Loading…
Loading…
5,361 results • Best match
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25.
Construction of RCC Retaining , Length-25.00 mtr at Ch.0.300 km and RCC Drain from Ch.20.00 mtr to 90.00 mtr etc
SH- Repairs to road by Re-carpeting, Repairs of potholes, Road side drain etc. portion from Ch. 0.00 Km to 0.630 Km.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25.
SH- Repairs to road by metalling, carpeting, flat brick soling, road side drain etc. portion from Ch. 0.00 k.m to 0.560 k.m.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25
S.H.-Formation, Cross Drain, Protection wall, GSB, WBM - 3, Carpeting and Sand Seal Coat etc. ( L - 0.90 Km. ) (Based on SoR-2020).
Patch Soling, Patch Carpeting, Patch Seal coating, Protection Work, cleaning of land slide, maintenance of earthen shoulder, surface drain etc. (Gr-I)
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25
SH- Repairs to road by metalling, carpeting, flat brick soling, road side drain etc. portion from Ch. 0.080 k.m to 0.800 k.m.
SH Soling, WBM, Carpeting, RCC Drain, Toe wall etc. under Scheme for Special Assistance to States for Capital Investment for 2024-25
WBM-III, Concrete Blocks, Carpeting, Repairs to road by Potholes repair, Re-Carpeting, road side drain etc. during the year 2024-25.
Supplying and spreading of brick bats and rubbish including surface dressing katcha drain etc on different roads under Jubarajnagar R.D. Block area.
Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc. during the year 2024-25.
Earth filling, GSB, WBM-II and III, BC, RCC cover drain etc. from Ch. 0.00 (near R.K. Pur P.O.) to Ch. 370.00m.
Please refer to DNIeT
SH- Removal of Soil, Construction of Embankment, Missing Soling, Repairs of Potholes, Unlined surface drain, Palasiding Works etc. during the year 2024-25.
Repairs to road by WBM-III, , Flat brick soling, Carpeting, Road side Surface Drain etc. portion from Ch. 0.660 k.m to 1.460 k.m.
Grouting, Re-carpeting, Seal coating, Flat brick soling, Bats filling, Palasiding, Landslide clearing, Clearing of Jungle, Road side katcha drain and allied works
Grouting, Re-carpeting, Seal coating, Flat brick soling, Bats filling, Palasiding, Landslide clearing, Clearing of Jungle, Road side katcha drain and allied works.
WBM Grading-2,WBM Grading-3, Brick Solling , Carpeting, Toe wall, C.D, Surface Drain and Mtc. of earthen shoulder etc.(L-1.450 KM)
SH- Removal of soil, Construction of Embankment, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works etc. during the year 2024-25.
SH- WBM Gr- 3, Grouting, Re-carpeting, tack coat, seal coat, surface drain, palasiding, Gunny bag placing etc. during the year 2025-26.
Patch repairing, carpeting, premix seal coat and Construction of RCC drain, mtc of shoulder etc and other allied works (L_0 point 75 Km)
SH- Removal of Soil, Construction of Embankment, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works etc. during the year 2024-25.
SH_Paver Block, Flat brick Soling, WBM_II, WBM_III, Brick Masonry work, RCC Drain and other ancillary works_Ch_0point00 to 0point350 Km (L_0point350 Km)(2nd Call)
Grouting, Re-carpeting, Seal coating, Flat brick soling, Bats filling, Palasiding, Landslide clearing, Clearing of Jungle, Road side katcha drain and allied works.
Development of internal road, surface drain etc. of Govt Press, GA (Printing and Stationary) Department (L-190.00 mtr) during the year 2025-26
SH Plastering, painting, flooring, drain, boundary wall and all allied works for Judges quarter and Security guard room during the year 2021-22.
S.H- WBM-3, Grouting, patch-carpeting , seal coat, sand-seal coat and unlined surface drain etc (Portion from 0.00 km to 8.50 km)
Soling, WBM3, Carpeting, Road side drain and other allied works under PWD (R and B ) Boxanagar Sub-Division during the year 2023-24.
SH- Flat brick soling, WBM Gr-3, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2024-25 (Group-III)
Grouting, Patch, WBM-3, carpeting, seal coat and surface drain etc. during the year 2023-24 Portion from 0.00 km to 1.90 km
Grouting, Re-carpeting, Seal coating, Flat brick soling, Bats filling, Palasiding, Landslide clearing, Clearing of Jungle, Road side katcha drain and allied works
Patch grouting, Patch Soling, Patch Metalling, Patch carpeting with sand seal coat, Pot holes repair by Shalipatch and road side kutcha drain etc.
SH- Patch metalling, patch carpeting, grouting, Sand seal coat, Protection work, Earth work, 01 (one) no CD in/c road side drain etc.
SH Repair of pot holes, recarpeting sand seat coat, seat coat and unlined Surface drain etc.(Portion From 5.00 km to 7.00 km)
Earth Work, sand filling, PCC, RCC etc
under PWD (Store) Sub-Division, Dharmanagar during the year 2021-22
Works
Works
Repair of pot holes, Patch WBM, Brick Soling, Rep-Carpeting, Tack Coat, Seal Coat, Surface drain and Mtc. of earthen shoulder etc.(2nd Call)
patch Soling, Metalling, Carpeting, roadside drain, Retaining wall and other allied works under PWD (R and B) Sub-Division during the year 2024-25
SH- Construction of Internal Roads /SH-Construction of GSB,WBM,PMC, 1(one) no C/D ,Drain,Main Gate and cycle stand(3rd Call).
Patch Soling, Patch Metalling, Patch Carpeting, Re - Carpeting and sand seal coat at different stretches in/cl unlined Surface drain etc./ Kathalia Block Area.
Patch Soling, Patch Metalling, Patch grouting, Carpeting, sand seal coat, surface drain and other allied works (Portion from Ch. 0.00 Km to 2.40 Km).