Loading…
Loading…
10,012 results • Best match
Laying PCC on various sts of Social Nagar and covering of Budha Nallah near Domoria Bridge in w no.84 and Laying PCC 1 2 4 in Chawni Mohalla and sts near Sawa Gurudwara in w no.84 and Laying RMC M-20 in sts of Jason s Road and Fashion King in w no 84
C/o Pontoon Bridge on River in Punjab Sector during 2022-23 SH: Re-erection, Maintenance, Dismantling and watch & ward of Pontoon Bridge on Nomini Nallah near BOP Chaura Forward and Kamalpur Jattan in the AOR of Gurdaspur Sector 89 BN. BSF, Punjab SH: Providing services of inspection vehicle for BFSD, CPWD, Amritsar during 2023-24
CASE DRAIN PIPE FOR SSL 3H0782, HOSE ASSY FOR SSL 3H0772, HOSE ASSY FOR SSL 3H0778, HOSE ASSY FOR SSL 3H0725, HOSE FOR SSL 3H0438, HOSE FOR SSL 3H0843, HOSE ASSY FOR SSL 3H0436, HOSE ASSY FOR SSL 3H0435, HOSE FOR SSL 3H0767, QUICK COUPLING FEMALE FOR SSL 3H0439, QUICK COUPLING MALE FOR SSL 3H0440, O RING 3B0077
Laying Synthetic Surface Basketball Court with Fencing, Drainage & Accessories
Estimate for laying of MS Main Riser pipes from Main Diversion (D1) to Lakher Diversion Including 1 No Cross Drainage Structure , providing and fixing air valve , scour valve, NRV etc complete in all respect for providing lift irrigation facilities t
Running and maintenance of 14 no. motors for lift schemes and 43 no motors for old sub surface drainage system in various villages under jurisdiction of bathinda drg. Sub div., bathinda for the period 1-4-2022 to 31-3 2023
Desilting and removal of River Bed material from village Gurchak Gunia on R/S of R/Ravi RD 457 mtr to 1120 mtr to eliminate Drainage congestion and protect residential Areas,Agricultural Land from potential flooding, erosion.(Site 3B)Distt.Gurdaspur
Running and Maintenance of 10 no Lift schemes Sub Surface Drainage Scheme Pakki Tibbi and Shallow Tubewells 4 no Pakki Tibbi falling in jurisdiction of Canal Const Sub Division No 6 Sri Muktsar Sahib for the Year 2020 to 2021.
Estimate for laying of MS Main Riser pipes from RD 1900 to Main Diversion (D1) Including 3 No Cross Drainage Structure , providing and fixing air valve , scour valve, NRV etc complete in all respect for providing lift irrigation facilities to village
TPTFA for the work of Providing, laying, jointing of 2400mm i/d MS Carrier pipe under railway line and construction and laying of RCC box and manholes for storm drainage at Sector junction 100/101 and 103/104, SAS Nagar.
Estimate for laying of MS Main Riser pipes from Pahadpur Diversion to Tank 4 (Village Pahadpur) Including 1 No Cross Drainage Structure , providing and fixing air valve , scour valve, NRV etc complete in all respect for providing lift irrigation faci
Running Maintenance of 10 no. lift schemes and sub surfaces drainage scheme Pakki Tibbi and Shallow Tubewells (4No.) Pakki Tibbi falling in to jurisdiction of Canal Const. Sub Division No.6 Sri Muktsar Sahib for the Period 01.04.2022 To 31.03.2023
Special Repair to link road Chabewal Mona Kalan upto (Hoshiarpur Phagwara Road) in Chabbewal Constituency Group No. 1 (SR 2021-22) Phase IV (Earth work to First Coat including tack coat seal coat and PC with cross drainage works etc.)
P/L of PVC pipe for drainage of one side water from Mohan Lal Dhiman house to Jai Kishan Gulati house in Ward No. 6-7 and construction of street from Mohan lal Dhiman house to Bhatia General Store in Balachaur
Estimate for Running Maintainance of 11 no. Motors for lift schemes and 11 No. Motors for old sub surfaces drainage system in various villages under jurisdiction of Draiange Sub Div no. 2 Muktsar at Abohar for the period 01.04.2021 to 31.03.2022.
Estimate for laying of MS Main Riser pipes from Main Diversion (D1) to Tank 3 (Village samlah) Including 1 No Cross Drainage Structure , providing and fixing air valve , scour valve, NRV etc complete in all respect for providing lift irrigation facil
Third party independent techno-financial Audit for ongoing 3 nos works of Construction of flood mitigation structure on left side/edge of river Sutlej and Construction of sub surface drainage system in water logged area of Abohar-1 (Dhani Chirag)
P/L Drain and interlocking Paver in different streets of Shivalik Enclave and Shivalik City street ward no 17
Const of Drain and I/L Tiles h/o Hardeep Singh to Atta Chaki Ward no 8 and 9
R/C Estimate for Const. of Street and Drain Near Asha Ki Marhi in Ward No. 4 M.C Lalru
C/O DRAIN AND INTERLOCK TILES ST. PARVATI, ST. JATTI, ST. RAMLA, ST. MOHINDER BIJLE WALA WARD NO. 15
CLEARANCE OF SARKANDA, WEED JALA, BOOTI, HYACINTH ETC IN BETWEEN RD 0 - 18000 OF TEHANG DRAIN IN DISTRICT JALANDHAR
Estimate for clearance of sarkanda, weed, jala, hyacinth etc in between RD 520000-RD 439000 of East Bein drain.
Const. of drain and P/f interlocking tiles Sangatpura Mohalla Sansaar Combine to Talwar M.C. House Ward no.2
P/L drain and I/L Paver tile from H/O Bahadur Singh in ward no.3 MC kharar.
Construction of Main pumping Station and Storm Water Sewer from Doaba Chowk to Drain at Jalandhar Town (Under AMRUT)
R/C ESTIMATE FOR CLOSING THE DRAIN AND CONST. OF CHAMBER IN JAIN JANJH GHAR MAHALLA AND ADJOINING STREETS
P/L interlocking tiles and Drain pipes near # Kartar Sing, Bhajn Lal GTB Nagar ward no 5 MC kharar.
REPAIR TO COMPOUND WALL, DRAIN, FENCING IN AREA A1 OF AGE B/R-1 UNDER GE (W) JALANDHAR CANTT
PROVN OF DRAIN AGAINST JOB NO. 81SA/BTD/LBW-05/2024-2025 UNDER GE NORTH BATHINDA AT BATHINDA MIL.STN.
Const of Drain and cc flooring near Durga Mandir to NH-52 and Chandni Shingar Palace ward no. 13
Repair of Drain Type-1 and II, Culverts and Interlocking Tiles in different Streets of Ward No. 5-8
Desilting/Clearing of Sarkanda, Weed, Jala, Booti etc. from Lalton Pamal Drain in between RD 0-45750 by Machinery
Estimate for Clearing of Sarkanda weed jalla booty etc from Aspal Drain RD 20500-123210 before Monsoon season 2024
Rehailitation of 24 Inch ID RCC P-1 Rising main From Mandi kalan to Lissara Drain at maur Mandi
Repair to Brick Drain Cover Slabs including connected in domestic area at Mil Stn Dappar under GE (P) Dappar
Construction of Earthen Bank along L S of Kala Singha Drain in between RD 37000-68500 in Distt. Kapurthala
Closing of Open Channel Drain and CC Flooring in street No.3,5,10 Bhagt Singh Colong Colony W No.13
Repair of C.C Flooring, Interlocking tile Street, Drain, Road Gali, Mainhole, Chamber and Other in Ward No. 09 Phillaur
Const. of drain and cc flooring n/h/o jodha singh to jagdish singh ward no.1 (chanda colony)
REPAIR TO COMPOUND WALL, DRAIN, FENCING IN AREA A-3 OF AGE B/R-I UNDER GE (W) JRC
Construction of New Road from Patti Town to Shivala Mandir along Patti Drain in M.C. Patti, District Taran Taran
Construction of two nos culverts on existing drain including approach road at the entry points of Urban Estate, Gurdaspur
Clearing of Sarkanda, Weed, Jala, Booti etc from Old Machhiwara drain in between RD 0 to 16800 by mechinary
Desilting/Clearing of Sarkanda, Weed, Jala, Booti etc. from Gopalpur Rangian Drain in between RD 0-27500 by Machinery
Const. of DB Paving on Edge and Drain near h/o Bant Singh to Kirpa Sunder ward no 2
Const of street and drain type 1 h/o pitamber sood h/o sucha singh fatehpur w no 12
Providing and fixing tiles and drain from Nector life gate no.2 to Haripur Hindua to Municipal Limit Saidpura
P/f interlocking tiles and const. of drain from Vishnu ji resi. to Ashok ji resi ward no. 11
Laying I/L Tile at Brehm and Drain Street Sukha Singh Dharamshala to S/o Amanveer Singh, W.No. 3