Loading…
Loading…
5,361 results • Best match
Road works.
Repairs to road by Re-Carpeting, WBM-III, Repairs of Potholes , Road side drain etc. during the year 2023-24
Guard wall, drain, grouting,re-carpeting etc. under Bishramganj Sub Division, Sepahijala, Tripura during the year 2023-24 Group-I,
Supplying and laying of Mixed Class Bats and Rubish, Clearing of Jungle, road side Kucha drain and gunny bags etc.
Protection of culvert and construction of Rcc drain(Barabhaiya-Khupilong road) at West Khupilong Panchayet during the year 2020-21
Grouting, Re-carpeting, Seal coating, Flat brick soling, Palasiding, Bats filling, Landslide clearing, Road side katcha drain and allied works
SH- WBM-III, Repairs to road by Potholes repair, re-carpeting, road side drain etc. During the year 2024-25.
with wing wall, Grouting, Tack coat, Patch Carpeting, Seal coat, Excavation in Cutting of soil and unlined Surface drain etc.
Patch soling, placing gunny bags, surface drain and side berm lowering etc on different road within Panisagar RD Block area.
Protection works , Construction of Embankment, Soling, Metalling, Carpeting Repairs of Potholes, Unlined Surface Drain, etc. during the year 2024-25
SH- partial WBM, Metalling, Carpeting, seal coat, Laying of Spun pipe ,unlined surface drain (portion from 0.00m to 400 m).
Repairs to road by WBM-III, Potholes repair, carpeting, Re-carpeting , road side drain etc. during the year 2022- 23.
Repair of pot Holes,WBM, Carpeting and Surface Drain etc.(portion from Ch. 0.00 km to 3.30 km)./3rd Call.
SH- Flat brick soling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain, Palasiding, Gunny bag placing etc.(2nd Call)
Patch soling , WBM-3 , Carpeting ,Grouting , Brick Toe wall ,in/c side drain etc. (Ch.0.00 km to 3.0 Km).
Sh Pot holes repair, patch carpeting, seal coat , repair of road side drain etc from ch.0.00 to 1.80 Km
Grouting, Re-carpeting, Seal coating, Flat brick soling, Palasiding, Bats filling, Landslide clearing, Road side katcha drain and allied works
SH- WBM-III, Repairs of Potholes, Carpeting, Re- Carpeting, Protections works, Unlined Surface Drain etc. during the year 2024-25
Patch soling, placing gunny bags, surface drain and side berm lowering etc on different road within Jubarajnagar RD Block area.
Grouting, Re-carpeting, Seal coating, Flat brick soling, Palasiding, Bats filling, Landslide clearing, Road side katcha drain and allied works.
SH- Patch Soling, grouting , Patch carpeting,Premix Seal coat,repairing of side shoulder, cutting kacca drain with other allied works.
S.H Patch metalling, Pot holes Repairing, Patch carpetting, Seal coat, Side drain etc. during the year 2021 2022 (2nd Call)
Grouting, Re-carpeting, Seal coating, Flat brick soling, Palasiding, Bats filling, Landslide clearing, Road side katcha drain and allied works
SH-Grouting, patch-carpeting, seal coat, sand seal coat and unlined surface drain etc. during the year 2022-23 PWD
SH- Construction of Bridge approach on both sides with Bituminous Carpet road, Side drain, river protection work etc.(2nd Call).
Grouting, Patch-carpeting, Seal coating, Flat soling, Palasiding, Bats filling, Land slide clearing, Road side katcha drain and allied works
SH- Grouting, patch carpeting , seal coat , sand seal coat and unlined surface drain etc. during the year 2022-23 PWD
Patch metalling, Bituminous grouting, Re-carpeting, Road side katchha drain, Stripping of excess soil from shoulder and other allied works
Construction of RCC Retaining wall, RCC road side drain, patch soling, patch matelling, grouting, Re-carpetting and other allied works
Deck Nut, Transom clamp, panel pin, Bracing bolt, raker nut, painting, jungle clearance, mtc. Of earthen shoulder, surface drain etc
Brick Soling, WBM Gr-3, Prime coat, Tack coat, Carpeting, Seal coat , Surface drain etc. during the year 2022-23.
SH- Repairs to road by Re-carpeting, Repairs of Pot Holes, road side drain etc. during the year 2022-23.
Repairing,maintenance and rcc work
Please refer to DNIeT
Tender for consultant empanelment
WBM-II , III, Tack Coat, Bituminous Concrete etc. during the year 2026-27
Periodical maintenance of road from US Road - Manughat Para to Mandali Para (Link No. L038) (Length- 2.419 km) under Suvarna Jayanti Tripura Nirman Yojana Scheme under Satchand Block in PWD (R and B) Division, Sabroom during the year 2023-24
Construction
Side shoulder dressing, unlined surface drain, removal of unsuitable soil, patch soling, mixed class bats and other allied works. (Gr-III)
Grouting, Re-carpeting, Seal coating, Flat brick soling, Palasiding, Landslide clearing, Clearing of Jungle, Road side katcha drain and allied works.
SH-Metaling, Grouting, Re-carpeting, Tack Coat, Seal coat, Pucc drain etc. during the year 2025-26 (Gr-II).(2nd Call)
Grouting, Re-carpeting, Seal coat,unlined surface drain etc. under Bishramganj Sub-Division, Sepahijala, Tripura during the year 2023-24.(GroupI)
SH_WBM_III, Flat soling, RCC drain, guard wall, carpeting and other ancillary works_Gr_II (Ch 0 point 25 to 0 point 34 Km)
Grouting, Re-carpeting, Seal coating, Flat brick soling, Palasiding, Landslide clearing, Clearing of Jungle, Road side katcha drain and allied works.
Grouting, Patch WBM-3, Patch Carpeting, Seal coat and Surface drain etc Portion from 0.00 km to 5.60 km 2nd call
Applying of FRP in drain, Acid tank and foundation platform and floor of DM Plant of TGBPS, NEEPCO ltd., Monarchak, Tripura.