Loading…
Loading…
5,352 results • Best match
Maintenance of Road from Mahadev para Ailaghat PWD road (near Sukanta Debnath House ) to Cenema hall Dighalia PWD road via Hatat Colony during the year 2024-25 / SH Grouting,patch WBM-III, Patch Brick soling Carpeting, seal coat, Surface drain etc
Mtc. of road from Fulchari (Buddimangal para) to Sankar Tilla via nitya Roaja para(Length 4.00Km)SH Missing Soling, WBM-3, carpetting, and unlined Surface Drain etc. (Portion From 3.372 km to 4.00 km) During the year 2022-23 (3rd Call)
Yearly mtc of Ambassa-Gandacherra road(L-53.00 Km) (Portion from 25.00 km to 53.00 km) under Gandacherra Sub-Division PWD (RandB) during the year 2019-20/SH- Grouting, Patch carpeting, side shoulder levelling, patch flat brick soling, surface drain
Periodical maintenance of PMGSY road from Hapania to Madhabpur Link No L T05 under Amtali PWD RnB Sub Division during the year 2023-24/ SH Patch WBM Patch repairing Carpeting Premix seal coat CC Drain and other necessary works Length 3point773km
Construction of CC gali road and drain started from near the 1.H.O Anju Bhowmik to Ananya Beauty Parlour at Dhaleswar road no-01. 3.H/O Rakesh Ch.Saha at North side of old central jail under AMC ward no-23.
Construction work for Drain and CC road 1 from the H/O Babul Das to the H/O Subhana Das and 2 from the H/O Swapan Das to the H/O Dilip Das at Reshambagan under ward no.09, AMC
Mtc. of road from Siddhi Ashram Bazar to ho Subal Das and Railway station main road to ho Uttam Datta at Siddhi Ashram School Para SH Patch Soiling, Patch Mettaling, Recarpeting, Grouting and R.C.C Drain etc. during year 2023 24
Improvement of road starting from VIP road (Old rajbhavan_ circuit house) to GB bazar via Heritage park and shyamali Bazar _ SH_ DBM, BC, side shouldering, footpath, road side drain and other allied works (Length is 1000.00 m) under Scheme for Spec
Improvement of road starting from VIP road to the State highway (Salbagan to Khayerpur via Banikya Chowmuhani) via MLA Hostel and ILS Hospital_ SH_DBM, BC, side shouldering, footpath, road side drain and other allied works (Length is 1.30 km) under S
Mtc of different stretches at different roads within the AMC Ward no 51, under juridiction of Central VI SubDivision, during the year 2022 23. SH Patch soling, metalling, grouting, Carpetting and Seal coat inc Brick masonry Drain, RCC and allied wor
Mtc. of road from Champamura road to Balder Khal via East Aralia and also other roads under jurisdiction of Central VI subdivision during the year 2022-23 SH Patch soling, Patch Matelling, grouting, patch Carpetting, including Road side drain and ot
Improvement of Road portion from Post Office Chowmuhani to Netaji Chowmuhani under Central III Sub Division PWD(RandB) SH Construction of RCC Cover Drain along with Shoulder and Footpath on RHS of the Road from Post Office Chowmuhani to Netaji Chowmu
Improvement Strengthening Upgradation of various roads under Agartala Municipal Corporation area SH Road started from the Ho Sri Bidhu Bhusan Deb to near Steel Bridge at West Pratapgarh under AMC ward No. 33 RCC drain, Patch WBM, BM, Carpeting etc
Mtc of road from Kambaltilla to Anandabazar (L- 12.00Km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH GSB, Patch WBM-3, Patch Carpeting, Seal Coat and surface drain etc portion from Ch 0.00km to Ch 4.00 km.
Mtc of road from Kambaltilla to Anandabazar (L- 12.00Km) under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH GSB, Patch WBM-3, Patch Carpeting, Seal Coat and surface drain etc portion from Ch 4.00km to Ch 8.00 km.
FDR Maintenance of road during the year 202425 Maintenance of various road at Rabindranagar, Madhya pratapgarh and also other roads under jurisdiction of Central VI Subdivision, PWD R and B SH Construction of Road side RCC drain, Patch soling, Patc
Maintenance of Maharaj Ganja Bazar during the year 2022 2023 S.H Mtc. of connecting road of Gulbazar kirtan area to M.B.B. Club road by the way of Paver block, brick masonry drain etc. under the jurisdiction of Central III Sub Division
Mtc of Agartala town road during the year 2023 24 SH Maintenance of additional manhole cover over existing R.C.C. cover drain in different places of Agartala town area under the Jurisdiction of Central III Sub Division As an when required
FDR Mtc. of Agartala town road during the year 2024 25 SH Mtc. of Different roads under AMC Ward no 19 by soling, grouting and Patch reCarpeting, Seal coating, brick masonry drain etc. under the jurisdiction of Central III Sub Division
Maintance of Agartala town road during the year 2023 24 under the Judiriction of Central V Sub division SH Repair of Road by providing Grouting, Patch carpeting, Bituminious Macadam and Bituminious Concreat along with Drain Maintance of the road adja
Improvement of approach road 0f Babaji Vedanta Kriyayoga Dhyanashrama L 200.00 m from NH 08, under AMC ward 44, under Scheme for Special Assistance to States for Capital Investment for 2023 24 SH Construction of Covered drain, Retaining wall, Sol
Construction of C.C road and drain from House of Jantu Miah to House of Majul haque of Bitterban, Bhati Abhoynagar under AMC ward no_13 _SH_ Earth Work, Sand Filling, P.C.C, R.C.C work ,Brick Work, C.C work and other allied works.
Mtc. of A.D Nagar Road no.11 and Subhas pally at ward no.39 and other allied roads under Jurisdiction of Central VIII Subdivision, PWD RandB during the year 2024 25 SH Patch Soling, Patch WBM, Patch carpeting, drain etc
Maintance of Agartala town road during the year 2023 24 under the Judiriction of Central V Sub division SH Repair of Road by providing Grouting, Patch carpeting, Bituminious Macadam and Bituminious Concreat along with Drain Maintance of the road adja
FDR road from Amarpur TGB Bank to Mailak steel Girder Bridge approach under Amarpur Nagar Panchayat during the year 2024-25/ SH-Construction of RCC drain from Nikunja Barman house to Mailak RCC Bridge approach.Road marking and Road Furniture etc.
Road development work of road from KA Road near Kulai Baazar to KA Road at Basudebpara via Harinmara (Length-4.00 Km)/ SH- Protection work of Road by RCC retaining wall, CC Block, drain etc from chainage 2.10 Km to 4.00 Km.
PR Of Tlangsang Village Approach road ( Total Length 0.95 km and 0.24 Km ) under Jampui Hill Sub Division, PWD(R and B) during the year 2023 2024/SH WBM,Tack coat, re carpeting, seal coating, Pucca and Kacha drain etc.
Construction of R.C.C. Drain and R.C.C. Pavement Road and earth filling near the house of Kishan Kar to Kajal Dey at Manasha Lane, East Chandrapur, Ward No-25 and Ward No-20 within D.M.C. area, during the year 2024-2025.
Mtc. of road from Jatanbari to Lambacherra via Tirthamukh (Length- 20.50km) on the eve of Pous Sankranti Mela-2021 SH- Brick soling,Grouting, re-carpeting, sand seal coat, Removing of landslide, gunny bags placing, earthen drain etc. during the year
FDR/mtc. Of different roads under Amarpur Nagar Panchayat during the year 2025-26/ SH-Construction of RCC drain infront of PWD(RandB) Division and Shantipalli Sribash Saha house to Pradip Das house and Box culvert at Cremation road etc.
Maintenance of road from Gonda Twisa to Amarpur (Length- 17.50 km) under Gonda Twisa Sub-Division, PWD(RnB) during the year 2023-24/SH- Grouting, re-carpeting, surface drain etc. portion from ch. 12.00 km to 14.00 km (Group-I).
Maintenance of road from Kunja Behari to Rambazar via Basikobra road (L 3.20 km) during the year 2023 24 SH Patch grouting, re carpeting, sand seal coat, surface drain, remove of un suitable soil etc. (Road to be repairs 1.00 km).
Maintenance of Different Roads under the Jurisdiction of Lefunga R.D block area of Mohanpur Sub-Division, PWD (R and B) during the year 2022-23/SH- Patch Grouting, Patch WBM-3, Carpeting, Patch soling, Bamboo palasiding, Surface drain and Gunny Bags
Maintance of Agartala town road during the year 2023 24 under the Judiriction of Central V Sub division SH Repair of Road by providing Grouting, Patch carpeting, Bituminious Macadam and Bituminious Concreat along with Drain Maintance of the road adja
Const. of brick soling road H.O. BiswajitGhosh to H.O. ShriAbhijit Das at YubakSangha H.O. Pranab Paul to H.O. ShriShibu Deb mtc. of drain H.O. ShriRatan Deb to H.O. ShriSekhar Deb H.O. ShriUttam Paul to Lt. Sailendra Das at Bhattapukur W.40.
Construction of RCC drain started from i. H.O Seraj Miha to H.O Arun Saha ii H.O Debasih Saha to H.O Karmat Acharjee iii. H.O Amar Saha to Kamal Bhattacharjee iv. H.O Sataranjan to Sukula Biyadha, under ward no.11, AMC
Improvement of road from Lefunga Gamchakobra road to Kamalghat road via Devtabari School and Sampari Chowdhury para during the year 2025-26/SH GSB, WBM-II, WBM-III, carpeting, Drain, CD, Retaining wall and Earth filling etc.(L-1.70Km). (2nd Call)
Improvement of Road portion from Post Office Chowmuhani to Netaji Chowmuhani under Central III Sub Division PWD(RandB) SH Construction of RCC Cover Drain along with Shoulder and Footpath on LHS of the Road from Post Office Chowmuhani to Netaji Chowmu
Improvement of road from Rajnagar Panchayet office to Rajnagar School under Kumarghat RD Block L 1 1750 Km under PWD Rand B Division Kumarghat SH Widening GSB WBM 2 WBM 3 Carpeting Road side drain CD including protection work etc un
Construction work for 1.Drain from the H/O Shyamal Das at Najrul Colony.2.Brick soling from the H/O Satya Ranjan Saha at Bartilla. and3. from the H/O Rikta Chakraborty at Ajit Palli under ward no.29,AMC.
FDR Mtc. Of road from Krishnatali to Harijoy chowdhury para via Brajanagar under Jirania Sub Division PWD (R and B) during the year 2024-2025 SH Protection of Road embankment by providing C.C toe wall and construction of trapizoidal drain etc.
Maintenance of Bailey Bridges under the jurisdiction of Damcherra Sub-Division, PWD R and B during the year 2025 2026 SH Providing, fitting and fixing of spare parts inc welding ,Land slide clearance,bamboo palasiding,and unlined surface drain etc.
Mtc.of different road within AMC ward No 30 during the year 2021 22 namely Ambedkar coloney, Vidyasagar RCC bridge to Rebati Das Trijunction via Katashwela etc. SH Patch soling, Matelling, grouting, Carpetting, inc Road side drain and other allied wo
Development of road from NH 108 to Polestar Club via Manipuri para L 1.40 K.M. from Ch. 0.00 M to 600.00 m under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM, PMC, Seal Coat, Drain etc. Gr 1
Development Of road from NH 08 Pecharthal to Shilcherra Bidharshan road L 5 25 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface drain Patch Metalling Patch Carpeting Sea
Development of road from NH 108 to Polestar Club via Manipuri para L 1.40 K.M. from Ch. 600.00 M to 1400.00 m under PWD RandB Khowai Subdivision during the year 2026 27 SH WBM PMC Seal Coat Drain etc. Gr 2
Development Of road from NH 08 Pecharthal to Shilcherra Bidharshan road L 5 25 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface drain Patch Metalling Patch Carpeting Sea
Development Of road from NH 08 Pecharthal to Shilcherra Bidharshan road L 5 25 Km during the Financial year 2026 27 Under the Scheme for Special Assistance to States for Capital Investment SH Surface drain Patch Metalling Patch Carpeting Seal
Development of black top road from Tulabagan Chowmuhani (NH-108B) to Dhigalia-Abhicharan road via officetilla (L-5.00 km) (Ch-0.00 to Ch- 1.350 km)during the year 2026-27/SH Grouting,Carpeting,Tack Coat, Seal Coat,Surface drain,etc.
CONSTRUCTION OF PAVER BLOCK ROAD and DRAIN FROM GANKI POST OFFICE TO THE SHIBU ROY CHOUDHURY VIA THE HOUSE OF MANTU BHOWMIK UNDER WARD NUMBER 15 KMC KHOWAI DURING THE YEAR 2024 25. ROAD LENGTH 70.00 M and WIDTH 2.50 M