Loading…
Loading…
8,625 results • Best match
Repairing of drain for miners qtr. M 1 to M 16 at BOCM Colony under CHP CPP Piparwar Area.
Repair of boundary wall, cable trench and drain at Sub-Station building at Quarry No.02 under Purnadih Project.
Provision of partition wall in the front of store room and repair of drain under Purnadih Project, NK Area.
Construction of RCC main drain from entrance of rehab site to Yagyasthal at Lohandia rehab site.(L-195 m).
AMC for Cleaning of garbage, drain, dustbin and Sweeping at Market place near staff colony under GM unit, Kathara
Cleaning of kutcha drain along Transporting Road down portion of W.B. No. 01 under under Rohini Project, NK Area.
Provision of garland drain, repair of culvert and allied works under Monsoon preparation under Gidi-A colliery, Argada Area
Cleaning of drain and jungle cutting at Jawahar Nagar colony and Ropeway colony under Kusunda Area for 6 months
Repairing of drain of ETP support wall of tilted boundary wall and flooring of compressor room at Sawang Washery
construction of RCC drain with cover from Md. Shahabudin house to Dilip Kujur House W.No. 10, Nagar Parishad, Chaibasa
Extension of main drain from culvert to outlet near Konar River of River side (Shastrinagar colony) under Jarangdih Colliery
Upkeeping and Maintenance of floor of different shops road sweeping drain cleaning etc Inside CRS complex of CRS Barkakana
Repairing and cleaning of main drain near DH and B-Type DS Block at Babu Colony under Jarangdih Colliery
Cleaning of drain and removing of conservancy garbage Chapapur Colliery and Badjna Colliery colony under CBH Group (One Time).
Construction of RCC Drain with slab from Dr. Arun Kumar House to south side corner in ward no 10
Platform making drain maintenance and pipe laying for installation of R.O water machine at different locations under Lodna Area
Construction of RCC Drain From House of Chunnu Ji to opposite of Shankar Ji Ward No. 12 under AMC
Making slabs including cleaning main drain from plot no.417 to 424 of Lohandia rehab site under Rajmahal Area.
Construction of RCC Drain at Ghat Road from Main Road to House of Somra Khadia under Ward No- 46
Construction of Boundary Wall, Drain and PCC Road At Bhendra Black Smith Workshop G.P-Bhendra Block- Nawadih, Distt -Bokaro
Cutting of katcha drain both side along transporting road from RPL crusher to no. weigh bridge under Ashok Project.
Repairing of drain of NHS D/S and front of D1 to D7 at Urjanagar colony under Rajmahal Area.
Extension of RCC wall along Garland drain near junction of DMZ for protection of toe from erosion under ROCP.
Providing drain at KB Gate Colony for efficient disposal of waste water discharge under Kuju Colliery of Kuju Area.
Construction of RCC Drain From Biraj Hotel Via Shivkumar Saha House to Rakhi Gupta House at Ward No- 16.
Repairing of Floor and Drain of Fan House at 23/8 Incline of Bhowra (N) Colliery under E.J. Area.
Cleaning and Repairing of Monsoon drain of South Side of Hired HEMM patch of ABG Colliery under Govindpur Area
Repair of 2nd floor toilet drain cover provision of steel windows and misce civil works at TE Building Ranchi
Repairing of drain and casting RCC slab (0.3 mtr. Thick 03 nos.) over it near VTC building under ROCP.
Bush cutting and drain cleaning along colony premises at Jharkhand colony and Shimla colony under CCD (for one year).
Repair of garden wall, outside block drain and outside toilet at G.M. Bunglow at Gopalpura Township under Mugma Area.
Sludge cleaning and repairing the drain from Qt No MQ231 to MQ-262 colony No 3 under Kathara Colliery
Cleaning and Repairing of back and front side drain of Staff Colony at Parsiabad of Bhowra under E.J. Area.
Katcha drain cutting along haul road near RPL crusher to weigh bridge no.07 and 08 under Ashok Project.
Repairing and maintenance of floor, drain and misc. work at front portico of Sijua area Office under Sijua Area
Repair and maintenance of damaged drain behind M. Qtrs(D/S) at New shastri Nagar colony under Jarangdih colliery.
Repairing of drain with cover slab, roof grading and flooring work in the premises of sub-station under ROCP.
Providing drain with RCC culvert near shopping center, boundary wall at Sarubera Colony under Sarubera Colliery of Kuju Area.
Provision of Garland drain, laying of hume pipe and other allied works under monsoon preparation of Religara, Argada Area.
Construction of RCC drain from House of BabluLohar to House of Sushil Murmu in Ward No. 12 under AMC
Repair and maintenance of drain damaged part bolck no 334 to 405 six block nichitpur township under Sijua area
Cutting of diversion garland earthen drain with dismantling of RCC retaining wall at around new proposed silo at ROCP.
Making Drain in front side of B-type SISF colony, Dakra under Gm Unit of A-C Area, CCL.
Cleaning of mud and slurry near police thickener and drain cleaning in front of main building at Kathara Washery
Cleaning of raod side flank and drain etc. for monsoon period in different places in mines area under ROCP.
Repair of drain along 1028 conveyor belt near reclaimer of wash coal stock yard under CHP CPP Piparwar Area.
Cleaning of drain and ash at Kuya colliery near office colony and near Durga Mandir colony under Bastacolla Area
Repairing of drain from qtr no. MQ 01 to MQ 24 at 172 colony under GM Unit Piparwar Area
Construction of RCC drain with cover slab and some slab near kabristan at Hijukita rehab site under Rajmahal Area.
Cleaning and repairing of Drain and Septic tank and disposal of garbage etc at Vikash Bhawan under Bastacolla Area