Job 3 Restoration of rain damaged on link road to Rakkar to Basoli km. 0-0 to 2-450 Sub Head P.L GSB, WMM, 50mm Bituminous, Macadam, 30mm thick BC and C.O Retaining wall and Drains in RD. 0-150 to 0-405
Providing JCB and Tipper (Having capacity 4 ton) and Tractor trolly including POL/ driver etc for the purpose of removal of slips / opening of choked drains along the road , on hourly basis upto all leads and lifts in various roads in newly added
Improvement of drains in BBN area (Sub Head - Sikka chowk to Unichem chowk and up to Bouni Bhatoli road in Baddi area and Govt. Degree College Nalagarh to Akash Hospital and up to New Nalagarh and Kashmir pur to Joghon in Nalagarh area )
Providing JCB and Tractor Trolly (having capacity 0.33 cum) including POL/ driver etc for the purpose of removal of slips / opening of choked drains along the road, on hourly basis upto all leads and lifts in various roads.in Baddi to Kalujhanda are
Custom Bid for Services - Custom Bid for Services Carrying out the topographical land survey of 20 Acres land with a total Electronic Station of high precision making the position of physical features such as bldg HTLT lines drains trees road etc Pr..
Custom Bid for Services - Carrying out the topographical land survey of 17 Acres land with a total Electronic Station of high precision making the position of physical features such as bldg HTLT lines drains trees road etc Preparing contour plan at 0..
ZONE A Door to Door Collection of garbage in segregated form ie Wet and Dry from ward No 1 2 3 sweeping cleaning, sweeping of roads, removal of silt from drains, picking of garbage from roadside in segregated form ie Wet and Dry
ZONE A Door to Door Collection of garbage in segregated form ie Wet and Dry from ward No 1 2 3 (sweeping cleaning, sweeping of roads, removal of silt from drains, picking of garbage from roadside in segregated form i.e. Wet and Dry)
sweeping/ cleaning work of the various areas/floors of Larji Power House such as Main access tunnel floor, GIS floor, service bay floor, machine hall floor, generator transformer floor, turbine floor, MIV floor etc. i/c all the toilets, drains and st
Provision of M.S. railings on valley side of road and repair of existing side drains on internal road of IIAS from Boileauganj gate to Gorkha gate 2. SH: Provision of railing from Gorkha gate to 28 family line and related miscellaneous works.
M/R to GPRA, Bemloe, park area & Chotta Shimla dg. 2022-23. SH:- Cleaning of water storage tanks, repair of damaged tanks and desilting of choked drains and sewerlines and disposal of malba at GPRA Colonies Bemlloe, Chotta Shimla and Park area.
Provision of M.S. railing on valley side of road and repair of existing side drains on internal road of IIAS from Boileauganj gate to Gorkha gate 2. SH: Provision of railing from Boileauganj gate to 28 family line and related miscellaneous works.
Renovation of RCC tanks in GP Patta Nali
Construction of DLT work in GP Patta Nali
Construction of RCC Tanks in GP Patta Nali
Formation cutting, Passing places, R/walls, Cross Drainage, Providing and laying GSB, P/L WBM-II, WBM-III, Tarring work, Side drain, Parapets and road furniture) (Under NABARD-RIDFXXV)
ROFD protection works ,Cross drainage works ,Mettalling and tarring ,Road side drain ,parapets ,Crash barriers, Road safety km stone nd dumping site etc. under PMGSY Phase-III, Batch-II
Restoration of damaged concrete road by providing paver block from gate no 1 to gate no 2 of workshop, BSL main store road including drainage, one no Toilet and boundary of Electrical workshop Division BBMB Sundernagar
Renovation and upgradation of toilets of health centre including external sewerage drainage system and connectiong the sewerage line to MC sewer line including providing connectivity Gandhi Bhawan and student centre building in HP University shimla 5
Construction of PCC B-wall at RD-0-250 to 0-276 and 1-110 to 1-128
Construction of Protection wall at RD -1/618.50 to 1-631
Repair of pot holes and patches at RD 5/00 to 6/00
Construction of PCC Toe wall and Wire Crated R wall at RD 1-657 to 1-672 under PDNA
C/O PCC R/Wall at Rd 2/700 to 2/730 and 5/440 to 5/460
Hiring of Tipper for carriage of muck of slips
Repair of pot holes and patches at RD 2/800 to 4/355
Repair of pot holes and patches at RD 0/00 to 2/800
Formation Cutting at RD 1-620 to 1-670
Construction of Protection wall at RD -1/606 to 1/618.50
Construction of PCC Toe wall and R wall at RD 1-345 to 1-359 under PDNA
Construction of PCC Toe wall and Wire Crated Breast wall at RD 1-480 to 1-550 under PDNA
Removal of formation Deficiency at RD-1/390 to 1/585)
Repair of pot holes and patches at various RDs
(SH-G-lll at RD 4/0 to 5/400)
C/O retaining wall at RD 5/210 to 5/227.50) (DC Deposit)
Construction of Wire rates dumping site at RD 01-806 to 01-850
Construction of PCC Retaing wll at RD0-076.90 to 0-079.90
Repair of pot holes and patches at RD 4/355 to 5/00
C/O RCC Hume pipe culvert at km.RD 0/600 including both side wing walls.
Construction of PCC Retaining wall at RD-1-925 to 1-945 and Construction of Wire Crated dumping site at RD-1-772 to 1-804
C/O C.D work, slab culvert and C/O dumping structure in wire crate
C/O R/wall at RD 1/990 to 2/004 and 4/750 to 4/760) ( Under OFC
C/o U shape drain fro Arya Samaj bhawan to Bimla bridge (ward no. 07) 0/0 to 0/144. (SH - P/L grating over drain from 0/0 to 0/55)
C/o Street and RCC pipe drain from house of Master Sarwan to house of Devi Dayal length 1Km.(RD 0/00 to 1/00) (SH RCC pipe drain and 80 mm thick interlocking block pavers) G.P. Lehi.
C/o drain and pipe crossing in front of Microtek New technologies pvt. ltd and Naina industries, Ind. area katha Baddi. C/o drain and pipe crossing near Petrol pump on road from annapurna hotel to Morpen road.
A R M O LWSS Gumma SH C O Damaged Drain Channel at New Head Weir for tapping additional water in to old Gumma Raw Water Source and Removal of Debris slips silt etc from existing Drain Channel
(SH- Construction of 5/7 meters wide road, providing cross drainage works, granular sub base, WBM, premix carpet surfacing including seal coat, C/o essential parapets, U shape side drains and sign board etc. in km. 0/0 to 2/685) including five year r
Providing and laying metalling and tarring, Cross drainage works, C/o retaining walls, Breast wall, V-shape drains, essential parapets and providing road sign board, Km. stones and 200mtr. Stone and routine maintenance of 5 years in Km. 0/0 to 5/0 P
AR MO of residential complex for DGMS colony at Sitarampur during 2022-23 including the repairing of drainage system and roof treatment of G type quarters SH providing paver tiles around B 7 Bungalow and other misc works Subwork/Packages: AR MO of ... of drainage system ...
Proper drainage surface, plastering and white washing.