Loading…
Loading…
8,319 results • Best match
Restoration of rain damages on Chharour Nallah to Barogi road Km 0/00 to 7/850 (SH- Construction of Retaining wall with PCC Toe wall at RD 1/145 to 1/155 and 1/530 to 1/540
Restoration of rain damages on Chharour Nallah to Barogi road Km 0/00 to 7/850 (SH- Construction of Retaining wall with PCC Toe wall at RD 3/530 to 3/580 and 4/985 to 5/00).
Source level augmentation of various water supply scheme under IPH section Geherwin from Kaherwin Nallah Satluj River in Tehsil Jhandutta Distt Bilaspur HP SH Designing Providing, fixing and commissioning of TUBE SETTELERS for PEC Media in PST SST
C/o Link road Karluhi Athwan Km. 0/0 to 4/600 (SH. C/o RCC slab culvert on Nallah RHS along the road at RD 2/030 and R/wall culvert approach on road Harizan Basti Athwan.
Construction of link road from Village Ghuggar to Ravinder Sood House Nallah Har Ravidas Mandir Ghogra Colony (SW - P/L Interlocking concrete Block Pavement from RD 0/00 to 0/050 and 0/214 to 0/394 (Deposit)
Estimate for the diversion of Thirot nallah into conveyance channel of Thirot HEP from trench by removal of silt aggregate ,pebbles boulder from it and construction of bypass arrangement by excavation/removal of silt ,aggregate ,boulder ,pebbles a
Restoration of rain damages to LWSS Dhar Ke Ber in Tehsil kasaulii District Solan H P Sub Head Construction of wire crate along the nallah khad to protect bed Pump house from RD 0 to 30 Top step
RM of LWSS Ghiyal Area Kangi Nallah in GP Kairi and Panog Tehsil Kotkhai Distt Shimla HP SH Repair of WKFI 40/10 KSB Pump set No 2 Sr No 9974155765/100/01 2nd stage and various items
REPAIR/ MAINT OF RETAINING WALL, FENCING, PCC/ RR MASONRY, BRICKS DRAIN, DRAIN COVER ETC AT JUTOGH, SHIMLA, KUFRI AND SANJAULI UNDER GE (I) JUTOGH
Balance work of U-Shape drain near Dhobi Ghat Maranda on Maranda to Khalet (SW- C/o U-shape drain alongwith grating (MC Deposit)
Restoration of Path Drain in W 07 HBC MC Hamirpur HP
REPAIR TO DRAIN AND OTHER ALLIED WORK AT MIL STN DHARAMSHALA
C/O Gargon to Ganyana Nali via Dagother road Km 0/0 to 5/0 (SH C/o 900 mm dia RCC Hume Pipe Culvert alongwith wing wall at RD 0/370, 0/630,0/900, 1/420 and soling (G.I) in Km 0/00 to 1/00 and C/O unlined drain between RD 0/00 to 2/500) SCSP
(SH-C/O R/wall at RD 0/800 to 0/830)
Improvement of Curve at RD. 18/480 to 18/610, Extension of 900 mm dia HPCD, C.C Pavement, Construction of R/Wall and U-shape Drain in between RD. 18/480 to 18/630
Tender Providing and fixing Prepainted Steel Sheets Roofing and Rennovation of Type-II Qtrs (2 Sets) at Saigloo under ESD HPSEBL Saigloo. Ch to providing SOP to LWSS Roda Nalla Satahan in G.P Lagdhar under ESD Saigaloo(TS No 4/2020-21(S-50/2024-25)
RRD on various roads under Mandi Sub Division no-IV HP PWD Mandi) Majhwar Section (SH- Hiring of J.C.B for removal of slips clearing of debris drains dressing of berms etc.)
Upgradation of Sichling Manne Yogma road Km. 0.000 to 6.035 SH Improvement C.O. passing places Missing CDs side drains parapets CC pavement interlocking paver blocks and tarring work Under PMGSYIII HP0709
Construction of cement concrete road at I.A Nagri, Distt. Kangra (from end point of metteled portion to newly carved plots of Ph-II). (SH- C/o road, drains and RCC culverts).
RRD on various roads of Satahan and Bhargaon Section under Kotli Sub Division HPPWD Kotli. (SH- Hiring of JCB for removal of slips, clearing of debris, drains, dressing of berms etc).
Restoration of rain damages on various roads under Sub-Division No. IV HPPWD Mandi (SH Hiring of JCB for removal of slips, clearing of debris, drains and dressing of berms, etc.)
Minor repair work in HPSEBL office complex/residential colony complex, repair of aluminum door and removing of slips from drains, concrete work etc for SVP Bhaba Residential complex Under CMD Bhabanagar
Carrying out the job of cutting of grass, bushes surrounding colony and non-residential building, road area, cleaning of drains etc Ganvi/Jeori/Dett Jeori/Kotla etc wef 01.10.2026 to 31.03.2027
Custom Bid for Services - Cleaning Sweeping Collecting rubbish and its disposal cleaning drains removing blockage in sewer lines cleaning of water storage tanks etc in Railway Colony Shimla for 2 years()
SPL REPAIR REPLACEMENT OF LT OH LINE CONVERTED TO UG CABLE AND PROVN OF DRAINAGE LINE WITH RETAINING WALL ALONGSIDE CONNECTING RAMP AT PALAMPUR MIL STN
Special repair to non residential old building DDUZH Shimla. (SH-change of damaged and settled and rain water drainage system line back side of Oxygen plant).
Provision of pavers and underground drainage to the street from Vigilance office towards h/o Retd. Principal Jatinder Puri Baag Mata colony W.no. 9 MC Una.
M/R to D/Pool building under H.M. Section, Shimla dg. 2025-26. SH Repair & construction of retaining wall, provision of drainage system at Norwood, Shimla.
Protection wall towards Nallah side of building) Deposit work
Formation Cutting, Passing Places, retaining walls, Cross Drainage Works, Side Drains and Parapets Etc) Package No HP-02-320. under PMGSY (World bank RRP-II, Batch-I, for the year 2018-19
Formation cutting, passing places, Cross Drainage works, side drains, Parapets, and Mettaling and Tarring) Under PMGSY (World Bank-RRP-II) (Batch II for the year 2018-2019) Package No. HP-02-355
Purchase of Denka Mortar and Denka Natmic AF-S for use at TBM site at Parbati HE Project Stage-II (Package No. PROC-1809)
Purchase of Minova Rappas Mortar and Supply of LOVA REED Pump on hire basis for use at TBM site at Parbati HE Project Stage-II (Package No. PROC-1810)
Hiring of earth cutting/ excavating machine for removal of slips/ dressing of berms, clearance of side drains etc. (i) Pakhari Galu road (ii) Tandoo Sub Centre to Palyar Nallah road (iii) Drang Seri Dhar Soyala road and others road etc.).
on Dayol Lassani road at RD 0/394 under Regular PMGSY
(SH- F/C, Missing cross drainage works. Metalling Tarring, side drain, Parapets and road sign boards including five years maintenance).
SH Construction of Passing places,Side Drain, Parapets, Cross drainage, Metalling and Tarring Work etcetra including five year routine maintenance.
SH F/C C/O Passing places, side drain, Parapets,Cross Drainage, CC Pavement, M/T Package No.HP-06-194.
M/T and C.D works on Sarol Bazar i/c drain (SH Construction of PCC road side drain in Km. 0/450 to 0/745)
Restoration of drain, retaining wall and channelizing the drain to cater the storm water at Chamera-II Power Station, Chamba, (H.P.) (Pkg. No. C-859)
M/T and CD work on Sarol Bazar i/c Drain (SH Construction of PCC Road side Drain in Km. 1/475 to 1/775)
Auto Drain Valve. Make: Faiveley Transport Rail Technologies India Private Limited. Part No. 010001200 offer and acceptance :AUTO DRAIN VALVE to FTRTIPL Part no 010001200
Removal of slips/debris and boulders from the Wangtoo-Bhaba Power House Road due to heavy rain or flood in pagal nallah during summer and winter season for year 2023-24 w.e.f 15/8/2023 to 31/3/2024
C/o Secondary WHS Community Water Storage Tank at Koidhar Village Bethwa i/c feeding pipes and C/O Primary WHS/Diversion Structure at Sharakali Nallah GP Gattu under APO Thunag DPO IDP Mandi during the year 2025-26
RR Damages on Jagothi Nallah Andhrewthi Road km RD 000 to 700 SH CO RWall at RD 3400 to 3412 RWall RD 3680 to3705 BWall 4700 to 4715 RWall at RD 5200 to 5215 RWall at RD 4810 to4820
Providing Sewerage Scheme to Dalhousie Town in Tehsil Dalhousie Distt. Chamba (HP) (SH- C/O Steel Struss bridge 20 mtrs. Span at backside of Bharera Village and 25mtr span at Sadar Bazzar Nallah i/c Abutment for steel bridge)
Construction of 2 Nos. Box cell culvert on NH-154A (i) Box cell alongwith approaches at Rungdi Nallah at Km 131/770, Rain shelter at Km 131/783 and (ii) Box cell along with approaches at Km 138/200
Construction of Govt ITI Bani Tehsil Barsar Distt Hamirpur HP SH Development of ground ie channelization of nallah paver work and construction of 2Nos toilets and 01No septic tank for 50 users including soak pit and WS SI work
Construction of Nallah from Nalagarh Road transformer to BPL Colony RD 0 040 to 0 120 (SH Construction of RCC Slab Steps Construction of Retaining wall B wall Rd 0 0 to 0 120) in ward No 6 Totu
Annual Maintenance Plan for the year 2022-23 On link road Mahalu Nallah to Chowki Bazar Km 0/0 to 1/00 SH Providing and Laying 20mm thick premix carpet in Km 0/00 1/00 Road Number HP0205VR005307302