Loading…
Loading…
8,346 results • Best match
Improvement,Passing places, R/walls,C.D. work, GSB, WBM-II, WBM-III, Tarring work, Side Drain, Metal crash Barrier, CC Pavement, Interlocking paver Block and parapets including routine maintenance for five years after completion of construction work
Formation cutting, Construction of passing places, Missing CD, side drain, Parapets, Crash barrier, CC pavement and tarring work including five year maintenance after completion Under PMGSY-II (Batch-I for, 2019-2020)Package No HP-02-06
SH Removal of land slide slips construction of embankment maintenance of earthen shoulder berms both unlined drain in hill sides trimming of grass and weeds and cutting of shrubs at various R.Ds between km. 3.000 to 7.000
Formation Cutting, Passing Places, R/walls, Missing C.D. work, GSB, WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABA
Construction of Pre- Engineered Building of Commercial Complex at Chhota Shimla Near Tibetan School With Light Gauge Steel Frame (L.G.S.F) Technology Under Shimla Smart City Mission SH. Left Out Work of Drain Greeting ,Glazzing, Electrical work inc
Improvement of Kotla behar Ghatti Bilwan Road km0.0 to 9/165 SH C.O R wall at various Rds P.l Interlocking concrete block pavement at Rd 1.700 to 1.800 and shape drain at various Rds under indstrial corridor
F/C Passing Places R/walls CD Works P/L GSB WBM-II WBM-III Tarring works, C.C. pavement, Road Side Drain and Parapet etc. and road furniture i.c. five years routine maintenance Under NABARD RIDF-XXVIII
Providing and laying BUSG Bituminous concrete in kilometer 1-0 to 3-0 and kilometer 5-0 to 6-0 providing and laying hot applied thermoplastic edge and construction of pcc hill side drain 400 metre length
CERTAIN REPAIR TO DRAIN FENCING GATE RETAINING WALL COMPOUND WALL TOE WALL AND OTHER ALLIED WORKS IN THE UNIT OF AVERIPATTI JHAKRI AND MATIANA IN THE AREA OF AGE BRII PRITHI MIL STN UNDER GE 863 EWS
C/o ROFD, construction of retaining and breast wall, CD works (HPC) Slab culvert, road side drain, PCC parapets, GSB, WBM, Gr-II and III, tarring works, sign boards including five year maintenance) under NABARD-RIFD-XXIX
Construction of Hume Pipe culvert 900 mm dia at Rd. 8/330, Construction of R/Wall at Rd. 8/285 to 8/322 and Unlined side drain 0/00 to 1/180) (Under BSP Head DC Deposit)
P/L 25mm thick bituminous concrete in kms 2/0 to 3/0 and G-III with 20mm thick premix carpet in patches and U-shape drain at RD 2/300 to 2/400 and kms stone
R/O Rain damages on various road under Subathu Sub-Division Subathu Section.(SH Hiring of JCB/loader Cum-Excavator for Removal of slips and Clearance of drain and hiring of Tipper for shifting of earth etc)
R/o damages to various roads under Subathu Sub-Division) (SH Hiring of Excavator Cum loader along with Tipper for removal of Slips, C/O unlined drain , disposal of muck etc under Subathu Sction )Job No-2
Gear Lever Knob, Gaiter, Horn, O ring, Base Radiator Mtg, Top Tank Cap, Stud, Protection, Flexible hose, Hyd Flexible hose, Console LH, Console RH, M8 Hex Screw, Hose Oil Drain, Solenoid Brake Valve, Hose Assy, Hyd Strainer
Cutting of bushes and clearing of side drain along Pen Stock of Gumma Power House , repair of damaged railing and wall at fore bay and repair of roof of Desilting Tank at Intake of Gumma Power House
Hiring of earth cutting/ excavating machine for removal of slips/ Dressing of berms, clearance of side drain etc. (1) Silhbudhani to Sudhar road (2) Sudhar Swar Hurang road (3) Silhbudhani Kungri Kortang road and other road etc.)
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, Plastic cell filled cement concrete pavement and Tarring work including five years routine maintenan
R/o damages to various roads under Chandi Sub-Division (SH Hiring of Excavator Cum loader along with Tipper for removal of Slips, C/O unlined drain , disposal of muck etc under Chandi Section )Job No-2
C/O PCC R/Wall at Rd 0/350 to 0/415 PCC B/Wall at Rd.0/498 to 0/510 PCC V shape side drain and M/T in Km.0/350 to 0/510
C/O R/wall at Rd 0/020 to 0/030, U-shape drain at Rd 0/050 to 0/100 and P/L Cement concrete pavement at Rd 0/00 to 0/100) (under PDNA Head)
C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Interlocking Paver Blocks, Cement concrete Panel pavement and Tarring work including five year
C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement and Tarring work including five years routine maintenance
Formation cutting, Retaining structure, W-Metal Beam, Crash Barrier, Cross drainages works, Metalling Tarring, Interlocking concrete blocks, V-Shape U-Shape drain, Parapets, Road signages Dumping site etc. Km 36/00 to 51/660) (Under NABARD RID
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Road Sign Board, Paver Block, Plastic cell filled cement concrete pavement and Tarring work including five years maintenance etc
Formation Cutting, C/o Passing Places, Breast Wall, Retaining Wall, Gabion Wall, Missing CD, Road Side Drain, Parapets, Crash Barrier, Road Sign Board, Bio Engineering Works, Cell Filled Cement concrete Pavement, Dumping Site and Tarring work etc.
Providing and replacement of existing old corroded and deteriorated cooling water pump suction pipeline for cooling system of three generating units and replacement of existing deteriorated MIV distributor drain pipe of machine no 3 installed at Bane
R/o damages to various roads under Subathu Sub-Division ( (SH Hiring of Excavator Cum loader along with Tipper for removal of Slips, C/O unlined drain , disposal of muck etc under Subathbu Section)Job No-3
Formation cutting , C/o R/wall, B/wall, CD work, U and V-Shape drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in km. 1/500 to 2/500) Under NABARD RIDF-XXVI
SH R.O.F.D at RD. 0/585 to 0/690 C/o PCC R/wall at various Rds. 0/658 to 0/678, 0/680 to 0/700 and U shape drain at RD. 0/610 to 0/700
C/O balance work of breast wall at Km. 2/739.35 to 2/784.35, Construction of retaining wall at Km. 2/724 to 2/740 and construction of V-shape drain in Km. 2/739.35 to 2/797
Formation cutting, C/o R/wall, B/wall ,CD work,U and V-Shape Drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in Km 1/045 to 1/500 ) UNDER NABARD RIDF- XXVI
Periodic maintenance of Dandi Dodni Road Km 0/0 to 6/0 for the year 2021-22 Providing and laying bituminous concrete and const. of PCC drain 3/0 to 4/0 and 5/0 to 6/0)
Formation cutting, C/o R/wall, B/wall ,CD work, U and V-Shape Drain,Parapets and P/L GSB, WMM and Premix carpet with seal coat in Km. 2/500 to 3/855 ) UNDER NABARD RIDF- XXVI.
ROFD C/O R/wall B/wall CD works soling wearing tarring V-Shape drain Parapets in Km.0/0 to 6/0 and C/O 1 No 15.25 mtr span RCC T-Beam bridge at 2/840
Construction of PCC V-Shape Drain in Various RDs from Km 2/820 to 5/750 and B/Walls at RD 0/575 to 0/590 and R/Walls at Various Rds from 3/690 to 5/195)
Formation cutting , C/o R/wall, B/wall, CD work, U and V-Shape drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in km. 3/855 to 5/640) Under NABARD RIDF-XXVI
SH Metalling Tarring in Km 1/300 to 2/050 C/O 5.00 metre span RCC slab culvert at RD 1/380 with wing wall and C/O V-shape drain in Km 1/300 to 2/050
work 01.03.2025 From 10.30A.M. ROFD 5/7 mtrs. Wide C/o R/wall Gabions wall, CDM/T works, interlocking paver block C.C. pavement drain parapets road Furniture etc. in km. 8/0 to 22/0) Under Nabard RIDF
C/o Passing Places R/walls Missing C.D. works Side Drain CC Pavement B.M. Tarring work road safety easure place of identification sign board Protection work and Maintenance for 5 year after completion Package No. HP-04-403
Formation cutting , C/o R/wall, B/wall, CD work, U and V-Shape drain, Parapets and P/L GSB, WMM and Premix carpet with seal coat in km. 5/640 to 6/615) Under NABARD RIDF-XXVI
Imrovement of road NCAP multi time liner to clear in 102 cities road from Parwanoo Kamli khadeen road in km 0/0 to 6/0SH P/L paver block side drain at Rd 0/0 to 0/525
SH- Formation Cutting, C/O Passing places, R/wall, Missing C.D. work, GSB, WBM-II, WBM-III,Tarring work, CC Pavement, Side Drain , parapetsand road side furniture including routine maintenance for five years after completion of construction work.
Imp. of road, Formation Cutting, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement, Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD
C/O Baayela Bulahoo to Sheola road in Km. 0/00 to 4/500.(SH P/L G-I and C/O Earthen shoulder and unlined drain between Km. 0/00 to 2/00)Under SCDP.3rd Call
ROFD in km 0/200 TO 0/305, P/L cement concrete pavement from RD 0/00 to Km 0/350 V-shape drain at various RD s in between km 0/00 to 0/350). (under PDNA
A/R and M/O to Chandi Ghyan road in Km. 0/00 to 6/00 (SH MT in Km. 3/550 to 4/00 and C/O unlined drain in Km. 3/00 to 4/00)Deposit
C/o B/wall at Rd. 0/567 to 0/605 P/L paver block pavement at km. 0/370 to 0/498, 0/626 to 0/665 V-shape drain at Rd. 0/0 to 0/665