Loading…
Loading…
5,331 results • Best match
Development of the road from Purba ganki bibadi club to Bhagat Singh pally via purba ganki L 1.00 k.m Ch. 500.00 m to 1000.00 m under PWD RandB Khowai Sub Division during the year 2026 27 SH WBM PMC, Seal Coat, Pucca Drain etc. G 2
SH- Paver Block, retaining wall, toe wall, pucca drain and unlined surface drain etc.(2nd Call)
Construction of drain slab and paver block road from the H.O Parimal Shil to h.O Gurudas Sutradhar via Tinku Das at Nabinpalli shiltilla, under ward No.43 AMC.
Construction of drain and road by paver block at goli road of Partha Bhattacharjee at last end of Ramnagar Road No 2 under Ward No 15 AMC TUEP
Development and construction of drain work under AMC Ward No.37.
Building portion including internal water supply, sanitary installation, Sewage and Drainage work.
SH- Grouting, widening and laying of BC, drainage work including road furniture.
Soling, WBM, paver block, carpeting, 2 nos. box culvert, drainage work etc
SH- Grouting, Widening, laying of BC AND drainage work including road furniture.
Mtc. of brick masonry pucca drain from the H.O. Shri J.B.Roy to H.O. Shri Prantosh Saha at Unnayan Sangha in the mother Teresa Lane at Subashpalli and const. of CC road from H.O. Shri Tanmay to Habul Datta back side of Govt. press W-39, 2nd call
Maintenance of road side berm / drainage system from Gomati DM office to Bramhabari / Construction of RCC cover Drain during the year 2025-26
FDR Maintenance of road from backside of A.D Nagar Store complex end to Ramthakur Ashram at AMC Ward No. 47 L 0.40 Km under the jurisdiction of Central VIII subdivision, PWD R and B during the year 2024 25 SH WBM 3, Drainage work, Carpeting, Groutin
under Santirbazar Municipal Council.
Re-carpeting, Grouting and Construction of Pucca Drain near old SDM complex, Chailengta.
SH_Patch repairing, patch metalling, carpeting, premix seal coat, construction of pucca drain etc
Soling WBM3 Carpeting Seal Coat Pucca drain and other allied works (Group-1)
WBM-III, Interlocking Paver Block, Pucca drain etc. during the year 2023-24
SH Patch WBM, Grouting, Re-carpeting , road side pucca drain and allied works.
- Formation , WBM-3 Paver Block protection work and road side Pucca drain etc.
patch metalling,patch grouting,patch carpeting,seal coat,road side pucca drain etc.
WBM-2, WBM-3, tack coat ,PMC, seal coat, roadside pucca drain etc.
WBM3 Carpeting Seal Coat Pucca Drain CD Protection work and other allied works
Stripping excess soil, Earth Filling, Grouting, Flat Soling, Gunny Bags, Pucca Drain etc.
SH- Construction of Roadside Pucca Drain, Patch Repair by PMC, Seal Coat etc.
SH Patch WBM, Grouting, Re-carpeting , road side pucca drain and allied works.
WBM-III, Carpeting, Road side Pucca drain etc. during the year 2023-24
SH WBM3 Carpeting Seal Coat Pucca Drain and other allied works(2nd Call)
SH- Patch soling, WBM 2,WBM 3, PMC, CC Block ,Pucca Drain etc.
construction of RCC Retaining Wall Road side pucca drain etc and allied works
Patch metalling, re-carpeting, pucca drain etc ( portion from 1.00km to 4.50 km).
Grouting, Patch soling, Bats filling, patch carpeting, road side pucca drain etc complete.
Patch Soling, patch WBM, Carpeting, Seal coat, pucca drain, and other allied works.
WBM, Tack Coat, Seal Coat, PMC, CD and Road Side Pucca Drain etc.
SH- Earthwork, Brick soling, CD works, pucca drain, C.C. works protection works etc.
SH WBM III Tack Coat Carpeting Seal coat Box culvert and Pucca Drain
SH- Patch Soling, WBM, Carpeting, Seal coat, pucca drain and other allied works.
Patch Grouting Re carpeting seal coat pucca drain etc. Ch. 0.00km to 04.00km.
WBM-III, Carpeting, Road side Pucca drain etc during the year 2023-24.
SH WBM3 Carpeting Seal Coat Pucca Drain and other allied works(2nd Call)
SH- PUCCA DRAIN works, protection works , WBM-III, Carpeting, Re- Carpeting works etc.
Formation, Soling, RCC Box culvert, Slab Culvert, Protection wall and pucca drain etc.
Patch Grouting ReCarpeting with sand seal coat Pucca Drain and other allied works
SH- Patch WBM, Grouting, Re-carpeting, road side pucca drain and allied works.
SH Patch Metalling Grouting Re carpeting road side pucca drain,and allied works
Patch Soling, patch WBM, Carpeting, Seal coat, pucca drain, and other allied works.
SH- Pucca drain, Patch Grouting, Patch WBM III, Patch Carpeting, Seal coat etc.
Soling WBM3 Carpeting Seal Coat Pucca drain and other allied works (Group 2)
Patch Grouting ReCarpeting with sand seal coat Pucca Drain and other allied works
WBM-III, Carpeting, road side Pucca drain etc during the year 2023-24.
Road side Pucca Drain and other allied works Ch 0.00km to Ch 0_330km