Loading…
Loading…
5,349 results • Best match
Construction of Surface drain, plinth protection and leveling of ground at Iswarchandra Vidyasagar Chatrawas attached to Bodhjung HS School, Agartala
Constn. Of Channel from Bailyram Reang land to cross drain at East Raitwisa VC under Kumarghat R.D Block. 2nd call
Construction of R.C.C Drain At Kurti Road To Cock Well within DMC Area During the Year - 2023 - 2024 Gr - 1
Construction of RCC Drain near the house of Tuku Dhar Under Kaialshahar Municipal Council during the year of 2022-2023
Construction of R.C.C Drain At Nayapara Kali Bari To Shishu Bihar School within DMC Area During the Year - 2023 - 2024
Mtc. of drain at the road from TK road to Ayurvedic hospital under Moharcherra GP during the year 2023-24
construction of RCC drain from hospital road to palpara ground under Bishalgarh Municipal Council W/No-o7 during 2020-21
Development of Dalak Market under Amarpur Agri Subdivision SH Construction of 3 Three Nos Market Stall Drain and CC Road
Construction of CC Road with cover drain from Ranjit Hrishidas house to Rajarshi Bakery Road, Milanchakra, Badharghat, Ward No. 46
Construction of RCC drain from Amrit Shil house to DWS boundary at Debendranagar GP under Bamutia RD Block (Phase-I)
Construction road by paver block, mtc of CC road and drain at different places under Ward No 14, AMC TUEP
Construction of RCC slab over existing drain at Bimal Rudra Paul Gali AMC ward No-32 under TUEP material component
Construction of CC drain including other allied works at different places of ward No- 35 under TUEP material component AMC
Mtc. of Agartala Town Road During The Year 2023 24 SH Renovation of road side drain at Nutanpalli, Dhaleswar, Agartala
Construction of cover drain from the H.O Sunil Debbarma to Gunadhar Saha at Debnath Para, under ward no.06, AMC
Construction of road by paver and drain from the H.O Kishor Rn. Dey to Gouri Saha under ward no.05
Development of galli and drain with necessary allied works near H.O Shahnawas Amin to Ajit Dhar under Ward-36, AMC
Development of drain from H.O Dulal Miah to Furan Miah including construction of a culvert at Ward No-36, AMC
Construction of cover drain at IGM lane beside of AARUSHI apartment to Peter England showroom under Ward No-32, AMC.
Proposed construction work for RCC drain near H/O Kamal Debnath at South Indranagar under ward no.10,AMC.phase I.
Laying of Inter Locking paver blocks and drain work in new complex at FSD Dharmanagar for the FY 2024 25
Construction of cover drain from Nandannagar Primary School to H.O Swapan Debnath at SDO Chowmuhani, under ward no.06, AMC
Construction of R.C.C. Drain at Ward No 13 to 25 within D.M.C.area during the year 2024 2025. length 247.00 mtr
Const.work for mtc. of ward office 29 brick soling and drain at various place under ward no29,AMC 2nd call
Construction of RCC drain and wall from Goutam Majumder to H.O Amal Dey at Santa Nagar under ward No 46AMC.
Construction of R.C.C. Drain at Ward No 01 to 12 within D.M.C.area during the year 2024-2025 length 247.00 mtr
Const of road and drain mtc at Ramthakur Ashram main road to Bajaj servicing centre under ward no 21 AMC.
Const. of drain and brick soling road at Nathpara, Sreepalli and College Tilla at Ward No.45, TUEP. 2nd call
Construction of foot bridge road by brick soling , drain and Rcc slab at various places under ward no.27,AMC.
Construction of RCC road, slab and drain mtc. of the goli road of Shekaresh Chakraborty under Ward No-18, AMC
Improvement of road by RCC, slab, drain maintenance and allied works at Manasha goli Gangail under Ward No-14, AMC
Construction drain from H/O Pradip Paul to H/O Banti Deb at Collegetilla under Ward-31, AMC Central Zone.
Construction of P Wall drain and soling from the H.O Sajal Deb to Swapan Saha under ward No 49 AMC.
Flexible Drain Hoses for Wash Basins/Sinks (Q3) MSE Relaxation for Turnover Yes | Complete Startup Relaxation for Turnover Yes | Complete
Works
SH-Protection work, cross drainage,bats filling, block pitching etc.
SH Drainage works during the year 2021 2022 (Gr III)
Excess soil removal, Missing soling, Surface drains, Stone grouting, Patch metalling (Jhama Brick), Tack coat using hot bitumen, Re-carpeting using mechanical means (Paver finisher), Brick masonry drains, Box culvert, Traffic signs and markings .....
land slide clearing drain bats filling gunny bag placing soling etc
Recarpeting Surface drain toe wall etc (Length considered - 0.90 km)
Re-carpeting and Patch carpeting, Patch WBM and Grouting, Surface drains, Stripping Works etc.
Re-carpeting and Patch carpeting, Patch WBM and Grouting, Surface drains, Stripping Works etc.
Widening, Re-carpeting and patch carpeting, patch WBM and Grouting, Surface drains, stripping etc
Patch Grouting, Patch metaling, Re-carpeting, Seal coat, construction of drains etc. (Gr-II).
Patch metalling, Grouting, Re-carpeting, CD, Road side pucca drains and other allied works.
Stripping, Brick bats and Rubbish Filling, Brick Soling, Surface Drains and Protection works etc.
SH- Grouting ,patch carpeting, Seal coat, soiling, jungle cutting, unlined drains, gunny bags etc.
SH- Grouting ,patch carpeting, Seal coat, soiling, jungle cutting, unlined drains, gunny bags etc
SH- Patch Soling ,single bamboo pallasiding, unlined surface drains, removal of unsuitable soil etc.
SH-Grouting, patch carpeting, seal coat, jungle cutting, unlined drains, protection work etc./ Gr.I