Loading…
Loading…
5,352 results • Best match
Maintenance of Agartala town road during the year 2022 23 Road Portion from SBI Bank of Khush Bagan to Bazar Kolkatal SH Construction of RCC Drain Gr I L 150.00 m. 2nd Call
Construction Of Cover drain at various spot a. PWD road to house of Nasir uddin L 86.00M. b. PWD road to house of Bacchu Miah L 109.00M. Ward No 03_UMC_2023_24.Total Length 195.00M.
Periodical renewal of PMGSY road from Ampi to Baishyamani Para (L-054) under Ampi Block(Package No.-TR-02(Stage-II) SH- Road side Brick masonry drain with RCC cover. (L-200.0 m)
Mtc. of various road within Teliamura Minicipal council area ward No. 8 to 15 (L-1.35 KM)/SH- Patch repairing, re-carpeting, drain and sand seal coat etc. during the year 2020-21.
Mtc. of village approach road of Sabual under Jampuihill R.D Block during the year 2020 21 SH Patch Metaling, Bituminous Grouting,Carpeting, Seal coating including road side drain both kutcha and pucca etc.
Mtc.of road from Atharabhula to NH (L8.20 Km) under Killa PWD(RandB) Sub-Division / SH Patch Grouting, Patch Carpetting, Seal Coat, Unlined surface drain , maintenance of shoulder etc. during the year 2022-23
Mtc. of road from Dasda-Anandabazar to Anandabazar High School via Anandabazar road under Dasda Sub-Division during the year 2022-23 SH WBM, Carpeting, Seal Coat, Surface drain etc. L 1.00 Km
Urgent mtc of road Kanchanpur to Dasda(L-13.00km) under Dasda Sub-Division,PWD(RnB) during the year 2025-26/S.H Construction of R.C.C drain at Satnala Bazar from portion 9.10km to 9.20km.
FDR - repairing of different roads with in Karbook sub - divisional area, PWD R and B during the year 2022 -23. SH-Grouting, WBM, carpeting, sand seal coating, and surface drain etc. Gr-II
Mtc of different roads under the jurisdiction of PWD R and B Kailashahar Sub-Division No. I, during the year 2023-24. SH Bats filling, flat brick soling, shoulder maintenance, kutcha drain, etc
Urgent Mtc of roads under GP of Fatikroy, Rajnagar ,Gokulnagar, Radhanagar and Krishnanagar during the year 2019 20 SH Stripping, Gunny bags filling, Patch repairing, Soling, Surface Drain, Carpeting and Seal coat etc
FDR/Mtc. of road Starting from Lalchand para to Binod bihari Debnath house under PWD(R and B) Sabroom Division during the year 2024-25. / S.H - RCC Drain and Retaining wall. (Gr-I).
Construction of RCC drain at Rabindra Palli Goutam Majumder house to Nikunja Shil house via Shukhendu Dhar house under Belonia Municipal Council Ward No-08 during the year 2025-26 L-250.00 mtr
Construction of RCC drain including slab from Sani Mandir to Naresh Paul house via Bikash Paul house at Ward No-11 under Ambassa Municipal Council during the year 2024-2025.L-120 mtr.
Development of road at A.A. road to A.A. road via Fish market under Teliamura Municipal Council during the year 2025-26 (L - 0.80 km)./SH- Constn. Of RCC cover drain, paver block etc.
Mtc. of the road from Dasda Anandabazar road to Sadhak Ratanmoni Vidyalaya under Dasda Sub Division during the year 2022 23 SH Soling, WBM, Carpeting, Seal Coat, Surface drain etc. L 0.125 Km
Construction of boundary wall including surface drain with Mtc of brick soiling and Repairing with Mtc of GCI roofing at Officetila Govt. Food Godown under Khowai Sub Division as per PWD SoR-2023
Mtc. of various road within Teliamura Minicipal council area ward No. 1 to 7(L-1.335 KM)/SH- Patch repairing, re-carpeting, drain and sand seal coat etc. during the year 2020-21.
Construction of RCC drain from Narayan Bhattacharjee house to Satyendra Das house via Jyoshna Debnath house at 1 No Goutam Coloney under Bishalgarh Municipal Council W/No- 01 CH 0.00 to 95.00 M
FDR to different road at ward no 36,38 and 46 under central VIII Sub division during year 2022 23 SH Maintenance of road side berm, grouting, patch carpetting, seal coating and drain maintance
Mtc. of Agartala town road Construction and Mtc. of RCC roadside Drain with footpath and allied works from P10 to P13 and P14 to P21 in rightside under Bordowali AC Length 300.00 m
Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Banamalipuir Area SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc
Development of Agartala town road during the year 2026-27 SH Development of Road side drain etc at the road from NH near Palki Marriage Hall to Ashirbad Gas agency L 325.00 Mtr
Mtc. of road from Barman Bari to Krishna Das house at end point of Panchayet Para road including construction of road side drain of UMC ward No-16 during the year 2022-23
Mtc. of village approach road of Hmawngchuan under Jampuihill R.D Block during the year 2020 21 SH Patch Metaling, Bituminous Grouting,Carpeting, Seal coating including road side drain both kutcha and pucca etc.
Const of RCC drain from Saradapalli road n/h of Ghanashyam Gowala to Pabiacharra steel bridge n/h of Ranu Debnath at ward 12 under Kumarghat Municipal Council during the year 2023-24
Periodical maintenance of PMGSY road from KK road to Halambasti during the year 202122 SH Patch metalling Pot holes repairs Re Carpeting seal coating and road side drain Length 3 point 553 Km
Const. of R.C.C. drain from near the house of Nihar Ranjan Roy to Maracherra via n/h of Bipul Debnath at ward No. 13 under Kumarghat Municipal Council during the year 2023-24
Mtc. of road from SDM Office to TSR HQ via Late Rathindra Naths house under Dasda Sub-Division during the year 2022-23,SH WBM, Carpeting, Seal Coat, Surface drain L 1.20 Km
Minor Maintinance of road from NH-8 to NIT Agartala (CH 0.00 Km to CH 1.50 Km) under Jirania Sub-Division during the year 2021-22 SH Patch grouting, soling, surface drain etc.
Development Of the road from Rabindranagar to Shibnagar, under Jampui Hill Sub-Division, PWD(RnB) during the F.Y. 2026-27 SH WBM,Tack coat, re-carpeting, seal coating, Pucca n Kacha drain etc
Maintenance of road from Manasa Mistanna Bhander near Flyover to steel bridge at Pratapgarh SH Construction of RCC drain, Patch WBM, Patch Grouting, BM, Carpeting etc. during the year 2022 23 Gr III
Maintenance of Agartala town road during the year 2025 26 under the Jurisdiction of Shivnagar Area SH Repair of road by providing Carpeting, Grouting, Patch carpeting inc mtc. of road side drain etc
Mtc. of Govt. residential building during the year 2026-27 SH Maintenance of portion of existing boundary wall including construction of RCC drain at the East side of Malanchaniwas Govt. Qtr. Complex, Agartala.
Construction of Cement concrete road with RCC drain from Dipak Saha house to Farukh Hossein house via Mantu Saha house under Bishalgarh Municipal Council. W/No - 11. (CH 0.00 M to 152.00 M)
Strengthening of road from NH-8 to Kamalacharra from Ch.1.60 Km to Ch.3.10 Km (L-1.50km)/GSB, WBM-II, WBM-III, Carpeting Road side drain, protection wall , CD etc. (2nd Call)
Construction of paver block road from the H/O Chiranjit Majumder to H/O Swapan Majumder and Drain Near Bidhan Sarkar House at Netaji Colony ,at ward no 6 under Jirania Nagar Panchayat
FDR work of different PWD roads under PWD Khowai Sub Division during the year 2026 27 SH Patch repairing by soling Brick bats road side earthen drain Protection works Carpeting etc. Gr. I
Mtc. of various roads under the jurisdiction of Central VIII Sub division, PWD RandB during the year 2023 24 SH Patch WBM, Patch soling, Recarpeting, Grouting, Sand seal coat, mtc. of drain etc
Maintenance of road from Manasa Mistanna Bhander near Flyover to steel bridge at Pratapgarh SH Construction of RCC drain, Patch WBM, Patch Grouting, BM, Carpeting etc. during the year 2022 23 Gr I
Improvement of road by paver block with RCC drain slab from the H.O Sri. Kajal Deb to H.O Pradip Das Chowdhury at the back side of Indranagar High School under ward no.08
Const of drain with slab and Imp of road by CC st from H.O Dhanu Ranjan Saha to H.O Ashutosh Kar at Dhaleswar road no 2 near Bandh under ward no 23 AMC
CONSTRUCTION OF DOUBLE STORIED MARKET GF SHED FF STALL AT KALAGACHIA MARKET COMPLEX UNDER MOHANPUR AGRI SUB DIVISION TOTAL 03 UNITS SH CONSTRUCTION OF INTERNAL ROAD ALONG WITH SURFACE DRAIN and YEARD DEVELOPMENT
Maintenance of Agartala town road during the year 2022 23 Road Portion from SBI Bank of Khush Bagan to Bazar Kolkatal SH Construction of RCC Drain Gr II L 150.00 m. 2nd Call
OR Work of NH08 From Km 305 to Km 310 Ramnagar to Chamtilla selected stretches in the state of Tripura during the year 202223SH maintenance of road surface shoulders drain etc. 2nd call
Maintenance of different roads under Mandwi Sub-Division during the year 2026-2027 SH Patch Grouting, Patch Carpeting, Missing soling, Construction of surface drain etc. and other allied works. (Group-III)(2nd Call).
Construction of CC road on existing brick soling along with drain and RCC Retaining wall from U/S road to Milan Nag house via Samarendra Dey house at Fulkumari GP under Matabari R.D.Block.
Urgent maintenance of road from Garia para to Bijoy para under PWD(RandB), Gonda Twisa Sub-Division during the year 2026-27/SH- Jungle clearing, surface drain, patch repairing, flat brick soling etc.
Construction of RCC drain with cover slab and paver block road from house of Ranjit Majumder to house of Milan Debnath under ward no 12 UMC UDP 2026 27 Total length 83.70 m.
Development of Agartala town road under the jurisdiction of Central-VII Sub-Division SH Improvement of Road and Drain from Nagerjala Bharat Medico upto House of Chirantanu Debnath via Star Ice-cream factory