Loading…
Loading…
5,352 results • Best match
Mtc. of road from Gandacherra bazar to Gandacherra H.S School (L - 1.00 Km) under Gandacherra Sub - Division PWD (RandB) during the year 2021-22 / SH- Patch WBM 3, Carpetting, Tack Coat, Seal Coat, Side Shouldering, Surface Drain etc. (Portion form
Mtc Of road from Satchand to Bankul (NH-08) via Sindhuk pathar (Length 5.500 km) SH GSB, Patch metalling, Patch carpeting and unlined surface drain etc. during the year 2021-22. Gr-I (Portion from ch 0.00 km to 2.50 km)
Maintenance of road from Damcherra Khedacherra road to Gangajoy Para from CH.0.00 KM to 2.00 KM Length 2.00 KM under Damcherra Sub Division PWD Rand B during the year 2024 2025. SH Patch metalling, carpeting, seal coating, surface drain etc.
Improvement of road from Lembucherra to Kalkalia via Noagaon-Bazalghat during the year 2018-19/ SH Patch soling, metalling, carpeting, side drain in/c 2 nos CD portion from Noagaon up to Bamutia-Fatikcherra road (Length-2.15 Km)./Balance work.
Mtc Of road from Satchand to Bankul (NH-08) via Sindhuk pathar (Length 5.500 km) SH GSB, Patch metalling, Patch carpeting and Unlined surface drain etc. during the year 2021-22.( Gr-II )(Portion from ch 2.50 km to 5.50 km)
Periodical repair of PMGSY road from Bagbari to Durgabari Link No. L054 (L-1.67 km) under Tripura Nirman Subarna Jayanti Yojona during the year 2023-24/SH patch repairing by BM, carpeting, seal coat, side berm dressing and drain etc.
Mtc. of Raishyabari Food godown to Maya Kumar para road (L- 0.450 km) under Gandacherra Sub-Division PWD (RandB) during the year 2021-22/SH- Patch WBM-III, throughout re-carpeting, surface drain etc. (Portion form 0.00 km to 0.450 km).
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 3.20 Km to 3.95 Km. (2nd Call)
Maintenance of road from Nishan Chandra Para to Noabadi PMGSY road Via Sharat Chandra Para (Length 2.55km) under Mandwi Sub-Division during the year 2024-25 SH Grouting, Patch carpeting, Tack coat, seal coat, surface drain and other allied works etc
FDR of Road from Rajbura to Barman Para L 2.79 km under Takarjala Sub -Division, PWD R B during the year 2024-25. SH- Grouting, Tack coat, Patch-Carpeting, Seal coat, maintenance of earthen shoulder and unlined Surface drain etc
FDR of Various roads Under Laljuri RD Block areas at different chainages, under Jampui Hill Sub-Division PWD(RnB), during the year 2024-2025 SH- Paver Blocks, Repair pot holes,Tack coat, carpeting, seal coat, surface drain, PCC work etc.
Mtc. of different PWD roads under Khumulwng Sub Division PWD during the year 2020 21 SH Mtc of PWD Roads by grouting patch WMM carpeting seal coat palasiding missing soling unlined surface drain etc under South Zone of Belbari Block.
Mtc. of Lakshmipur Road under Gandacherra Sub-Division, PWD (RandB) during the year 2021-22 / SH-Side shouldering, Patch Flat Brick solling, Edge Solling, Drain and CD (1.00 mtr X1.00 mtr) etc. ( Portion from Ch. 0.00 Km to Ch 1.00 Km)
FDR Urgent flood damage repair of various roads within the jurisdiction of PWD SD No-I,Udaipur Goamti Tripura during the year 2023-24 SH. Patch repairing,Land slide clearance,Pallasiding,gunny bags filling,unlined surface drain,brick soling, bats fil
Construction of R.C.C. Drain with slab and C.C. Pavement Road at Goswamipara and others road Ward No 2 within D.M.C.area,during the year 2024-2025 Subhash Nath to Upendra Goswami at Goswamipara and Atol Chowmuni to Anup Nath and Saradindu Bhatt
Mtc of all Prisoners Ward, Female Ward,watch tower including pavement road and drain at District Jail premisses Kailashahar, Unakoti Tripura during the year 2022-23 SH. Mtc of pavement road, grading of roof, mtc of plinth protection etc complete.
PR of road from Premtala to Mullyaram Para from Ch.0.00 km to 1.50 km under Laljuri R.D Block during the year 2022-23/ SH Patch Metaling, Bituminous Grouting, Carpeting/ Re-carpeting, , Seal coating in/c road side drain etc.
Mtc of road from from Kantarjala to Baganbari (Starting from opp of Srinagar PS to Box culvert) (L_2 pt 11 Km) under Dukli Sub Division, PWD (RnB) during the year 2025_26_SH_GSB, WBM, Carpeting, road side drain and other allied works
Periodical repair of the road from AA road near Kumarghat Police station to the tea shop of Sri Ranjit Biswas towards FCI godown Total length 400 mtr during the year 2024 25 SH Soling metalling carpeting nnd RCC drain work etc
Urgent flood damage repair of road from NH-8 to Haduklau Bru settlement camp (L-3.80Km) /SH-WBM-3, Grouting,Re-Carpeting , seal coat , protection wall,road side drain and providing CC block appron etc from chainage 0.00Km to 3.80 Km .
FDR/Urgent Mtc. of Ambassa-Ganganagar road (Length-25.50 Km) during the year 2024-2025/SH- Patch metalling, grouting,re-carpeting, seal coating,constn. of unlined surface drain, placing of gunny bags, bats filling etc. in between Ch.1.00 to 25.50Km
Mtc. of Fishery road (L - 1.01 Km) under Gandacherra Sub - Division PWD (RandB) during the year 2021 - 22 / SH- Patch WBM 3, Carpeting, Tack Coat, Seal Coat, Side Shouldering, Surface Drain etc. (Portion form Ch 0.00 Km to Ch 1.01 Km)
Renewal of KMA Road to Balaram PMGSY Road (Link no-043) of Length-5.916 Km/SH-WBM-3, Grouting, Re-Carpeting, Seal Coat, Road Side Drain, Protection Wall, etc. (Chainage from 0.00Km to 5.10Km) (Job. No.TP/COM/116/205-26)
Maintenance of different roads under Mandwi Sub-Division during the year 2025-26 SH Earth Cutting, Earth Filling, Missing soling Providing and Placing of wire crates, Placing of Gunny bag Construction of surface drain etc. and other works..Gr I
Construction of R.C.C Drain Near the house of Sukumar Goswami to Bidda Sundar Das, Pragati Road and Benu Ghosh to Bijan Datta Choudhury house, Nazrul Sarani and Milan Pally At Ward - 05, Within D.M.C area , During the Year - 2024 - 2025.
Mtc of road from Nagrai Bridge to Nityabazar (Length - 1.40 km from Ch 1.3 km to 2.7 km) under Ampi Sub-Division during the year 2023-24 SH- Surface Drain, Landslide Clearance, patch WBM-3, throught out carpeting etc Group II
Construction of RCC Box Culvert (Single cell, 1.8 m x 1.8 m) width 5.5 mtr including RCC Drain and Retaining Wall near the house of Nepal Das and Jiban Hrishi Das at ward no-4, Madhuban GP under Dukli RD Block
1. Extension of drain from the house of niladriPodder to the house of SantiSaha on West side of Hariananda Girls Higher Secondary school playground and construction of boundary wall including improvement of existing B.T road during the year 2023-202
Maintenance of Road from TD Road to Chowkidar Para at CH.0.90KM under Damcherra Sub Division, PWD R and B during the year 2025 2026 SH Construction of 2.00 m 3.00 m Cross Drain, Wing Walls, Retaining Walls, Subway etc.
PR of road from Premtala to Mullyaram Para from Ch.1.50 km to 3.00 km under Laljuri R.D Block during the year 2022-23/ SH Patch Metaling, Bituminous Grouting, Carpeting/ Re-carpeting, , Seal coating in/c road side drain etc.
AR and MO Govt. Non-Residential and Residential building during the year 2025 26 SH Mtc of different Govt. Quarters and Non Residential buildings incl mtc of drain and sanitary works under the jurisdiction of Central II Sub Division, Agartala
Urgent Mtc Of road from NH 08 Pecharthal Kanchanpur to Machamara Road length 8 50 KM during the year 2023 24 under the jurisdiction of PWD RandB Pecharthal Sub Division SH Surface drain Patch soling Pot holes repair Patch Carp
FDR/Urgent mtc. of road from Agartala-Simna road(Tillabari) to NH 108B via Mohanpur Market during the year 2024-25/SH Construction of RCC Drain(L-270.00mtr) with allied works from Chatrabrinda Club to Border fencing near River Sonai.
Mtc of road from Nagrai Bridge to Nityabazar (Length - 1.30 km from Ch 0.0 km to 1.3 km) under Ampi Sub-Division during the year 2023-24 SH Surface Drain, Landslide Clearance, patch WBM-3, throught out carpeting etc Group-I
Mtc. of the road from K.N road to K.N road via Dangacherra TSR Camp, Daincherra and Ramchandrapara under Dasda Sub Disivion during the year 2022 23 SH Patch Metalling and Patch Carpeting, Seal Coat, Surface drain etc. L 8.59 KM
FDR Urgent flood damage repair of various roads within PWD Sub-Division No-I,Udaipur Gomati Tripura during the year 2022-23 SH Land slide clearance,Pallasiding,gunny bags filling,unlined surface drain, brick soling, bats filling etc. Gr-II.
UWS Scheme at Gomati District Tripura Maintenance of 0.65 MGD SWTP at Amarpur SH Extension of RCC drain for sludge line of clarifloculator of SWTP at Amarpur, Amarpur Nagar Panchayet Area under DWS Division Amarpur during the year 2024 25
Providing and lying Paver block road (L-210 Mtr)from PWD road to near the land of Amulya Nama Das including 2 nos cross drain (2 X 2) at Paschim Ganki GP under Khowai RD Block as per PWD SoR-2023
Mtc of road at store Subdivision yard PWD (RandB) AD Nagar Agartala, west Tripura length 806 m during the year 2025-26/SH-GSB, WBM-2, WBM-3, PMC, Prime coat, Track coat, Seal coat, Surface drain and road painting etc.
OR of NH-8 in between the Ch. 384.20 Km to Ch. 384.70 Km during the year 2019-20. SH Construction of RCC Retaining walls at Ch. 384.20 Km and 384.70 Km, landslide clearance, Hill side drain clearance etc. 3rd call
Mtc of Quarter buildings at RGM Hospital qrter complx during the yr 2024 25 SH Water proofing treatement of roof, plastering of ceiling, wall, colouring, mtc of flooring, water supply line, doors n windows incl const of drain etc complete.
Periodical Mtc. of PMGSY road from Sabroom to Baishnabpur (T05) (Length 6.00KM) from ch.4.00 km to Ch 10.00 km during the year 2021-22 SH. Grouting, Re-carpeting, Sand seal coat, Unlined Surface drain, Maintenance of Earthen shoulder, etc
Construction of R.C.C drain from the house of Kamal load to the house of khokan Banik via Maru Dey house, at Ward No -7 (Length - 43.00 Mtr.) Under Sabroom Nagar Panchayat Sabroom,South Tripura during the financial year 2022-2023.
Mtc. of Bankarghat road (L-1.00 km) under Gandacherra Sub-Division PWD (RandB)during the year 2018-19/SH - Patch WBM 3, carpeting, tack coat, Seal coat, side shouldering, surface drain etc. (Portion form 0.00 km to 1.00 km).(2ND call)
FDR of road from Kathaltali GP to Amtali Ramkrishna Pathsala School incl back gate of R K Mission L_1 point 75 Km under Dukli Sub-Division during the year 2024-25_SH_Patch soling, WBM, Carpeting, road side drain other allied works
Maintenance of Different road under Khumulwng Sub-Division PWD(R and B) during the year 2025-26 SH Patch WBM 2, WBM 3, Patch Grouting, Patch Carpeting, Tack Coat, Seal Coat ,Road Side Drain and other allied works (Gr-II).
Mtc of different brick soled roads within Dalugaon area including construction of 01 No CD in the road from NH - 208 to NH - 208 via Ramkamal School during the year 2023-24 SH. Resoling, soling, shoulder repair, surface drain, C.D., etc.
Mtc Of road from Santir Bazar to DM colony L equal to 3 50 Km during the year 2023 24 SH Stripping Patch repairing Soling Surface Drain Carpeting and Seal coat etc ch 1 00 km to 2 00 km
Mtc. of road starting form AB road to Sangkharam Para/ SH- Providing GSB, WBM, Prime Coat,Tack Coat, Carpeting, Seal Coating etc. in patches in/c construction of road side drain. Ch. from 4.00 Km to 4.75 Km.(2nd Call)
Flood damage and restoration of Road from Uttarpara to Paschimpara Link No 060 L- 0.500 km SH patch Soling patch Metalling re-carpeting road side drain and other allied works under PWD (RandB) Boxanagar Sub-Division during the year 2024-25