Loading…
Loading…
18,538 results • Best match
Repair to Bridge over Basundhara Nallah on Baladbandha To Bileibahal road_Road_ maintenance and colouring of parapet, guard post and Repairing of Approach, Flexible appron._At 1.000 Km
Repair to Bridge over Routray Nallah at 4.050 Km on Chanameri Nuasahi under BSY Asset_Road_Vent Cleaning, Repairing of Railing and post, and Painting_Left Approach 0.000 to 0.150
Repair toH.L. bridge over local nallah at 2.700 km on RD Road -Basta bazar - to kusudiha at 2.70km near Mukundapur village_Road_CC Renewal coat,colouring,Railing_2.300 to 2.700
Construction of Bridge over Sarbejal Nallah on Jamankira to Sarbejal road in the District of Sambalpur under the scheme Setu Bandhan Yojana for the year 2024-25
Shifting of Electric lines for the work Construction of Bridge over Mandapathara Nallah at 5th KM on Kadaliguda to Narayanprasad road Building in the Dist of Ganjam
Drain
MISC REPAIR TO RCC JALI DRAINS FOOTPATH COMPOUND WALL IN MOHAN NAGAR PRAKASH NAGAR AT CHANDIPUR UNDER AGE BR I CHANDIPUR
Providing RCC slabs(cast-in-situ) to open drains at Sikharachandi road cluster-1 and cluster-2 in ward no-1
Cleaning of jungle, drains at and around HEMM workshop campus at Lingaraj OCP, Lingaraj Area. (For a period of 1 year)
Cleaning of Bushes,Drains Upkeeping of toilets,Roads etc in the premises of Regional store under Bharatpur Area for 02 Years.
Desilting of Storm Water R and B Drains in BMC area for ensuring Monsoon 2025 under PWD Division-I (Phase-I)
Desilting and cleaning of road side drains coming under jurisdiction of Bhubaneswar RandB Division No.V, Bhubaneswar for the year 2023-24.
Cleaning of jungle, drains at and around HEMM workshop campus at Lingaraj OCP, Lingaraj Area (For a period of 1 year)
Periodical cleaning of oil, grease trap, settling tanks and drains inside workshop complex at LOCP for a period of 730 days.
Providing 04 Labour Manpower for cleaning of Hume pipes, Drains etc of Kulda mines for Monsoon 2022 under KOCP of BA
BALANCE WORK OF MUWPH, INTAKE CHANNEL, FOREBAY, INTERNAL ROAD, DRAINS ETC FOR CW AND MAKE UP WATER SYSTEM WORK AT DSTPP
Construction of C.C drains with slab from Chunu Lakra with Dhanjaya Mohapatra towards Murli Bala house and adjacent gali. No-16
Desilting of Storm Water R and B drains in BMC Area for ensuring monsoon 2025 under PWD Division-I (Phase-II)
Construction of Longitudinal and Vertical Drains on Down stream of Earth Dam from RD 800M to 1600M of Baghalati Irrigation Project.
De-silting of settling ponds, earthen and RCC drains in different places of South kaliapani mines in the district of Jajpur
Construction of RCC drains with cover slab from H-6/11 to H-6/17, H-5/18 to H-5/13,H-4/20 to H-4/02 and L-27/07 to main drain 09 via L-31/13in Panchasakha Nagar area under Ward no-64
IMPROVEMENT WORKS TO DRAINAGE CHANNEL
BRIDGE WORK
Renovation of Drainage syphone with both side Guard wall
Congestion Clearance of different Drainage Channels under Mahanga, Nischintakoili and Salipur Block for the year 2023-24.
SPECIAL REPAIR (ADDITION / ALTERATION) OF INTERNAL BLACK TOP ROADS AND DRAINAGE IN KV SCHOOL AT INS CHILKA
Repair to canal bed and drainage syphone at RD 2220m of Sakosingha distributary of Derjang Irrigation Project.
FABRICATION SUPPLY AND ERECTION OF CHECKDAM CUM FOOTBRIDGE OVER RANSALA DC NEAR VILLAGE SHANTIPURUNDER DRAINAGE DIVISION JAJPUR
Renovation of shopping complex including arrangement for water supply drainage system and site development at CWS IBV
Renovation of North Quarry Substation including boundary wall, drainage and providing two wheeler shed at Bharatpur OCP.
Congestion Clearance of Drainage Channels in Athagarh, Narasinghpur, Badamba and Banki Block for the year 2023-24.
FABRICATION, SUPPLY, TRANSPORTATION AND ERECTION OF DRUDA SLUICE UNDER DRAINAGE DIVISION, JAGATSINGHPUR FOR THE YEAR 2021-22
Construction of Toilet and drainage system inside the premises of Dargah Bazar Outpost in Ward No. 18.
REPAIR TO DRAINAGE SYPHON OF GOPALPUR DISTRIBUTARY AT RD.7.285KM AND RD.7.702KM INCLUDING SLOPE PROTECTION WALL.
Improvement to Baunsadia Drainage Cut including 02 Nos. of VRB near village Kiadimiri and Olamarai under DIP.
Construction of Drainage Syphon on Karandia Branch Canal at RD 1.500 Km for the year 2025-26
Improvement to Kentia Bahakuda Drainage Cut by Construction of Sluice Cum Farm Land Bridge Near Village Kentia.
Development to Sukapaika Drainage Channel from RD 0.00M to 30850M with Structures in Cuttack Sadar Assembly Constituency.
Survey and Investigation works
Construction of spur and Drainage Channel of Parimala sluice on KSDR embankment at RD.60.20 Km
Balance work for the Renovation Bhargavi -Ratnachira Drainage system with structures under Pipili Block, Doab-VII
CC Drain
Drain work
Facility Management Services - LumpSum Based - Industrial; Cleaning of storm water drains of attack plant, RE- evaportation plant and boiler by motorized tanker; Consumables to be provided by service provider (inclusive in contract cost)
Renovation of cross regulator and renovation of drainage syphone
Construction of RCC drain wall at Chidananda Vihar on main Drain no 9
Construction of RCC drain wall at Rajiv Nagar on Main Drain no 09
Construction of RCC drain wall near Kharvela Complex on main drain no 9