Loading…
Loading…
5,352 results • Best match
Mtc Of road from Srinagar near Dukli PWD office to Kanterjala via Laxmitilla and Mohanbashi para during the year 2023 24/ SH Construction of RCC drain CC block near Radhamadhab Mandir includingother allied works/ Group No II
Road developement from Suresh Sharma House to Swapan Shil House via Chamdra Bhusan Nath house at BK nagar at Ward No-4 under Ambassa Municipal council ( Length-0.30 Km) /SH- laying paver block, road side drain etc.
Construction of RCC Drain Protection Wall etc. for sludge disposal , Water Tanker Hydrant Post, Pathway, Thrust Block, etc. of SWTP at Fatikroy complete at Laldhar within the jurisdiction of Kumarghat RD Block under DWS Sub-Division Kumarghat
Maintenance of PWD road from Nabadiganta Kalibari to Pollan Para to Katania road via Chitta Master_s house (L_1point20 Km) under Amtali PWD (RnB) Sub_Division during the year 2025_26_SH_Construction of RCC drain and CD with other allied works
Urgent Mtc.of road from Damcherra to Balluckcherra Ch.06.25km to 12.25 km under Damcherra Sub-Division during the year 2022 23 SH Patch metalling, patch soling, patch carpeting, seal coating, road side pucca and surface drain etc.
Periodical Repair of road starting from Old AA road to Darchawi upto Railway over Bridge during the year 2023 24 length 0 point 50 km SH Soling WBMII WBMIII BM 25mm thick carpet and Earthen drain etc
FDR of road from Srinagar (near Dukli PWD office) to Kanterjala via Laxmitilla and Mohanbashi Para (L_2point24 Km) under Dukli SubDivision, PWD (RnB) during the year 2024_25_SH_Patch GSB, WBM_III, Carpeting, road side drain and other allied works
Mtc of Road from Jarulbachai (before Jarulbachai GP) to towards Dhundrai connecting with PMGSY road under Dukli Sub-Division during the year 2023_24_SH_Patch soling WBM carpeting road side drain and other allied works (Length_1 point 10 Km)
Mtc of road from South Anandanagar to Dhukhiakubra portion from Padmamohan Para to Baganbari (L_1 point 05 Km) under Dukli Sub Division, PWD(RnB) during the year 2025_26_SH_GSB, WBM, Carpeting, road side drain and other allied works
Renovation of the erstwhile B.Ed College building, Community Hall and Construction, Renovation of Boundary Wall in/c CC Road, Cover Drain for starting National Forensic Science University in Tripura at Radhanagar, Agartala, West Tripura under RD Agt
Construction ofRCC drain including Slab under Ambassa Municipal Council .SH Construction of RCC including slab from Jotish Gope house to Tapan Choudhury house at ward-08,L-80Mtr under Ambassa Municipal Council during the year 2024-2025
Mtc of Road from Bharat Sardar Para connecting with Anandanagar 9 no Para to Rupabati Debbarma house upto local cherra (Length_0point63 Km) under Dukli Sub_Division, PWD(RnB), during the year 2025_26_SH_Construction of road side drain and CD
FDR of road from Bahumani Para to Sabar Para via Ambati rubber plantation L_1 point 97 Km under Dukli Sub-Division, PWD RandB during the year 2024-25_SH_Patch soling, WBM, Carpeting, road side drain other allied works
PR of road from Lefunga Bazar to Dyanmara (L-2.50 KM) under Lefunga R.D Block During the year 2024-25/SH GSB, WBM-III, Patch repair,Carpeting, Drain , Retaining wall and Earth filling etc(L-2.50 KM)
Mtc of various roads under the jurisdiction of PWD R and B Ganganagar Sub Division during the year 2025 26 SH Stripping Gunny bags filling Patch repairing Soling Surface Drain Carpeting and Seal coat etc Gr III
Maitenance of different PWD roads under PWD(R and B) Khumulwng Sub-Division during the year 2024-25 SH Patch Grouting, Patch WBM, patch carpeting, seal coat, Brick work drain and other allied works etc. (Gr IV)
Mtc. Of the road from Phuldungsei to Khantlang Ch.- 0.00 Km to 11.50 Km under Jampui Hill Sub-Division PWD(RnB) during the F.Y. 2025-2026SH-- WBMTack coat re-carpeting seal coating Pucca n Kacha drain etc.
FDR of road from Jarulbachai to Dhundrai via East Jarulbachai ADC village council L_1 point 68 Km under Dukli Sub-Division, PWD RandB during the year 2024-25_SH_Patch soling, WBM, Carpeting, road side drain other allied works
Mtc. Of road from Helipad road to Babana Mandir Total Length -1.00 Km under Jampuihill PWD Sub-Division during the year 2022-23. SH Earth cutting, GSB, WBM-3, carpeting, seal coat, road side drain kutcha etc
Construction of CC road with RCC drain from Dilip Paul house to Alo Chakraborty house via Ramendra Sarkar house at 1 No Goutam Coloney under Bishalgarh Municipal Council. W/No - 01. CH 0.00 M to 60.00 M
Mtc.of Road from Tolakona Laltilla S.B. school to Keprampara Purbapara (L 1.52 KM) under Khayerpur P.W.D (R and B) Sub Division during the year 2024 25 SH Metalling , re-carpeting, sand seal coat, Unlined surface drain etc.
PR Of Behliangchhip Village Approach road ( Total Length 0.65 km ) under Jampui Hill Sub Division, PWD(R and B) during the year 2023 2024/SH WBM,Tack coat, re-carpeting, seal coating, Pucca and Kacha drain etc.
Mtc of roads at Kabiraj Tilla School to NH 8 and Thakur Palli Road under juridiction of Central VI Sub Dibvision SH Repairing Patch grouting Patch metalling Carpetting Drain etc allied works during the year 2019 20
Urgent Mtc.of road from Damcherra to Balluckcherra Ch.0.00km to 6.25 km under Damcherra Sub-Division during the year 2022 23 SH Patch metalling, patch soling, patch carpeting, seal coating, road side pucca and surface drain etc.
Mtc Of road from Srinagar near Dukli PWD office to Kanterjala via Laxmitilla and Mohanbashi para during the year 2023 24/ SH Construction of RCC drain CC block near Radhamadhab Mandir includingother allied works/ Group No I
Improvement of road from Jamuna Biswas House to Nipo ghosh House under Mohanpur R.D block during the year 2024-25/SH GSB, WBM-II ,III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-0.90 KM)
Maintenance of Road from Ranirkhamar to Jogendranagar Takarjala road via Ramgati under Dukli Sub-Division during the year 2023-24 / SH Patch soling WBM carpeting road side drain and other allied works Length 0 point 895 Km
Mtc of road from Boalia-Gopalnagar Road to Chinmaya Harihara Vidhyalaya (L-475.00M) during the year 2025-26/SH Patch soling, WBM, Carpeting,Premix seal coat, Box culvert(1.00X1.00M),Toe wall, drain (L-150.00Mtr) with allied works.
Mtc. of Ambassa - Gandacherra road during the year 2023-24/ SH- Patch metalling, grouting, re-carpeting, seal coating, clearing of land slide, restoration of damaged road formation, bamboo palasiding, constn. of unlined surface drain, placing of gunn
Mtc of PMGSY handed over road from kailashahar Murticherra to Golakpur link No L-T09 Length - 6.887 Km during the year 2023-2024 SH. Surface dressing, patch soling, matelling, grouting ,carpeting, road side drain,CD work etc
Improvement of road from Gairing - Sanitala road to Belmura PWD road under 1-Simna Assembly consituency during the year 2024-25/SH GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.50 KM)
Improvement of road from Agunyamura to Kalachand Deb para( Jogendra Sutradhar House) under Mohanpur R.D block during the year 2024-25/SH GSB, WBM-III, Carpeting, Drain , CD, Retaining wall and Earth filling etc(L-1.25 KM)
PR Of Behliangchhip Bazaar Approach road ( Total Length 0.320 km ) under Jampui Hill Sub Division, PWD(R and B) during the year 2023 2024/SH WBM,Tack coat, re-carpeting, seal coating, Pucca and Kacha drain etc.
Maintenance of road from Purba Noagoan School to Dashrambari via Dudhpatil under PWD(R and B) Khayerpur Sub Division during the year 2024-25 SH Patch grouting, Patch metalling, patch carpeting, surface drain, and other..(2nd Call).
FDR of road from Sabar Para to Dukhia Kobra via Gangaram PHC L_2 point 40 Km under Dukli Sub-Division PWD RandB during the year 2024-25_SH_ Patch soling, WBM, Carpeting, road side drain other allied works
Rejuvenation and Beautification of Pond near Netaji Choumuhani at ward No. 14 under Kumarghat Municipal Council. S.H.Desiltation of pond, Construction of Protection wall, Const. of Stair, Const. of waiting room, Const. of Drain, Hand railing, MS Gril
Construction of RCC drain from the house of Tapan Majumder to Nepal Baidhya house and Sunil Dey house to Ajit Sharma house at ward no-4 under Sabroom Nagar Panchayat during the year 2022- 23. (length-45mtr)
Improvement of Badurtali Lane Road portion from Akhaura Road to TVS Showroom at TRTC Road under Central-III Sub-Division PWD R and B SH Construction of RCC Cover Drain along with Road Improvement by Paver block
Mtc. of Agartala town road during the year 2023 24 SH Mtc. of different roads by soling, grouting and Patch reCarpeting, Seal coating, brick masonry drain etc. under the jurisdiction of Central III Sub Division Section VI
Construction of p/wall for road side pond brick masonry drain and C.C road st from the H.O Amar Gop to H.O Bani Sarkar at Netaji Palli rail line (Booth 1/3),under ward No 44, AMC
Mtc of different road within the jurisdiction under Central VI Subdivision, PWD R and B during the year 2021 22 SH Patch soling , grouting , metalling and Carpetting inc Brick masonry Drain RCC and allied works. 2nd Call
Imp. of road by paver block from the H.O Sri. MadanChowdhury to Airtel Tower near Satya Narayan Dham and Const. of RCC slab over existing drain near the H.O Sujoy Deb at UjanAbhoynagar, under ward no.11
Improvement of road by palasiding and earth filling near youth star club at Indranagar Kabarkhala and const. of drain near the H.O Uttam Saha to AMC ward office No.07 at 79 tilla, Ramkrishna Pally, w.07
Mtc. of Agartala town road during the year 2023 24 SH Mtc. of different roads by soling, grouting and Patch reCarpeting, Seal coating, brick masonry drain etc. under the jurisdiction of Central III Sub Division Section VIII
Improvement of road of Daftari Tilla (Bholanandapally) behind CBI office building at Gurkha basti under AMC ward no_4, Barjala AC_SH_Earth work, Retaining wall and drain works etc (Length is 0.305 Km).(Ch 0.00 km to 0.120 km.
Renovation and Painting of main Temple including Nut Mandir, Painting of Boundary wall, Covering of existing side drain, repairing of tube well, one no. barricade for animal sacrifice, Sign board of Sri Sri Durga Bari Temple Agartala
Mtc. of Agartala town road during the year 2023 24 SH Mtc. of different roads by soling, grouting and Patch reCarpeting, Seal coating, brick masonry drain etc. under the jurisdiction of Central III Sub Division Section VII
Development of road from Kanchanpur Jalabassa road to Baradupatacharrra 1.000Km, under Jampui Hill Sub Division, PWD R and B during the F.Y. 2026 27 SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Mtc of Airport road during the year 2025 2026 under the jurisdiction of Kailashahar Sub Division No.1, PWD RB, Unakoti Tripura SH Construction of Box Cell Culvert, Road Side R.C.C. Drain L0.145 Km, etc. Gr-I
Extension (Phase - II) of RCC drain from Pandit Deendayal Sarani to n/h of Chitta Ranjan Das at ward No. 04 (From n/h of Bhanu Datta to n/h of Mantosh Roy) under Kumarghat Municipal Council.