Loading…
Loading…
5,343 results • Best match
Construction of cover drainage system from the H.O Dipa Saha to H.O Tapan Saha at Hapania Sukanta Palli under ward No 48,AMC.
Mtc. of different roads under Jatanbari Sub-Division SH--Soling, WBM, Re-carpeting, grouting, sand seal coating, Surface drains and Gunny Bags etc. during the year 2022-23
Construction of boundary walls around the water project site, drains, cc road , rest points in/c all allied works at Phuldungsei under DWS Sub-Division Kanchanpur/ Gr-III
FDR/repairing of road from Silachari Bazar to Ananda Bandu Para, (Length-2.00km) during the year 2024-25 ,/SH-WBM,Re-carpeting, sand seal coating,Surface drains etc.
FDR / Yearly mtc. of different roads under Ambassa Sub-Division during the year 2021-22 / SH- road sideberm cutting, side drains, soling, pallasiding and gunny bag placing etc.
Mtc. of different roads under Jatanbari PWD( RandB) Sub-Division SH-Soling,WBM,Throughout Re-carpeting, grouting, sand seal coating,Surface drains etc. during the year 2023-24.
Periodical repair of Road from Barkathal new market to barkathal TSR camp ( L-1.25 Km) during the year 2025-26/ SH Unlined surface drains, Carpeting, CD, etc. complete
Repairing of internal roads to inverter rooms of the solar plant and repairing of drains inside the solar plant area at 5MWp Solar Power Station NEEPCO Ltd Monarchak
Construction of boundary walls around the water project site, drains, cc road , rest points in/c all allied works at Phuldungsei under DWS Sub-Division Kanchanpur/ Gr-II
Construction of boundary walls around the water project site, drains, cc road , rest points in/c all allied works at Phuldungsei under DWS Sub-Division Kanchanpur / Gr-I
Maintenance of Boundary Wall at different places around the periphery of the Kumaritilla Govt. Quarter Complex including maintenance of surface drains at various places inside the quarter complex
FDR / Yearly Mtc. of different roads under Ambassa Sub-Division during the year 2020-21 /SH- Road Sideberm Cutting, Side Drains, Soling, Pallasiding and Gunny Bag placing etc.
Construction of cover drain(CC drain) from Shafal Paul house to Dipali Das house at Belabar GP under Dukli RD Block
Construction of a drain near M.I office,Amarpur to Trizunction existing drain, in an ANP area during the year 2019-20
Const. of RCC drain and Imp. Of existing drain infront H.O Manik Debnath at Chandrapur Baldakhal under ward no 25,AMC
SH- Surface Drain ,Road side pucca Drains,Landslipe Clearance, WBM-3, PMC,Sand seal coat, CD works etc. Group II
SH- Surface Drain , Road side pucca Drains, Landslide Clearance, Protection wall, WBM-3, PMC, Sand seal coat etc. Group-I
SH- Surface Drain ,Road side pucca Drains, Landslide Clearance, Retaining wall, WBM-3, PMC, Sand seal coat etc. Group- I.
Re carpeting and patch carpeting, patch WBM and grouting, surface drains, stripping, RCC drain, ramp by means of Paver Block
Cleaning of sewerage line,manhole,drainage and septic tank at campus Nalkata of 145 Bn BSF Now (179 Bn BSF) under SHQ BSF Panisagar
Construction of Pucca Drainage channel from Charanpai Para AWC to Samarendra Reang House at Kalshimukh ADC Village of Jolaibari R.D. Block (PWD SoR-2023)
Construction of C.C road with drainage system from the H.O Manik paul to H.O Sri Pabitra Debnath at Hapania under ward No 38,AMC.
Construction of C.c road with drainage system from the H.O Sri Bimal Das to H.O Radhesyam Das at Nanditilla ,under ward No.38,AMC.
Construction of C.C road with drainage system from the H.O Dayal Paul to H.O Smt Kamala Ghosh at Hairmara,under ward No 38, AMC
Construction of road by paver block with drainage system from suman sarkar to H.O Sadhu Satrkar at Sabuj palli under ward No 48 AMC.
Construction of R.C.C drain and Partly Brick Masonry Drain within D.M.C area During the Year 2020 2021 Gr 1 L 330.00 M
Construction of R.C.C drain and Partly Brick Masonry Drain within D.M.C area , During the Year 2020 2021 Gr 4 , L 330.00 M
Construction of R.C.C drain and Partly Brick Masonry Drain within D.M.C area , During the Year 2020 2021 Gr 5 , L 330.00 M
Construction of R.C.C drain and Partly Brick Masonry Drain within D.M.C area, During the Year 2020 2021. Gr 3, L 330.00 M
Construction of R.C.C drain and Partly Brick Masonry Drain within D.M.C area During the Year 2020 2021 Gr 2 L 330.00 M
FDR-maintenance of KA road from Chainage 28.00 Km to 33.00 Km during the year 2019-20 SH- Clearance of side drains, landslides, carpeting, patch repairing, bats filling etc.
Periodical repair of Road from Sachindra debbarma house to Faribari ( L- 0.7 Km) during the year 2025-26/ SH Unlined surface drains, WBM-3, patch repair, Carpeting, etc. complete.
FDR-Mtc. of different roads under Jatanbari Sub-Division SH-Soling, WBM, Re-carpeting, grouting, sand seal coating, Surface drains and Gunny Bags etc. during the year 2022-23.
FDR/ Yearly Maintenance of different roads under Ambassa Sub-Division, PWD(RnB) during the year 2024-25 / SH- Unlined Surface Drains, Soling, Pallasiding, Gunny Bag placing etc.(2nd Call)
Periodical repair of Road from Tulsiram Para to Radha nagar TSR camp ( L- 1.2 Km) during the year 2025-26/ SH Unlined surface drains, patch repair, Carpeting, etc. complete.
Mtc of different road under Khumulwng Sub Division during the year 2024 25 SH Patch WBM-3, patch Grouting, Re Carpetting, Sand seal coat, Pucca drains etc.(Gr II).
Maintenance of road under Jurisdiction of Construction Sub_division_II during the year 2023_2024_SH_Flat Soling, Brick edging , Grouting , PMC ,Sand seal coat ,Excavation of Earth, Surface Drains and other allied woks.
FDR of different PWD roads under PWD RandB Khowai Subdivision during the year 2026 2027 SH WBM III Pot hole repair Grouting Seal coat Surface drains etc. Gr II
Construction of RCC drain in/c maintenance of existing drain at ward no-12 of Udaipur Municipal Council from Tara Mia to Haradhan Dutta house /SH RCC drain, brick work etc during the year 2025-26
SH Dismantling and demolishing of existing damaged drains and re-construction of RCC drain and road side kerb, toe wall etc.
SH-Surface Drain ,Road side pucca Drains,Landslipe Clearance, WBM-3, PMC,Sand seal coat, CD works etc. Group I2nd call.
CONSTRUCTION
Mtc of road from Mainama PMGSY road to Mainama DRA Camp (L-2.50 Km) under the jurisdiction of PWD (RB) Boxanagar Sub Division during the FY 2024-25/ SH- Patch soling, Construction of protection wall, Road side pucca drain etc. and allied works.
Construction of RCC drain from Terttiary Center to main road drain at West Chandrapur under Dharmanagar Municipal Council for the year 2024-2025.
Construction of Masonry Drain from the house of Pinki Bhowmik to Chandan Banik at ward no_22 UMC_UDP_2025_26 Total Length of Drain 60.00 m.
Const. of RCC drain with cross drain beside of Shambhu Shill house of ward no-12 under ANP area during the year 2021-22.(EST-74-2021-22).(L-55.00 m, cross drain L-9.00 m)
Cleaning of Drain Garbages and Transport it to Dumping Ground of Different Main Drain From Ward No. 01 to Ward No. 08, Under Kailashahar Municipal Council During the year of 2023-2024