissa road Km 32/250 to 48/0 (SH Construction of R/wall at Rd 40/190 to 40/210, 41/315 to 41/338 and 41/430 to 41/450, drain at Rd 40/800 to 40/900 and C.C Pavement at Rd 40/170 to 40/220) (Under PDNA 2023)
Repair Renovation and Upgradation of Kennedy Cottage complex including CPWD parking Campus under H.M. Section, Shimla including electrical work. SH Provision of brick drain with M.S. Grating, covering of water tank shed, developing guard post, porch area with toughened glass, fixing GRC Screens, false ceiling with PVC panels and connection of sewer line with authority line (Balance Wok).
Construction of link road Gehra Sumari G.P. Bharari to Baroun SH Improvement / widening of road at RD 0/030 to 0/095, C/o Breast Edge wall Left side at RD 0/037 to 0/055 and Right side at RD 0/043 to 0/055 and V-shape drain at RD 0/00 to 0/104 Un
Restoration of rain damages on link road Badhaghat to Kassaru road km 0/00 to 1/600 SH C/O B/wall at Rd 0/318 to 0/338 and Construction of road side U-shape drain at Rd 0/340 to 0/425 and P/L Cement concrete pavement damaged reaches Rd 0/320 to 0/450
Special repair on Shimla Mandi road via Tattapani KM. 52/250 to 115/00 (MDR 76) (Sub Head Construction of V shape drain 86/825 to 86/940 (RHS) and U shape drain with grating from RD 86/975 to 87/140) (LHS)
P/L 30mm thick bitumen concrete, PCC drain and 2.5mm thick applied thermoplastic strip km. 0/0 to 2/0) HP0301VR0031.(ii) Periodical renewal on link road to village Sapahal. P/L 30mm thick bitumen concrete, PCC drain and 2.5mm thick applied thermoplas
C/o U-shape drain PCC drain around the building with iron grating, wire fencing with barded wire around the ITI campus, levelling of the ground and construction of protection work ay ground laying of paver block of approach road and construction of
SH P.L WBM G-III in patches, 30mm thick bituminous concrete surfacing, edge strip in Km. 42.000 to 49.000, U-shape drain in Km. 48.225 to 48.315 and V-shape drain in Km. 43.650 to 43.780, 46.900 to 47.300 and 48.315 to 48.650
C/O U-Shape drain with edge wall at RD 0/00 to 0/150, 2/100 to 2/320, 2850 to 3/00 and U-shape drain at RD 0/250 to 0/610 and 1/580 to 1/780) Under PDNA
Construction of Retaining wall at RD 5/675 to 5/687, Unlined drain from Km 5/00 to 10/00 and U-Shape drain from Km 3/100 to 3/250, 3/650 to 3/800 and 8/150 to 8/300)
Estimate for providing 22 KV H T line to proposed 25 KVA Sub Station at Dev Kamrunag at Bain Nala in E Section Jachh under ESD HPSEBL Gohar Sub Head Erection of 22 KV HT line and Manual carriage of material from road side to site of work etc
E Tender on partial turnkey basis for prov 11 KV H.T Line, 3 PH L.T. Line for interlinking of exist L.D. System with proposed 11/.4 KV 100 KVA S/Stn Killa Plassi at Village Killa Plassi (T/Well Scheme) under Electrical Sub Division, HPSEBL, No I Nala
E Tendering for providing 11 04 KV 100 KVA Sub Station along with 11 KV HT and LT Line Kharshi at Dadu ka Nala in Electrical Section Gambar under Electrical Sub Division HPSEBL Subathu Name of Scheme GSC Scheme Code No HP TD DIS 338 2021 16435 on Tur
E-Tender on partial turnkey basis for prov. SOP to M/s Jaspal Filling Station by prov 11 KV HT Line, 11/.4 KV 100 KVA S/stn and 11 KV Metering Equipment for EV Charging Station in (E) Section Rajpura under Electrical Sub Division, HPSEBL, No-I Nala
SH C.O R.wall at Km. 45.065 to 45.080 and V.shape drain in Km. 44.850 to 45.100 Under PDNA
Construction of Unlined Surface Drain and Maintenance of Earthen Shoulders in between km. 52/180 to 64/0)
P/L Cement concrete pavement and V-shape drain at Rd 2/800 to 2/905.50) (Deposit work)
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher, CC pavement and V-Shape drain
(SH- P/L GSB,G-lll,B/wall r/wall in wire crate, earthen shoulder and katcha drain)
C/o Breast wall with V-shape drain at RD.29/015 to 29/165 in both sides
SH CO V shape drain at Rd 0 050 to 0 250 and 0 450 to 0 550
SH C.O wire crate R.wall at RD 61.610 to 61.630 and V.shape drain in Km. 61.390 to 61.600
SH Providing and laying grade III M/T and V shape drain in Km3/0 to 4/0
SH P.L Kharanja stone soling, C.O V.shape drain at various RDs and R.wall at RD 1.300 to 1.305
Construction of U-Shape Drain with Slab Cover in Km. 0/110 to 0/210) (Under RRD Head)
Construction of C.C. Pavement, V-Shape Drain and Paved Berms/ Shoulders at RD 26/400 to 26/600)
Providing and Laying Cement Concrete pavement and road side drain in between RD. 2/225 to 2/500
Construction Formation cutting, Passing places, Retaining walls, Missing CD, , Side Drain, Parapets, Cement concrete pavement and tarring work
SH Metalling/ Tarring C.D work R/wall and V-shape drain in Km 0/0 to 1/0