Loading…
Loading…
4,359 results • Best match
Overhauling of 11KV Breaker and LT panel with allied works at DPS-IIIC, AA-III under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at DPS-IB, AA-I under NTK Project.
Overhauling of 11V Breaker and LT panel with allied works at DPS-IIIB, AA-III under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-I, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-III, AA-IIIB under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-IV, AA-I under NTK Project.
Overhauling of 33KV Breaker and LT panel with allied works at BS-I, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-III, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at DPS-IIIB, AA-III under NTK Project.
Overhauling of 33KV Breaker and LT panel with allied works at DPS-IC, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-I, AA-IIIA under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-II, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at DPS-IB, AA-I under NTK Project.
Overhauling of 33KV Breaker and LT panel with allied works at BS-I, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at STP-IIID, AA-III under NTK Project.
REPAIR/MAINT OF LT PANEL AND STREET LIGHTS AND ALLIED WORKS AT CH (EC) UNDER GE ALIPORE KOLKATA
Overhauling of 11KV Breaker and LT panel with allied works at SLS-VI, AA-IIIE under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-VI, AA-I under NTK Project.
Replacement of old LT panel boards and Distribution BDBs at Academy Building under jurisdiction of NRSMCH Internal Electrification
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-IV, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at DPS, IIID (Akanda Keshori) under NTK Project.
Overhauling of 33KV Breaker and LT panel with allied works at DPS-IC, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-I, AA-IIIA under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-VI, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-IV, AA-IIIC under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-VI, AA-IIIE under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-III, AA-I under NTK Project.
STRENGTHENING OF ELECTRICAL POWER SUPPLY TO LT PANEL INSTALLED AT SLUDGE SUMP-1 OF JAI HIND JAL PRAKALPA.
SUPPLY, DELIVERY AND ERECTION OF MS FABRICATED SHED OVER LT PANEL BOARD INSTALLED ON CWR AT PATULI BPS.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-III, AA-IIIB under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-V, AA-IIIF under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-V, AA-I under NTK Project.
Overhauling of 11V Breaker and LT panel with allied works at ISLS-VI, AA-IIIE under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at SLS-IV, AA-IIIC under NTK Project.
REPAIR/MAINT OF LT PANEL AND STREET LIGHTS AND ALLIED WORKS AT CH (EC) UNDER GE ALIPORE KOLKATA
Overhauling of 33KV Breaker and LT panel with allied works at BS-I, AA-I under NTK Project.
Overhauling of 11KV Breaker and LT panel with allied works at ISLS-VI, AA-I under NTK Project.
Overhauling of 11V Breaker and LT panel with allied works at ISLS-V, AA-I under NTK Project.
Ten pillars extension of 6.6kV grade 95sq.mm, PVCDWA cable, 3.3kV grade 70sq.mm. PVCDWA cable with 55OV ACB , drill panel, 3inch spray pipeline with manifold N endless haulage return pulley with 19mm rope for development of trunk-panel-T3 in R-VIIA
Extension of 6.6kV 70sq.mm grade cable, 3.3kV 70 sq.mm grade cable with 550V ACB and drill panel and 3 in dia. spray pipeline with manifold for development of panel-8 in R-VIIA by LHCM-1 at 3n4 Incline, J.P.Colly
COMPLETE REPAIRING and OVERHAULING OF (A) 65KW MINE LINE MAKE GATE END BOX AT 6NO. NEW SECTION, (B) 100AMPS 550VOLT REYROLLE BURNMAKE IGA-4 ACB AT 5 NO PIT SECTION HAULAGE AT MANDERBONI UNIT OF MSAM COLLIERY UNDER PANDAVESWAR AREA
1. Repairing and overhauling of 300Amps 550Volt Andrewyule make SNo FLPCB52 19 ACB Switch and 2. Complete repairing and rewinding of Bharat Bijlee make 15KW 20HP 550 Volt 2900 RPM Auxiliary fan motor of Nakrakonda Kumardihi B Colliery under Bankola
Complete repairing and rewinding of 75KW 100HP Marathon Electric make 1480RPM 550Volt motor (B) Complete rewinding of ABC make 2.5 KV 110Volt Drill panel and (C) complete repairing and overhauling of ABC make 400Amps ACB switch and (A) Complete rep
Transportation, laying, extension, pulling, handling, hanging of approx. 750mtr 95 sqmm PVCDWA cable and approx. 750mtr 70sqmm PVCDWA cable with 550V ACB and drill panel from 1L/2XD to 27L/2XD at 3 and 4 Incline, JPC as per NIT
Transportation laying fitting extension of 54 nos. or 324 mtr. 4in dia. spray pipeline with manifold after flange fitting welding on these pipes and transportation laying extension of 6.6KV grade cable, 3.3 KV grade cable with 550V cable ACB and Dril
Operation AND Supervision of wall mounted Control panel along with its accessories at Gouripada Mukherjee Lane DPS.
Operation and Supervision of wall mounted Control Panel along with its accessories at Gouripada Mukherjee Lane DPS
7.5/15/15 Kw Control Panel Items for Anchor Capstan of SVL project of YD-3025-28.
Operation and Supervision of wall mounted Control Panel along with its accessories at Madhusudan Biswas Lane DPS
Operation AND Supervision of wall mounted Control panel along with its accessories at Madhusudan Biswas Lane DPS.