Loading…
Loading…
631 results • Best match
10 KLD Packaged Effluent Treatment Plant (ETP) (Q3)
10 KLD Packaged Effluent Treatment Plant ETP (Q3)
EFFLUENT TREATMENT PLANT
EFFLUENT TREATMENT PLANT (Q3)
Sewage/Effluent Treatment Plant (Q3)
Sewage/Effluent Treatment Plant (Q3)
Sewage/Effluent Treatment Plant (Q3)
Sewage/Effluent Treatment Plant (Q3)
SPARES FOR EFFLUENT TREATMENT PLANT (Q3)
EFFLUENT TREATMENT PLANT (Q3) (3 (3 ))
Provision of 20 KLD Effluent treatment plant (ETP) at Hospital in MCF/RBL.
Provision of 20 KLD Effluent Treatment Plant (ETP) at hospital in MCF/RBL
Annual operation and maintenance contract for Effluent Treatment Plant (ETP) for period of Two yea
DE-WATERING POLY ELECTROLYTE FOR EFFLUENT TREATMENT PLANT (Q3)
Construction of New 33 kV U/G Line from Primary Substation 132/33 kV Krishna Nagar, for releasing New Connection of 5.5 MVA to 20 MLD Capacity Common Effluent Treatment Plant (CETP), under EUDD-Jajmau, Kesco, Kanpur (Turn-Key Basis)
Procurement of Dolomite Lime for Effluent Treatment Plant 1x660MW, HTPS, Kasimpur
Custom Bid for Services - TPI Automation Trial of Effluent Treatment Plant
SUPPLY, INSTALLATION, ERECTION, TESTING AND COMMISSIONING OF 10 KLD EFFLUENT TREATMENT PLANT AT INDANE BOTTLING PLANT, VARANASI, UTTER PRADESH
Annual Operation and Maintenance of industrial Effluent Treatment Plant at Bina Project
Round the clock operation and routine maintenance of Effluent Treatment Plant and Breakdown maintenance servicing of chlorination plant effluent treatment plant and hoist cranes installed at BOP area 2x250MW PTPP Parichha
Round the clock operation and routine maintenance of Effluent Treatment Plant and Breakdown maintenance /servicing of chlorination plant, effluent treatment plant and hoist cranes installed at BOP area 2x250MW, PTPP Parichha.
Work no 3 Design Build Suplly Installation Testing and Commissioning along with 10 Years of Opreation And maintence Of Sewage treatment Plant 660 KLD And Common Effluent Treatment Plant 2150 KLD on suitable and proven Technology
Sewage/Effluent Treatment Plant (Q3) MSE Exemption for Years of Experience and Turnover
Operation and Maintenance of Effluent Treatment Plant at Kakri Area for 365 days.
Operation and maintenance of effluent treatment plant at Kakri Project for 730 days.
Operation and maintenance of Effluent Treatment Plant at Kakri Project for 730 days
PROVISION OF EFFLUENT TREATMENT PLANT CUM SEWAGE TREATMENT PLANT AT CENTRAL COMMAND HOSPITAL LUCKNOW
Operation of Effluent treatment plant at Krisnashila Project. (For a period of two years)
Custom Bid for Services - OPERATION AND MAINTENACE OF ETP EFFLUENT TREATMENT PLANT & STP SEWAGE TREATMENT PLANT Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Annual Operation and Maintenance of Industrial Effluent Treatment Plant for one year at Bina Project
Annual Operation and Maintenance of Industrial Effluent Treatment Plant for Two year at Bina Project.
Operation and maintenance of Effluent treatment plant at Krishnashila Project. (For a period of two years)
Round the clock operation and routine maintenance of Effluent Treatment Plant installed at 2x250MW, PTPP, Parichha
Round the clock operation and routine maintenance of Effluent Treatment Plant installed at 2x250MW, PTPP, Parichha
Design, Manufacture, Supply, Installation, Commissioning and Prove out of Prefabricated Effluent Treatment Plant (ETP) of 75,000 liters per day (LPD) capacity to treat the waste water (effluent). Tech
Custom Bid for Services - 9050C25C02 for Consultancy job for improving Operations of the Effluent Treatment Plant ETP at IOCL Similar Category Operation and Maintenance of Effluent/Sewage Treatment Plant
Design,Supply, Installation, Testing and Commissioning of Effluent Treatment Plant of capacity 5 KL/day at Farrukhabad BP
Round the clock operation and annual maintenance work of effluent treatment plant of Obra Thermal Power Station Obra.
Supply ,Installation and commissioning of 30 KLD Effluent Treatment plant. Make-GOOD EARTH CHEMICALS PVT. LTD or similar.
Complete Operation of Pre Treatment plant (PT Plant) , Effluent Treatment plant (ETP Plant) along with their routine checking and their breakdown maintenance of 2X210 MW, PTPP, Parichha
Dosing Pump for Effluent Treatment Plant zero to ten LPH, Chemical Dosing Tank hundred Ltr Capacity, Multimeter Sand Filter fourteen inch into sixty five inch, Activated Carbon Filter fourteen inch into sixty five inch, Micron Filter two thousand Ltrs Hour, Flow Meter, Interconnecting Pipe PVC and Accessories, Poly, Allum, Lime and Caustic, Tube Media, Air Blower, Multi Port Valve
work of Round the clock operation and annual maintenance work of effluent treatment plant of Obra Thermal Power Station.
Operation and maintenance of Effluent treatment plant and other miscella-neous works at Dudhichua Project for a period of 2 years.
Approval for calling limited tender for design installation testing commissioning of Effluent Treatment Plant and tender documents at Lakhimpur Kheri BP
Provision of sewage cum effluent treatment plant (ETP) of 100 KLD capacity with other ancillary civil work with 03(Three) years operation and maintenance for treatment waste water generation from Pit
Overhauling of chlorination plant, effluent treatment plant and hoist cranes with their associated system during overhauling of Unit 6 2x250MW, PTPP Parichha.
PROCUREMENT AND INSTALLATION OF EFFLUENT TREATMENT PLANT CAP. 7.5 K LTRS/DAY 01 NO. DETAILED SPECIFICATION IS ATTACHED AS PER ANNEX-A
Provision of Sewage cum effluent Treatment Plant (ETP) 100 KLD Capacity with other ancilliary Civil Works with 3 years operation at NTSK as per attached Annexure A. B, C, D & Drawing Make: Self
WATCHEM IONS ENGINEERS PRIVATE LIMITED Mild Steel Single Tank, WATCHEM IONS ENGINEERS PRIVATE LIMITED Mild Steel Single Tank Sewage/Effluent Treatment Plant 1 year
Routine Breakdown maintenance and Fault rectification work of C AND I equipments of 5X200 MW BTPS Ash Water Recirculation System and Effluent Treatment Plant