Loading…
Loading…
8,337 results • Best match
Providing and laying BUSG for correction layer Bituminous concrete in Kilometer 4-0 to 6-0 and construction of PCC Hill side drain
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 7/0 to 8/0
C/O C.C. pavement road at RD 3/470 to 3/710 and U/Shape drain at RD 3/550 to 6/640
SH providing and laying renewal coat by providing Bitumenous Concrete in Km0/0 to 2/0 including road marking c/o side drain
Formation Cutting ,Passing Places, R/Wall, C.D Works , GSB, WBM-II, WBM-III,Tarring Work, Side Drain , and Parapets)(Under Nabard RIDF-XXXI
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 5/0 to 6/0
Construction of approach path stackyard at Jal Shakti Divisional Store at Pakapather Jubbal ie stone soling site development and construction of CC drain
HIRING OF EXCAVATOR-CUM-LOADER D-76 FOR REMOVAL OF SLIPS, MAINTENANCE OF BERMS AND DRAIN ETC AT VARIOUS ROAD AT VARIOUS RDS).
Const. of R/wall, CC Pavement, U-shape Drain and Providing and laying metaling and Tarring at Rd 0/750 to 1/415).
Providing and laying 30mm thick Bitumenous concrete in km. 5/0 to 6/0 and construction of Side drain in 100 Metre length
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher and V-Shape drain between Km 0/000 to 1/000
Providing and laying 30mm thick Bitumenous concrete in km. 2/0 to 3/0 and construction of Side drain in 100 Metre length
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 4/0 to 5/0
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 0/0 to 0/500
(SH C/O Passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, cement concrete pavement, side drain and parapets)
P/L Grading II III 20mm thick premix carpet with seal coat and PCC side drain in Km 0/000 to 0/450
SH Providing and laying renewal coat with 2Cm thick premix carpet including profile correction layer, V-shape drain in Km 0.00 to 1.00
SH Providing and laying renewal coat with 2Cm thick premix carpet including profile correction layer, V-shape drain in Km 11.0 to 13.0
CO Intake Chambers and Providing Laying Jointing of RCC pipe to Drain out the Sewer Ponding near source Percolation well of LWSS Jahu
Construction of PCC Retaining wall at Rd.0/040 to 0/070 and PCC V- Shape drain Km.0/00 to 1/00
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 6/0 to 7/0
Providing and laying BUSG for correction layer, Bituminous concrete in kilometer 12-0 to 17-0 and construction of PCC hill side drain
SH Removal of unsuitable soils Dressing of berms C O unlined drain and Wire Crates Between K M 10 0 to 32 500
P/L WBM ,G-ll, G-lll , M/T along with road side drain in Km. 0/0 to 1/00 )Under SCSP
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 6/0 to 7/0.
Providing and laying 30mm thick Bitumenous concrete in km. 1/0 to 2/0 and construction of Side drain in 100 Metre length
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 9/0 to 10/0
Construction of RCC R/Wall at Km 17/430 to 17/461 and V-Shape Drain at RD 17/330 to 17/461
Providing and laying 30mm thick Bitumenous concrete in km. 4/0 to 5/0 and construction of Side drain in 100 Metre length
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 3/0 to 4/0
Providing and Laying WBM G-III, Providing premix carpet seal coat and C/o PCC Drain between Km 0/0 to 1/0
SH ROFD Providing and laying GSB WMM 25mm thick BC Hume pipe culvert V-shape drain in Km 0/0 to 0/250
Construction of V-shape Drain, is Gratings providing and laying Hume pipe culvert providing and laying Kharanja stone soling providing and laying PCC
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher and V-Shape drain between Km 3/000 to 4/00
Providing and laying 30mm thick Bitumenous concrete in km. 1/0 to 2/0 and construction of Side drain in 100 Metre length
Providing and laying 30mm thick Bitumenous concrete in km. 2/0 to 3/0 and construction of Side drain in 100 Metre length
SH Providing and laying GSB WMM PC at RD 0/0 to 0/510 and U-Shape drain R/wall at various RDs
Providing and laying 30 mm thick Bituminous concrete laying with paver finisher and V-Shape drain between Km 1/000 to 2/00
P/L interlocking paver block at RD 0/200 to 0/300 and V-shape drain at RD 0/185 to 0/315).
Providing and laying 30mm thick Bitumenous concrete in km. 2/0 to 3/0 and construction of Side drain in 100 Metre length
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 1/0 to 2/0).
Providing and laying 30mm thick Bitumenous concrete in km. 4/0 to 5/0 and construction of Side drain in 100 Metre length
Providing and laying Tack coat, Bituminous Concrete, Thermoplastic Paint and C/o V-shape drain in between Km 10/0 to 11/0
C/O R/Walls, missing C.D. work, WBM-II, WBM-III, Tarring, side drain and Parapets in Km 0/00 to 4/270 )
(SH- Hiring of JCB for removal of slips, Dressing of berms and construction of unlined surface drain of various roads at various RDs).
C.D Work, G.S.B, W.B.M-II, W.B.M-III, M/T, Road side drain parapets and Sign board in km 06/185 to 10/585
(SH- P/L 7 M/T work, C/O B/Wall, R/wall, Cross Drain, Parpits Km. Stone i/e five year maintenance)
C.D Work, G.S.B, W.B.M-II, W.B.M-III, M/T, Road side drain parapets and Sign board in km 0/0 to 06/185
(SH- Construction of V-shape drain various Rds in between Km. after removal of encroachment land at Km. 62/050 to 62/450
(SH Formation cutting, Passing places, R/Wall, CD work, GSB, WBM-II, WBM-III, Tarring work, cement concrete pavement, side drain and parapets)