Loading…
Loading…
8,346 results • Best match
Hiring of earth cutting/ excavating machine for removal of slips/ debris, dressing of berms, clearing of drain and catch pit etc. for opening of roads during monsoon season in (i) Padhar to Nauhli road (ii) Padhar to Bharwahan road (iii) Urla to Kotr
R/O Rain damages on various road under Parwanoo Sub-Division.(SH Hiring of Excavator cum loader for removal of slips and clearance of road side drain and Hiring of Tipper for shifting of earth and debris)under Masoolkhana Section)2nd call
Hiring of earth cutting/ excavating machine for removal of slips/ debris, dressing of berms, clearing of drain and catch pit etc. for opening of roads during monsoon season in (i) Drang to Basahi road (ii) Singari Babli Chhari road (iii) Dhwapa to Sa
Formation cutting, Passing places, Retaining wall, CD work, Granular Sub Base, WBM-II, WBM-III, Tarring work, Side Drain and Parapets KM. 0/0 TO 0/930, 4/915 TO 6/105, 6/150 TO 8/450 AND 10/0 TO 11/270
SH- Providing and Laying WBM grade-I,II and Metalling and Tarring in km 0/00 to 2/200, Construction of RCC Hume Pipe Culverts at various Rds and Construction of Road Side V-Shape drain in km 0/00 to 2/200
Construction of Retaining Wall at RD 50/700 to 50/720, Construction of U-Shape Drain at RD 41/740 to 41/780, 51/570 to 51/670 and Providing and laying Wire Crate Work at RD 50/075 to 50/090)
Sub Head- Construction of P.C.C Edge wall at RD 13/700 , P.C.C Retaining wall at RD 13/693 to 13/698 13/702 to 13/707 and U-shape Drain at RD 13/658 to 13/698 13/702 to 13/722
R/R damages on Bill to Haripur road in kms 0/00 to 14/735 ( SH Hiring of JCB/ loader cum excavator for removal of slips and clearance of drain, berms dressing and hiring of Tipper for shifting of earth etc.) Under PDNA
SH ROFD, Protection of works, CD works Metalling Tarring, V-Shape drain, Parapets, road safety, Kilometer stone, irrigation crossing and dumping site at RD.0/0 to 5/440 (including five year maintenance) under PMGSY-III Batch-1 for the year 2023-24
R.O.F.D. between km 0/0 to 2/0 to CD work in RDs 1/010, 1/140, 1/260 1/450, Side drain between km 0/0 to 1/700 and G-I in km 0/0 to 2/00) (Under SCSP)
Providing and laying BUSG, Bituminous concrete in Km 0-0 to 2-0 5-0 to 6-0 and 7-0 to 9-0 Providing and laying hot applied thermoplastic edge line and construction of PCC hill side drain in 500 metre length
Annual maintenance plan for the year 2022-2023 on Mohal Soh road to PWD workshop Km. 0/0 to 3/660 SH Providing and laying bituminous concrete in Km. 1/0 to 3/660 and C/O PCC drain Road Number HP0602VR1022202.
(SH- Providing and laying metalling and tarring, ROFD, retaining and breast wall with wire crates, vented causeway, U a V shape drain, sign board and kilometre stone in km. 0/0 to 5/055). (including five year routine maintenance) (Under NABARD RIDF-X
P/L 25mm thick bituminous concrete in kms 0/0 to 1/0 and G-III with 20mm thick premix carpet in patches and U-shape drain in kms 0/400 to 0/450 L/S, 0/500 to 0/550 R/S
C/O hume pipe culvert at RD 1/550 to 1/750, wearing G-II at RD 1/500 to 1/800, wearing G-III at RD 1/200 to 1/800 and U/Shape drain at RD 1/500 to 1/800
F/C, C/o R/wall CD work, P/L Gramular Sub base, WBM-II, WBM-III, Tarring, Cement concrete pavement, road side drain, Parapets and providing and fixing Sign boards etc i/c maintenance for five year after completer of construction work.)
C/o Slab culvert at RD 1/320 and Hume Pipe Culvert at RD 0/030, 0/320 road side drain at RD 0/00 to 0/120 B/wall and repair of Burms at RD 0/00 to 0/120 PDNA 2023
SH Providing and laying Metalling/ Tarring in Km 0/300 to 0/500 C/O Retaining wall at RD 0/315 to 0/320 0/370 to 0/390 LHS and C/O V Shape drain at RD 0/300 to 0/375
Construction of 5/7 Metre wide F/C including R/walls, passing places, CD works, providing and laying GSB, WBM-II and III, Tarring work, Side Drain and parapets from Km. 0/0 to 2/945 including five years maintenance period after completion
P/L GSB,WMM, Bitumen concrete in Km 13/700 to 16/695 and C/O R/wall , V-Shape drain at various Rds and ROFD in Km 15/00 to 15/795 ) (under Demand No 10 5054-307-02) (OTMNP Headf
Providing and laying 25mm thick Bitumen Concrete including 90 m road side drain in km 0/0 to 0/915, C/O PCC Retaining wall in km 0/805 to 0/822 and Breast wall in km 0/795 to 0/810)
SH ROFD, C.O PCC R.wall and B.wall in wire crate, C.O PCC V.shape drain, C.O Hume pipe culverts, C.O PCC Parapets, P.L GSB, G.II, G.III, M.T works and five year maintenance for five after completion in Km. 0.000 to 3.450) under NABARD RIDF.XXVIII
P/L Soling, CC pavement work at RD 0/150 to 0/270, E/wall at RD 0/175 to 0/199, U-shape drain at RD 0/150 to 0/175 and Khul crossing at RD 0/195, 0/205) under MMGSY
Providing and laying WBM Gr. III, Tarring work with 25mm thick Bitumenious concrete in km. 0/0 to 2/500, Construction of R/walls, B/walls at various RDs and V shape drain at RDs 0/300 to 1/800) Under PDNA
Removal of Land slide in between km. 0/0 to 0/090, construction of RCC Hume Pipe Culvert at RD. 0/060, Wire Crate work at RD. 0/062 to 0/090 and U-Shape drain at RD 0/0 to 0/060)
P/L M/T, CD works, ROFD, R/wall, B/wall, V-shape drain, essential parapets, citizen information board, logo board, Km. stone, 200mtr. stone and routine maintenance of five years in Km. 0/0 to 6/0) Package No.HP-08-463.
P/L M/T, CD works, ROFD, R/wall, B/wall, V-shape drain, essential parapets, citizen information board, logo board, Km. stone, 200mtr. stone and routine maintenance of five years in Km. 0/0 to 12/0) Package No. HP-08-459.
SH Construction of R wall at Km 206.140 to 206.162 206.210 to 206.234 201.800 to 201.855 B.wall at Km 205.880 to 206.00 201.865 to 201.885 u shape drain cutting on hill side at RDs 205.880 to 206.00 respectively and providing subgrade metalling
Providing and laying 25mm thick Bitumen Concrete including 90 m road side drain in km 0/0 to 0/915, C/O PCC Retaining wall in km 0/805 to 0/822 and Breast wall in km 0/795 to 0/810)
SH i Providing and laying 30mm BC extension of culvert and V-shape drain under AMP in Km 2/690 to 9/0 ii Widening and Providing and laying GSB WMM BM and BC in extended portion Km 5/500 to 7/405
Providing and laying 30 mm thick bituminous concrete on Charna Bhawai Sangrah road in km. 2/0 to 5/00 3.000 kms and Dalyanoo Gatta Mandwatch road in km. 9/0 to 12/0 3.000 kms including construction of road side drain
SH Poviding and Laying WBM grade-I,II and Metalling andTarring in km 0/00 to 2/200, Construction of RCC Hume Pipe Culverts at various Rds and Construction of Road Side V-Shape drain in km 0/00 to 2/200
P/L 30 mm thick Bituminous Concrete, Thermoplastic Road marking and C/o Essential PCC Road Side Drain on Jhamiria Rama Dhaun Road in Km 9/0 to 13/0 and Burma Papdi Palio Road in Km 0/400 to 2/0
(SH- C/o 5/7 mtrs. wide road including retaining structure in 0/460 to 1/470, wire crates, C/o U-shape drain in essential reaches and construction of 900 mm dia HPC at RD. 0/615 and 0/855) under MNP.
C/O Cement concrete pavement at various RD,s 0/331 to 0/377.40, 1/260 to 1/267 and U-shape drain at RD 0/281 to 0/331 and R/Wall at RD 1/267 to 1/297 in RHS
P/L metaling and tarring works bw km at RD. 0/0 to 1/0 and C/O U-shape drain across the road at RD 0/0 left end to right end 35m in length with 15m toping with steel grating
Construction of PCC U-shape drain on road side of the building, laying of RCC, home pipe of 600mm dia to cross the building rain water, portions wall on attic floor for pantry of re creational room providing and laying thermal insulation using
SH Construction of 5/7 metre wide road formation cutting 900mm dia RCC Hume Pipe Culvert, cement concrete pavement construction of V-Shape drain providing and laying parapets metaling tarring sign board and km stone in km 0/0 to 1/300
C/O 1.00 mtr span R.C.C. Slab Culvert at RD 0/340 and C/O Embankment subgrade, P/L GSB, G-II and C.C. Pavement in different RDs and C/O U-Shape Drain and E/wall in various RDs (P.D.N.A-2023)
Const of 900 mm dia hume pipe culvert at Rd 3/225 alongwith wing wall at rd 1/795 to 1/800 CC pavement , PCC drain P/L G-III and bitumen macadam bituminous concrete in Km 0/0 to 3/720