Repairing and cleaning of drain No. 01 , East side, 2 seam, 3 seam of West Modidih with culvert cleaning Under Katras Area
Making slabs including cleaning drain from plot no. 593 to 601 and 602 to 610 at Lohandia rehab site under Rajmahal Area.
AMC for cleaning of drain and garbage removal around the residential quarters at New Miners Colony under Sawang Colliery (For two years).
Construction of RCC drain from Opposite of billu verity and gift shop bella to Creative fibrotech in Ward No. 08 under AMC
Construction of RCC Drain from Hanuman Mandir to House of Rai Ji at Nirmal Nagar, Manjhitola in Ward No. 15 under AMC
LEVEL UPLIFMENT AND STRENTHENING OF EXISTING COURTYARD CUM PAVEMENT AND CONSTRUCTION OF 2 X 2 BRICK DRAIN WITH COVER AT DDC GOPNIYA
CONSTRUCTION OF P.C.C. ROAD, GUARD WALL AND DRAIN FROM GAMEHAL STHAN TO NEWARI KABRISTAN VILLAGE NEWARI PANCHAYAT NEWARI BLOCK LATEHAR DIST LATEHAR
Construction of RCC Drain both side of road at sahdev nagar from bachan singh house to sonu house under Ward No- 32
Cleaning of drain around light vehicle shed, canteen, fresh water pump house and back side of PO Administrative Building under Rajrappa Washery
Making Catch drain to prevent run-off water around Binglat and Honhey OB Dump under Amrapali OCP of A-C Area, CCL
Construction of RCC drain with cover slab at expansion site at Lohandia rehab site, under Rajmahal Area. (70.0M)(Plot.no-491 to 761)
Construction of 01 No. RCC Culvert along Madarsa road over main drain at OB dump rehab site (Jamayi tola) under Rajmahal Area.
Making of Kutcha drain along the coal transporting road from chamatu road towards imli chawk under Magadh OCP of M-S Area
Heightening of RCC main drain with cover slab from Rajendra Das house to Patta Mela at Dakaita rehab site under Rajmahal Area.
Construction of R.C.C drain from sri Ram kunj to shiv mandir to manorma vatika apartment in gram nawadih, Block- Dhanbad, Dist- Dhanbad
Construction of R.C.C. Drain with cover Slab from Indro Yadav house to Bhagwan Das Pandit Ward No. - 13 under Nagar Panchayat, Koderma
Cleaning of existing garland drain and culvert at different locations in mines for monsoon preparation work under Karma Project of Kuju Area.
CONSTRUCTION OF RCC DRAIN WITH COVER AT VILLAGE KOLDIH FROM HALL TO KALI MANDIR, G.P. SABAIJOR UNDER BLOCK SARATH IN DEOGHAR DISTRICT
Cleaning of septic tank and drain and providing slab for NHS qtr in staff colony of loyabad coke plant under Sijua area
Construction of RCC Drain at Birsa nagar road no-01 from hatia station road to old existing culvert under ward No-50
Construction of RCC Drain with slab in ward no 07 Jarmundi from Jiya Pal house to Cement Dukan under Nagar Panchayat Basukinth
CONSTRUCTION OF 500 FT DRAIN FROM KHORJO TALAB TO LANKA PURTY KHET IN GRAM TUIBANA PANCHAYAT KOKCHA BLOCK TANTNAGAR WEST SINGHBHUM DISTRICT
PCC drain near 4,5,6 Incline opposite of road side of culvert back side of B-type Block no.10 at Central colony
Repair of Katcha drain by stone masonry from light vehicle road to CT Road at kali Mandir ground KDH project, NK Area.
Fallen boundary wall with water tank and small drain of qtr no. 1B10 at River Side, Bhurkunda under GM Unit BS, Sayal.
Construction of RCC branch drain with cover slab from plot no.135 to 138 at Naya Bhorai rehab site, under Rajmahal Area.
Cleaning the slurry and debris under the weighing platform of Muraidih New Weighbridge and its outside drain on regular basis Barora Area
Drain cleaning and ash, garbage and septic tank cleaning at RHB Colony and Nehru Chowk colony for 03 months under Barora Area
Construction of RCC branch drain with cover slab from plot no. 429 to 433 at OB dump rehab site under Rajmahal Area.
Repairing of damaged septic tank inspection chamber branch drain at block no. 04 B-type colony of nichitpur township under sijua area
CONSTRUCTION OF RCC DRAIN WITH COVER FROM HOUSE OF MAHADEO PANDEY TO HOUSE OF PITAMBER MEHTA IN WARD NO 10 UNDER DNP.
construction of RCC drain with cover from DEY MEDICAL TO SUNNY PASWAN HOUSE VIA SANDEEP SAW HOUSE ,W.N.14, Nagar Parishad, Chaibasa
Cleaning and Repairing of drain near East side of 28th Quarry for monsoon preparation (2018-19) Bhowra (S) Colliery under E.J. Area.
CONSTRUCTION OF RCC DRAIN FROM HOUSE SHANTI MADAM TO HOUSE OF SHIV KUMAR KESHRI AT WARD NO 06 UNDER NAGAR PARISHAD, SIMDEGA
Repair of Main drain from NHS D/S Block No-285 to end of NHS S/S 205/410 at Urjanagar colony.
Cutting cleaning and re cleaning of monsoon drain No.08 and 02 of KB 5 6 pit Hydroming Colliery under PB Area.
Construction of RCC drain along Lohandia Rehab site edge towards Harakkha side of Pampiya pond new rehab for Basdiha (L-560 Mtrs.).
Construction of RCC branch drain at Dakaita rehab site (Near over head tank) under Rajmahal Area. (140M) (Plot no-338 to 591).
Cleaning of drain, Garbage and Jungle at Karmik Nagar colony (total 106 blocks and 1268 qtrs) for 6 months under Kusunda Area
Repairing and cleaning of drain above south of Fan house at 2 Seam bottom Keshalpur Section of AKWM colliery of Katras Area
Cleaning of drain and jungle around pit office, excavation office, mine canteen, mine sub-station etc during monsoon period under Jarangdih Colliery
Sanitary repair and drain repair work in the quarter of Shri Suresh, Accountant DAV school at Bachra under GM Unit Piparwar Area.
Diversion of drain from RBL, industrial water and main plant in view of upcoming new Kathara Washery, under Kathara Washery, Kathara Area
Repair and maintenance of PCC drain between both sides of B-type Qtrs. And M- Qtrs. Near karipani workshop under SDOCM Project.
Cleaning of drain from Hizukita coal stock (along boundary wall) to hume pipe culvert near entry gate of Nima village under ROCP.
Cutting of kutcha drain lower side of Gunjardih magazine to OCP Tarmi road under Tarmi OCP for 4 months. (Length 840 m).
Removing of sediment and cleaning of jungle beside the main drain from stelling pond to towards OB dump at Simra rehab site.
REPAIR TO COMPOUND WALL DRAIN FENCING MANHOLE SEPTIC TANK SOAK WELL AND OTHER BR MISC WORK UNDER AGE BR I AT DIPATOLI
Cleaning and Repairing of drain near East side of 28th Quarry for Monsoon preparation (2017-18) of Bhowra (South) Colliery under E.J.Area.
Upkeepment of spilled materials from outside Slurry pond drain at PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL