Loading…
Loading…
8,323 results • Best match
SH Formation Cutting Retaining Structures Cross drainage Paver blocks VShape Side drain Road Side drain Road Side essential Parapets Road Signages and Dumping Sites in Km 0/0 to 5/205 under NABARD RIDF XXXI i/c 5 years maintenance
F/C, Passing Places, R/walls, B/wall, CD works, P/L GSB, WBM-II, WBM-III, Tarring, C.C. pavement, Road side drain, Parapets,Road Furniture C/O 19.75mtr.span RCC T-Beam Bridge i.c both side under NABARD RIDF-XXVIII
Sub Head -P/L cement concrete work, steel grill work to various paths, drains and R/walls in lieu of repair works of drain and grill work near Gabha house, path and drain at Balmiki colony near Vicky house etc. and other emergent repair works
Hiring of sanitation worker for cleaning of streets drains etc.
Removal of slips, dressing of berms clearance of drains etc.)
(GSB WBM 20mm thick premix carpet and seal coat) Cement Concrete pavement, U and V Shape drain, Road side Furniture, parapets including five year maintenance) under NABARD RIDF XXIX)
(SH C/O wire crate wall with apron on Pandoga Nallah from RD 1000/0 to 180 on left Bank and From RD 1000/0 to 380 on Right Bank , On Nallah-1 from RD 350/0 to 200 on left bank 350/0 to 200 on right bank on Nallah-2 from RD 180/0 to 300 on etc
Improvement of drain from h/o Ujjagar Singh to Bola well ward no. 1 MC Una.
R/O Link Road and side drain from Civil Hospital W.No.01 NP Nadaun P- 2
REPAIR/MAINT OF HARDSTANDING, DRAIN AND OTHER MISC B/R ITEMS AT SUBATHU UNDER GE KASAULI
C/o covered drain on road from Lakkar Depot to Jharmajri Bus stand via Alembic Chowk.
REPAIR REPLACEMENT TO RETAINING WALL COMPOUND WALL PATH DRAIN AND OTHER WORKS AT MAP ACCN DALHOUSIE
Repairing and Covering of Drain with grating sunny side near Kumar house in ward no 12.
Const. of U shape drain Sham lal house to Boundary line at Damrog ward No.11.
Repair, Replacement to retaining wall, path, drain and other works at Gemini under AGE(I) Dalhousie
Repair of path, Drain Railing steps upto 80 m in different parts of ward no 9.
Construction of cover the drain with half round iron angles at ward No 07 Nagrota Bagwan
Restoration of rain damaged drain and culvert near Suman House Comely Bank in ward No 4
Repair and maint. of road drain from Mamgain house to Harbajan Mehta house Ward No 11
Repair and maint. of steps and drain Y.R. Sharma to main road in Ward No.3
C/o steps and drain near the H/O Bidhi Chand at Mcleodganj Ward No.3
C/o Drain from h/o Sh. Madan Lal Shamber towards G.P.S.Dehra in ward no. 6
Improvement of drain from Geeta Mandir street and towards Jawahar Singh Danga w.no. 7 MC Una.
C/O Road and Drain near NH to Sunil Kumar House Majehatel I Ward No. 6
P/F of interlocking paver block and Drain from Patial house in W. no. 10.Maranda
Construction of underground drain/road from dhakrumajra Gaushala to Peepal tree with 80mm ISI Mark tiles.
C O V shape drain from Himuda Gate Vikasnagar to C 30 Block ward No 29
Recarpeting of road and drain from NH-105 to S.C. Basti Gulabpura bye pass. G.P. Panjhera.
R/O Link Road and side drain from Civil Hospital W.No.01 NP Nadaun P- 1
R M of drain from HP Sectt to Flowerdale via Chunar Bhawan in ward No17 Benmore
C/o drain and protection work/crate work on road from Vardhman Chowk to Annapurna Chowk.
C/o path and drain near Tulsi Ram house in ward no 10 Maranda Mc palampur
IM of road and drain from Sh Kishori Plot to Sh Vijay Kumar house WN9 NPBP
Construction of path and drain near railway track to Yograj house in Ward no 13 Solan
REPAIR OF RETAINING WALL, DRAIN, PATH AT TICCA AND GEMINI AREA UNDER AGE(I) DALHOUSIE CANTT
REPAIR/ REPLACEMENT OF RETAINING WALL, DRAIN AND PATHWAYS AT BAKLOH CANTT UNDER AGE(I) DALHOUSIE CANTT
Repair and maintenance of drain Baba Balak nath road to Shashi Pal in Ward No.1.
Construction of retaining wall and drain on back side of ITI building Hamirpur Distt. Hamirpur (HP).
Providing and laying interlocking concrete block and U-shape drain)
Providing and laying interlocking concrete block and U-shape drain)
C/o 6.00 metre span RCC slab culvert over Rana Kyar nallah at R.D.75/300
C/O Causeway over Juh Nallah on Pantehar School to Kunjeswar Mahadev Temple road. (Under SCSP)
(SH Crossing for gravity main over Allain Nallah near Mahuage) (under PDNA at Sr. No. 2793)
Laying, jointing, testing and carriage of GI pipe 80mm dia and CO Intake Chamber Nallah Source
C/O Intake Chamber with filter Unit at Churu Nallah source) DC Deposit SDF/2025/155
SH Construction of RCC 4.50 mtrs span slab culvert at entry and Exit point over Nallah
SH-Extension of 3.00 mtr slab culvert along with channelization of nallah at km 1/150
SH Laying jointing testing of GI pipes 40 mm dia from Nalgi Nallah to village Galchet
Formation cutting 5/7 mtr wide road at Km 0/00 to 0/210, C/O 2.00 mtr span culvert at Km 0/140 , R/wall at Rd 0/070 to 0/130, B/wall at Rd 0/145 to 0/160 , U-Shape drain at Rd 0/080 to 0/250, P/L cement concrete pavement from Km 0/00 to 0/500 C/O w
AR and MO of Social Housing Colony at Una, Phase I to IV District Una HP Sub Head Cleaning of Dust bins by Mechinical Transportation, External water Supply Scheme, External Sewerage System, Cleaning of Roads, Drains, paths, Parks and Repair of street