Loading…
Loading…
8,346 results • Best match
Formation cutting for 5/7 mtr wide road , R/walls ,C.D, Granular Sub Base ,WMM,Metalling Tarring , Interlocking Paver Blocks V-Shape Drain , Parapets, Road Singnages Dumping sites in km 0/0 to 2/510 ) Under NABARD RIDF-XXIX)
C/O R/wall /B/walls,P/F Crash Barrier and V-shape drain at various Rds in km 0/00 to 10/900) (Under PDNA-2023) Time Limit Three month Cost of Form Rs. 5000/- Job No.1
FC, RW, CD work, GSB, WBM-II, WBM-III, Tarring work, c.c pavement interlocking paver block, drain, parapet road furniture and construction of 33.40 mtr span Box Girder Bridge over Dharoon Khad RD at RD 0/695 including approaches
Balance work of Thuran Samleta Rishikesh Via Jawah road Km. 0/0 to 6/540 (SH C/o C.D., GSB, WBM G-2 and G-3 work, MT, road side drain and Kilometer stone etc.) (Under NABARD RIDF-XXV)
(SH- Construction of R/wall in PCC 1-5-10 at RD 1/725 to 1/750 and v- shape drain Km. 0/030 to 0/280, 1/660 to 1/705 and 1/720 to 1/765) SCSP
Balance work of four rooms examination hall and play ground at Govt.Sr. Secondary School Amarpur Tehsil Ghumarwin Distt. Bilaspur.H.P.(SH C/o Badminton and Basket ball field and U-shape drain 0/0 to 0/60 and painting etc.)
C/O Breast wall at various RDs , U shape and V shape drain at various RDs , Catch pit and Parapets on Culverts in Kms 131/000 to 145/100 and 0/000 to 13/000 on Shimla Bye pass
Initial Rectification before Periodic Renewal Between Per kilometer 0/00-4/00 )Repair of Pot holes and Side Drain , Periodical Renewal Per kilometer 0/00-4/00 and Post Maintenace After Periodical Renewal Per kilometer 0/00-4/00)
(SH- ROFD, C/O R/wall B/wall C.D. works, P/L Kharanja Stone Soling G-l,G-ll lll MT works PCC drain, Parapet, Dumping Strycture etc. in KM 0/0 to 12/200 under NABARD RIDF-XX)
SH formation cutting, C/o passing places, B/wall, R/wall,Gabion wall, missing CD, road side drain, parapets, road sign board, bio engineering work and tarring work etc. under PMGSY-IV batch I package No. HP-11-194
ROFD, Protection of works, C.D. work GSD, WBM, CMBM, bituminous cold mix, CC pavement, V-shape drain, Parapets, Crash barrier, Road Safety, Km stone, Irrigation crossing and dumping site RD 0/0 to 9/330 (including 5 years maintenance)
ROFD, Metalling and Tarring, Retaining wall, Breast wall, Hume pipe culvert , PCC Drain , Road side parapets, logo board and kilometre stone etc. and five year routine maintenance under PMGSY-II (Batch-I, 2019-20) Package No. HP-08-517.
Formation cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain, parapets, road furniture and 33.40 meter span Prestressed concrete Box Girder Bridge at RD 0/0675 including both sides Approaches and
SH Construction of R wall at Km 181.745 to 181.770 B.wall at 201.710 to 201.820 201.885 to 201.910 and u shape drain at 201.710 to 201.820 and 201.865 to 201.910 respectively and providing subgrade metalling tarring between 174.920 to 174.990
C/O cement concrete road from new culvert towards Sati Mata, Shami house at Haini Ward No. 2 S/H - cement concrete road and V shape side drain from new culvert towards Haini at RD 0/00 to 0/190
(I)P/L 25mm thick B.C.and 2.5 mm thick road marking thermoplastic strip and V-shape drain in km. 22/00 to 23/00,23/00 to 24/00, 24/00 to 25/00 and 25/00 to 26/00). (HP0302MDR105
ROFD at Rd 0/00 to 0/090, V-Shape drain at Rd 0/00 to 0/100 P/L cement concrete pavement at Rd 0/00 to 0/052 C/O B/wall at Rd 0/00 to 0/050)
Formation Cutting, Metalling and tarring, C/O Hume pie culvert, R/wall, P/L GSB, WMM, SDBC, CC pavement, Parapets for essential reaches, Road side drain, CD works and five year routine maintenance in KM 0/0 to 04/650
SH- Const. of Retaining wall in wire crate at RD. 9/756 to 9/771, Breast wall in wire crate at RD. 9/752 to 9/762 and C/O Trapezoidal shape drain at RD. 9/625 to 9/780
C/o link road from Samoh to NIhan via Railly Km. 0/0 to 4/0 (SH- C/o U-Shape drain at RD 2/700 to 2/770 and C/o R/wall at RD 0/710 to 0/722)
Hiring of Excavator cum loader and hiring of Tipper for removal of slips excavation of drain dressing of berms carriage of debris and excavated material from slips from Km131/00 to 145/100 and 0/0 to 13/0 Shimla bypass
R/O Rain damages on various road under Kasauli Sub-Division.(SH Hiring of Excavator cum loader for removal of slips and clearance of road side drain and Hiring of Tipper for shifting of earth and debris)under Sultanpur Section)
SH Metalling/ Tarring work from RD 0/0 to 0/450 and Providing and laying 600mm dia pipe at RD 0/0 and C/o U-Shape drain from 0/0 to 0/030 and 0/135 to 0/235
improvement of road NCAP multi time liner to clear in 102 cities road from Masulkhana to labour shed colony in km 0/0 to 1/900 SH P/L paver block side drain in km 1/0 to 1/900
Providing and laying 30 mm thick bituminous concrete on Sangrah Paller road in km. 10/0 to 12/270 2.270 kms and Pidiyadhar paller road in km. 4/0 to 6/0 2.000 kms including construction of road side drain)
F.C, Passing Places, R/walls, CD works, GSB, WBM G-II, WBM G-III, Tarring work, Interlocking Paver Block, C.C. pavement, Road side drain and Parapets, P/F Road Furniture i/c five years routine maint. in under NABARD RIDF-XXVIII
Cutting of Grass and bushes,provand PPLYING White washing,Clearance chocked drain bnd removal of slips,Maintanance of earthen ahoulder,Hiring of Excavator and Tipper or equivalent for local shifting of labour and for emergency work etc.from km 30/000
C/O 600mm dia Hume pipe culvert at RD 0/410 and V-shape drain with edge wall at RD 0/250 to 0/280, 0/310 to 0/35, 0/360 to 0/410 and 0/142 to 0/417
SH - FC, C/O Passing places, R/wall, C.D. work, GSB, WBM-II, WBM-III,Tarring work, Side Drain , parapets including 50 mtr. span Bridge including routine maintenance for five years after completion of construction work. (UNDER NABARD RIDF-XXIX)
Construction of retaining wall at RD 3/520 to 3/523, 3/545 to 3/550, V-shape drain with E/Wall at RD. 3/525 to 3/560 and P/L CC work in km. 3/545 to 3/595
C/O 900mm dia Hume Pipe Culvert at RD. 0/030, U-shape drain at RD. 0/0 to 0/030 (R/side) Retaining wall at RD. 0/025 to 0/028.50 and 0/031.50 to 0/035 (L/Side).
SH Providing and laying 30mm thick bituminous concrete including profile correction layer, V-shape drain and road marking on Bhawana Maloh road Km 8/0 to 9/0 and Link road to Village Bhanwar in KM 0/0 to 1/0.
Construction of road from Kasba Kotla to Koi Km 0.0 to 2.600 SH. R. Wall In various RDs between KM 00 to 0.930 and pcc drain at RD 00 to 0.300 LHS and 0.600 to 0.850 both sides under Industrial Corridor
Improvement and Metalling Chandi Badhlag road Km. 7/00 to 12/300.(SH Hiring of Excavator cum loader along Tipper for removal of slips/Landslide, Clearance of drain and dressing of berms in Km. 7/00 to 12/300) (2nd call)
Imp of road, Passing Places, R/walls, Missing C.D. work, GSB,WBM-II,WBM-III, Tarring work, CC Pavement Side Drain ,Parapets and road Furniture including routine maintenance for five years after completion of construction work) . (Under NABARD RIDF-X
Improvement and Metalling of Chandi to Badhalag road in Km. 6/00 to 12/300.(SH Repair of damaged portion by P/L GSB, WMM, BM,BC, Interlocking tiles Pavements and C/O V-Shape drain at Various Rds.)2nd call
P/L WBM G-I,G-ll, G-lll, M/T along with road side drain in 1/0 to 2/0,Humpe pipe culvert at RD 1/060, 1/340, 1/620 , 1/915 and 2/065 )Under MMGSY
SH ROFD, Protection of works, Metalling Tarring, V-Shape drain, Parapets, road safety, Kilometer stone, irrigation and dumping site at RD.0/0 to 7/0 (including five year maintenance) under PMGSY-III Batch-I for the year 2023-24
P/L Metalling and Tarring, R/Wall, RCC Hume pipe culverts, 6.00 mtr. span slab culvert, V Shape drain, Parapets, Citizen information board, Logo board, Km. stones in km. 0/0 to 3/500 including five year maintenance ) Package No. HP08302.
SH ROFD, Protection of works, CD works GSB, WBM, CMBM, bituminous cold mix CC pavement, V-shape drain , parapets, crash barrier, road safety, kilometer stone, irrigation, crossing and dumping site at Km.0/0 to 9/500) (including five year maintenance)
Cutting of Grass and bushes,provand PPLYING White washing,Clearance chocked drain bnd removal of slips,Maintanance of earthen ahoulder,Hiring of Excavator and Tipper or equivalent for local shifting of labour and for emergency work etc.from km 15/000
C/O link road from Petrol Pump to Kakarhatti in Km. 0/00 to 1/800.(SH C/O R/Wall, BWall, Edge wall, Interlocking tiles Pavement, Unlined drain, Parapets and Road Signs, Boards etc. at various Rds etc)Under SCDP
P/L 30mm thick bituminous concrete in kms 2/0 to 3/960 I/c paver block, G-III in pot holes and C/O drain at RD 2/700 to 2/800 and 3/335 to 3/445 under PMGSY
SH C.o B.wall at RD 19.770 to 19.795,31.700 to31.715 and construction of RCC slab culvert at Km 32.085 to 32.088 and wing wall at RD 32.070 to 32.085 and 32.088 to 32.100 and u shap drain at Km 32.160 to 32.250
R/R damages to SAKB road in Km. 37/00 to 70/00. (SH Construction of R/Wall, Breast Wall Catchpits, V-shape drain, wire crate and crash barrier at various Rds, Between kms. 37/00 to 55/00). Under PDNA
/O R/wall at various Rds, P/L 900mm dia RCC Hume Pipe Culvert at Rd 0/295, P/L GSB,WMM, Tarring in Km 0/00 to 0/810 V-Shape drain at 0/00 to 0/800) (under MMGSY)
P/L 25mm thick bituminous concrete in kms 0/0 to/20 and G-III with 20mm thick premix carpet in patches and C/O drain at RD 0/600 to 0/700 and RD 1/200 to 1/300.
C/o Road widening on Marottan side at RD 0/045 to 0/120, P/L Metalling and Tarring, P/E Thrie Metal Beam Crash Barrier and U-Shape drain on both side approaches of Bagchhal Bridge) under RIDF-XXVI