Loading…
Loading…
5,352 results • Best match
OR Work of NH08 From Km 284 to Km 295Churaibari to Bagbassa selected stretches in the state of Tripura during the year 202223SH maintanence of road surface of selected stretchesshoulders drain etc 2nd Call
Development of Santipara area by construction of RCC cover drain from Kasharipatty to Oil mill goli via Santipara Pond and Aikatan Club and RCC road at Oil mill goli road under Ward No-20, AMC
SH- Construction of brick masonry drain, C.D. with RCC slab, patch WBM, patch soling, grouting, clearing road side drain, repairing of side shoulder, cutting kutcha drain with other allied works.
WBM,Re-carpeting,Surface drain etc.
patch repairing Recarpeting surface drain etc
Grouting,pmc,seal coat,drain etc
Missing Soling, Const. of Drain etc.
Earth work and RCC cover drain
Paver block, PMC, RCC drain etc.
WBM,Re-carpeting,surface drain etc
WBM,Re-carpeting,drain,CD etc.
Recarpeting,grouting,CD,surface drain etc.
SH- Road side drain, recarpeting etc.
Formation, metalling, carpeting, CD, drain etc
Soling, WBM, PMC, drain mtc etc
WBM-3, carpeting, RCC drain etc.
Construction of IBB Road and fence between BP No. 2270 to BP No. 2283 Road Length- 66.16 Km and single row modular gencing 23.435 Km in Dhalai District of North Tripura. SH- Road and Fence between BP No. 2276 to BP no. 2270 Road Length- 36.52 Km and ... cross drainage and ...
Maintenance of Road from US road to Madhya Doulbari under PWD(R and B) Sabroom Division during the year 2024-25/ Construction of RCC drain from Damdama DTW scheme to Arun Nama House (3rd Call)
Construction of R.C.C drain from the house of Jiban Das to the house of Madhuri Das via Dukhyaharan Das at ward no-2 under Sabroom Nagar Panchayat during the financial year 2022-23.(length-165mtr)
Mtc. Of road from U-K road to Raiya Molsom (L 1.50 Km) under Killa PWD (RandB) Sub-Division./ S.H. Patch Grouting, Patch carpetting ,Seal coat, unlined surface drain etc during the year 2022-23
PR of the road from Uttar Tuisama Panchayat office to South Tuisama Purnajoy School road under Dasda Sub Disivion during the year 2022 23 SH Metalling, Carpeting, Seal Coat, Surface drain etc. L 1.30 KM
Periodical mtc. of handed over PMGSY road from Kalamkhet to Jharjaria (L-044, Length-7.68 km) under Mohanbhog RD block/SH- GSB, Patch WBM, grouting, recarpetting, CD, CC drain, protection work etc and allied works
PR of 1. Dasda Bazar Area road 2.PWD RandB Dasda Sub Division office road under Dasda Sub Division during the year 2022 23 SH WBM, Carpeting, Seal Coat, Surface drain etc. L 0.56 Km
Construction of Synthetic Turf Football Ground at Kakraban H S School at Udaipur Gomati SH Development of football ground by artificial Synthetic Turf hard drawn fencing RCC covered drain Foot path and ancillary room etc
FDR / repairing of road from KBK-JTB road to Chalagang via Nabojoy Para during the year 2023 -24. / SH- Grouting, Flat Brick Soling and Unlined surface drain etc. at Chainage 0.00 Km to 6.00 km.
Mtc. of road from 7th Bn TSR to Jampuijala bazar via Natun nagar (L 2.20 km) during the year 2023-24 SH Grouting, patch WBM-3, carpeting, seal coat and surface drain, paver blocks etc.
Mtc. of road from KMA road to Paijabari road via Ambassa PHC from Ch. 2.10 km to Ch. 2.60 km. during the year 2024-25/ SH- Grouting, Patch repairing, re-carpeting, seal coat, drain etc.
FDR/Mtc. Of road from U-A road (Maharani Fish Market) to Chaigaria S.B. School during the year 2024-25/ SH- Construction of RCC Retaining wall and CC Drain near the house of Biplab Kunda
Mtc. of road starting from NH-08 to Jawharnagar Railway Station (L-390.00 Mtr) during lhe yeat 2024-251 SH- Patch metalling, grouting, re-carpeting, seal coating in/c constn. of unlined surface drain etc.
Maintenance of road from Ghaniamara Chowmuhani to Kamthana Bazar (Length_4point3 Km) during the year 24_25_SH_Construction of CC,RCC drain, allied works portion from Shil Chow to Arabinda Nagar Gram Panchayet office_1point7 Km to 2point4 Km_Group_I
FDR / repairing of different roads with in the jurisdiction of Sub - Division No.-I, PWD (RandB) during the year 2023 -24. SH Flat brick soling,Grouting,WBM,Carpeting, Sand seal coating, and Surface drain etc.
Mtc.of road from Khedacherra to Duganga Length 7.657 Km under Damcherra Sub Division PWD R and B, during the year 2022 23 SH Patch metalling, patch soling, patch carpeting, seal coating and surface drain etc.
FDR-Mtc. of different roads under the jurisdiction of PWD Sub-Division No. II, Amarpur, during the year 2019-20,SH - Landslide Clearance, Surface Drain, Grouting, Patch Carpeting, Seal Coat, Wire Crates and Bats Filling
FDR Mtc of various roads under GP VC of Fatikroy Rajnagar Gokulnagar Radhanagar and Krishnanagar during the year 2024 25 SH Stripping Gunny bags filling Patch repairing Soling Surface Drain Carpeting and Seal coat etc
Urgent maintenance of Krishna chandra para S.B School approach road under Gonda Twisa Sub-Division, PWD (RandB) during the year 2025-26/SH- WBM-2, WBM-3, re-carpeting, side shoulder levelling, surface drain etc.
Maintenance _ Repair of road side drain alongwith widening of CC road and brick masonry work at periphery of Tennis court etc at Kunjaban extension under PWD Capital Complex Division during the year 2022-23_Gr-I
Mtc of road from Fatikroy to Jagannathpur road during the year 2022 23 SH Patch grouting stripping and road side kutcha drain etc in between ch 0 km to 4 point 90 km Gr I
Rain Water Storage project MI Scheme at Icha Cherra under Karbook Block Gumati District SH Construction of RCC Canal with all necessary cherra road drain crossing Job No TR MI 16 RIDF XXII 2016 17
Improvement of road from Belmura to to Dugrai para under 1-Simna Assembly consituency during the year 2024-25/SH Protection work, GSB, WBM-III, Carpeting, Drain , CD,and Earth filling etc (L-1.05 KM)
Improvement of road from Mailamura to Ramsankar para via Bakhla Para PWD road under 1-Simna Assembly Constituency during the year 2025-26 /SH GSB, WBM-II, WBM-III, Carpeting, Drain, etc. (L-1.40 km)
Maintenance of different road under the jurisdiction of PWD(R and B) Khayerpur Sub-Division during the year 2024-25 S.H Construction of brick line drain along with other allied works.(Group- II) (2nd Call)
Mtc. of road from Manu-Srinagar road to Bhuddimangal Para ( L 3.50Km) S.H Patch metalling, Re carpeting, and unlined surface drain etc. during the year 2020 21.(Portion from 0.00km to 1.680 km).Gr I
Mtc of road from Ompi to Raniabari (L- 0.45 km) under PWD (RandB) Ompi Sub-Division during the year 2025-26/SH- Re-carpeting, WBM-III, sand seal coat, 2 nos CD, drain work etc.
Improvement of road from Rangacherra Kalimandir to Pora Munda Para under Mohanpur R.D block during the year 2024-25/SH GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.40 KM)
Mtc. of Barjala road starting from Parimal chowmuhan Golaghati road towards Jorpukur via Barjala Ch.0.00 Km to Ch.1.125 km(L 1.125km) SH Side shouldering, unlined surface drain ,Grouting, re-carpeting, seal coat etc.
Repair / Maintenance of Outlet blockage of waste / sewer water near UG Gents Hostel of AGMC and GBP Hospital / SH Drain work, Roadwork and CD with other ancillary work etc. under FY 2021-22.(3rd Call)
Maintenance _ Repair of road side drain alongwith widening of CC road and brick masonry work at periphery of Tennis court etc at Kunjaban extension under PWD Capital Complex Division during the year 2022-23_Gr-II
Mtc of the road from NH 08 near JanataClub to Gouranga Debnath house L 200 mtr during the year 2022 23 SH GSB WBM 2 WBM3 Carpeting Seal Coating CD and Road side drain etc
Maintenance of Road from NH 108B( House of Sushil paul) to Bishu Malakar House via Vevekananda Palli during the year 2023-24 / SH Patch grouting, WBM-III, Carpeting , patch soling , drain etc.(L-0.70 KM)
Urgent Maintenance of Kanchanbari Hospital Quarter Complex Road L 060Km during the year 2023 24 under the jurisdiction of Ganganagar PWD Sub DivisionSH Unlined Surface Drain Flat Brick Soling WBM Tack Coat Carpeting Seal Coat