Loading…
Loading…
5,308 results • Best match
Development of the road from Barabil panchayet office road L 600m. under PWD RandB Khowai Sub Division during the year 2026 27 SH WBM, PMC, Seal Coat, Pucca Drain etc
Establishment of Centre of Excellence for flower at Lembucherra SH Construction of drain and walking road
Construction of drain from CamperBazar Auto Stand to Ward Office 38 Under ward No-38,AMC.
Construction of drain beside Ambedkar Colony and mtc. of cc road under Ward No-15, AMC
Construction of drain including RCC slab side wall and paver block road at ward no 17
Construction of drain near H.O Shyamal Paul and Toilet at Ward Office 31 of AMC TUEP
FDR Restoration of RCC drain and Retaining wall on the road of Rangamatia to Bardowal road under the jurisdiction of Sonamura Sub Division PWD (RB) during the year 2024 2025 SH RCC Retaining wall and RCC Pucca Drain.
Periodical Maintenance of the road from Chebri Chowmuhani to Taraninagar L and 6 60Km under the jurisdiction of Ganganagar sub division during the year 2025 26 SH Stripping Katcha Drain Pucca Drain Pallasiding Gunny bag Earthen Shoulder repair
Urgent Mtc. of road from Damcherra Motorstand to Damcherra Bazar from CH. 0.00 km to CH.0.60 km Length 0.60 km under Damcherra Sub Division, PWD R and B during the year 2023 2024 SH Surface Drain, Pucca Drain, R.C.C Drain with Slab covered plate ,
FDR/ Mtc. of various roads under jurisdiction of Teliamura Sub-Division No. II.SH- Pucca Drain, Removal of land slide, Brick soling, Protection work, WBM3, Carpetting etc
Grouting,re carpeting, tack coat,Seal coat, Jungle cutting, unlined drains,pucca drain,toe wall,road marking
Mtc. Of Behliangchhip Bazaar area road N Vanghmun Baptist Church road, under Jampui Hill Sub-Division, PWD(RNB) during the year 2024-2025 SH- Road side Pucca drain, PCC work etc.
Construction of pucca drain (brick) from Noyapara Majid to Bijoy river via Nanu Miya house at Raghunathpur GP under Bishalgarh RD Block, Sepahijala during the year 2025-26 (PWD SoR 2023)
Construction of pucca drain with brick wall from Purkaniya Madrassa to CD culvert at Putia GP under Boxanagar RD Block during the year 2020-21 (L-100 m)( PWD SoR 2020).
Mtc of PWD road from K F Road to NH 208 via Ghosh Para during the year 2021 22 SH. Construction of road side pucca drain near proposed old age home
Mtc. of Kailashahar Town road SH Construction of road side pucca drain from Sri Amia Roy Choudhury house to Sri Jagadish Mahalanbish house in KMC Ward No 2 L 180.00 mtr.
Construction of of Pucca drain in the road side of Cluster area from Rajnandini Jamatia House to Satish Chandra Jamatia Land under Noabari VC, Killa RD Block(including Brick soling)L225mtr
FDR work at Gopalnagar-Maharani (GM road) (L-20.00 Km) under Mungiakami R.D. Block/ SH- Patch GSB, WBM-3, C.C. Block and pucca drain work etc. during the year 2024-25
Maintenance of PWD road from BhumihinColony to NutonColony upto Rose Valley (L_1pnt40km)under AmtaliPWDSubDivision during the year 2024_25_SH Patchrepairing, patch metalling,carpeting, premixsealcoat, const of pucca drain etc (Ch0pnt80km to Ch1pnt4km
Mtc of road from Bypass to R K Mission under AMC ward No.49 SH Brick soling WBM-III Grouting Patch carpeting Seal Coat Pucca drain for the year 2024-25
Mtc. Of road from Kanchanpur-Jalabassa road to Buddhamandir-I under Jampui Hill Sub-Division during the F.Y. 2025-26 SH-Paver Block providing n placing, Pucca Drain with reinforcement etc.
Mtc. of Kailashahar Murticherra road during the year 2025 26 SH Raising of Kailashahar Murticherra road near Srirampur Trijunction by soling, metaling, carpeting,re carpeting, sand seal coat, pucca drain, etc
Periodical Repair of Kailashahar-Murticherra T.E. to Karaithal BSF Camp L046 during the year 2021-22 SH WBM grouting carpeting seal coat road side pucca drain etc. Length 1.508 2ND Call
Construction of brick soling road and pucca drain started from near the H/O 1.Suklal Hrishidas.2.Binod Das.3.Sadhan Das at different places under AMC ward no.26.
Improvement of road by paver block retaining wall pucca drain with RCC slab from the H.O Lt. SubhasSarkar to near the H.O RakhalShil near Usha Bazar, under ward no.02, AMC
Const. of Pucca drain with RCC slab, brick soling and CC road start from house of Sanjib Banik to house of Biswajit Saha, Dhaleswar Road 12 under AMC Ward No.25
Mtc of PMGSY road(L035) from T02(Harina-Ailmara road to Jalafa Sonai )to Nantu Tripura road(L-2.36km) under Rupaichari RD Block during 2021-22 SH Re-Carpeting, Pot holes repairs, Pucca drain and unlined surface drain, etc
Construction of drain road by paver block and mtc of CC road and drain at different places under Ward No 20 AMC TUEP
Construction of drain including RCC slab from the house of Lt. Ranjit Podder to Jhutan Das at Ward No. 14 during the year 2023_24 under Udaipur Municipal Council Drain including RCC cover length 175.50 m.
Construction of drain and road at MBB Club road Loknath Bari gali under ward no 21 AMC
Construction of drain, CC road and RCC slab at different places of Ward No. 31, AMC TUEP
Maintenance and repairing of Workshop along with construction of drain at ITI College, Indranagar, Agartala, West Tripura
Construction of drain Radhanagar BJP Yuva Morcha Office to Abasan via Kathakhal, under ward no.12, AMC
Construction of drain, CC road AND RCC slab at different places of ward No. 20, AMC TUEP.
Construction of drain near HO Sabita Chakraborty at Jagaharimura under Ward No 31 AMC TUEP 2nd Call
Earthwork, PCC, Brick work, Plaster and pucca drain etc.
Mtc of road from Jogendranagar Takarjala road Master Chowmuhani to Ranir khamar Sandhi Sangha via GAIL office during the year 2022_2023 SH Construction of road side Pucca drain cross drain mtc of side shoulder patch soling grouting and carpeting et
FDR of Road from Biswaraisardar Para to Dunharong Para Link no. L042 Length 3.800 km under Takarjala Sub Division during the year 2024 25. S.H Grouting, Patch WBM-3, Carpeting, Seal coat,Road marking,pucca drain and Surface drain etc.
Maintenance of road from Damcherra to Ballukcherra road at Ch. 12.05 Km under Damcherra Sub Division, PWD R and B during the year 2025 2026 SH Construction of CD,GSB,WBM 3, RCC Drain with cover plate, Pucca drain etc.
FDR Maintenance of Champak Nagar to Jampuijala road via Belbari under the jurisdiction of Khumulwng PWD (R and B) Sub Division during the year 2024-25 SH Patch Grouting, Patch carpeting, Tack coat, Seal coat, Clearing of drain, Pucca Drain..
FDR for Mtc of road from NH8 to Manughat via Chalitachari Betaga during the year 2020 2021Patch Metalling ,Patch carpetting including construction of Pucca Drain filter media and unlined surface drain portion from Ch 4.00 k m to Ch 8.50 Km
Construction of approx. 26.00mtr Pucca drain from National Highway road at Champaknagar to Kamalanagar under Jirania RD Block SH Construction of RCC drain L 26.00 mtr under PWD R and B Sub Division, Jirania During the year 2021 22 under BEUP..
FDR of road from Khantlang to Bhandarima Total Length 14.761 km under Dasda R.D Block during the year 2024 25 SH Recarpeting, Patch metalling , seal coating, Pucca drain, surface drain etc. Portion from Ch. 0.00 km to Ch. 6.10 km
Development of Road from Kukinala to Malakarbasti from CH.3.274KM to CH.9.503KM Total Length 6.229KM under Damcherra Sub Division, PWD R and B during the year 2026 2027 SH WBMIII, Grouting, Carpeting, Seal coating, Pucca Drain, Surface Drain, etc.
FDR/Mtc. of road from T.A road (Bandar Chowmuhani) to Brahmacherrra (L-1.80 km) during the year 2024-25/SH-patch metaling, Re-carpeting, sand seal coat and mtc. of pucca drain
Maintenance of various road under jurisdiction of 16 - Bishalgarh AC during the year 2024 - 25 / SH- Patch repairing Patch Metalling Carpeting Re-carpeting Soling Protection work Pucca Drain and Other ancillary works
Construction of pucca drain including RCC slab from PWD road to house of Badal Baidya under ward no_18 during the year 2023_24 Total Length 135.00 M and CC road Length 135.00 M
Maintenance of PWD road from AmtaliBazar to RosevalleyRoad via Bholagiri Ashram (L_1km) under AmtaliSubDivision during the year 2024_25_SH Patchrepairing, patch metalling,carpeting,repairing of pucca drain etc (Ch 0km to Ch 0pnt65km)
Improvement of road from Sarojini J.B. School to Border road via Bandarcherra L1.900 km under Chandipur RD Block during the year 2024 25 SH soling, metalling, carpeting, protection work, pucca drain, etc.
Maintenance of Tilakpur road SH. Construction of road side pucca drain and 5Five Nos Box Culvert of Size 1.00 1.00 M at different location of the road during the year 2024-25.