Loading…
Loading…
8,324 results • Best match
Temporary arrangement for Illumination, PA System and DG Set for Bus Buffer Zone at Pailan Education Park, Bishnupur-I in connection with Gangasagar Mela-2023 for 12 days
Providing Octonal on hire basis along with all accessories for distribution of Packaged Drinking Water Pouches at Kachuberia and adjacent area in connection with Gangs Sagar Mela 2026
Construction of cc drain from Anil Loharer house to Kirtan mela near Babu Duttar house , Mouza-Patrasayer, under Patrasayer GP under Patrasayer Panchayat Samity under CFC-BG Fund
UPGRADATION OF RURAL ROAD WITH CEMENT CONCRETE FROM MANABENDRA DEY HOUSE TOWARDS MAJHIPARA MANSASTHAN VIA SWARASWATI MELA (250 FOOT) AT UTTARPARA UNDER MEDINIPUR GP,WITHIN ONDA DEVELOPMENT BLOCK.
Designing of Existing 02 no. of Tableau Vehicle in Connection with Van Mahotsav 2025
INSTALLATION OF CCTV CAMERA AT BHOLSAR MAHOTSAV TALA, BAGNAN-I BLOCK, HOWRAH UNDER BEUP
Brick Soling at different Hogla shed for Police barrack and etc. in Connection with Gangasagar Mela -2024 under Kakdwip Panchayat Samity, South 24-Parganas.
Repairing of Bituminous roads by patching potholes and depressions on different roads at AA I under NKDA for upcoming Saradia Festival.
Construction of Construction of Temporary Hogla shed for Kakdwip Railway Station Point in Connection with Gangasagar Mela -2024 under Kakdwip Panchayat Samity, South 24-Parganas.
SUPPLY OF MATERIALS FOR CONSTRUCTION OF PCC ROAD FROM NETAI GANGA MELA TO NETAI PUMP HOUSE AT NETAI IN LALGARH GP UNDER BINPUR-I PANCHAYAT SAMITI
Temporary erection of bamboo barricades and drop gates in connection with Durga Puja festival 2023 and protection to immersion ghat at Jalpaiguri PS Maynaguri PS and Rajganj PS
Supplying and arrangement of following items for Chat Puja Festival at Purnia Talaw in the year of 2024 within Ward No. 80, Borough-VII under Asansol Municipal Corporation.
Construction of shed for festival at Side of Sanjoy Dutta house near Burima and Kalitala at Meral Village at Indas II Gram Panchayat fund of APAS 2025 year
Supplying and arrangement of following items for Chat Puja Festival at Sitla Pond in the year of 2024 within Ward No. 21, Borough-V under Asansol Municipal Corporation.
Improvement at river side and approach road with materials for cleaning the ghat for Durgapuja festival at Sadarghat and Babupara ghat in ward no 13, under E.B.M, Malda
Supplying and arranging the following items for the Chhath Puja Festival at Sitla Pond in the year 2025, within Ward No. 21, Borough-V, under Asansol Municipal Corporation.
Supplying and arrangement of following items for Chat Puja Festival at Hadla Pukur in the year of 2024 within Ward No. 75, Borough-VII under Asansol Municipal Corporation.
Supplying fitting fixing of LED tiny bulb of different Color , Temporary Halogen lights at different Qubristhan for the festival of SHAB-E-BARAT-2023, Under Asansol Municipal Corporation
Emargency road repair for Puja Festival from Axis Bank, Raghunathganj to Raghunathganj OLD Boys School at Raghunathganj Main Road in ward no - 20 and 17 within Jangipur Municipality.
SL-43 SHADE AREA FOR FESTIVAL 163 NO PURBA PARA. 163 - Dhamakhali F.P.School under Sandeshkhali-II Development Block. Fund- APAS. Scheme Id no- APAS/01/123/163/0001
Supplying and arranging the following items for the Chhath Puja Festival at Sitla Pond in the year 2026 at Ward No. 21, Borough-V, under Asansol Municipal Corporation.
Temporary Road restoration of different lanes and by lanes of Bakshirhat GP in-connection with Augmentation of Mankur Deulgram PWSS of Bagnan-I Block for peaceful celebration of different festival under Uluberia Sub-Division under Howrah Division.
Erection of temporary pandal and platform for parents and participants Block, Block-F, toilet block and erection of barricading and bunker shed at different places within Kolkata Maidan area on the occasion of 15th August Independence Day Celebration
Erection of temporary pandal and platform for parents and participants Block, Block-F, toilet block and erection of barricading and bunker shed at different places within Kolkata Maidan area on the occasion of 15th August Independence Day Celebration
Jungle Clearance, Cleaning of the Pavilion and other Miscellaneous works and Spreading of sand at the ground and rolling the same for 78th Independence Day Celebration at Gorkha Stadium, Lebong, Darjeeling GTA 2024 (PART C and PART- D)
Construction, errection and installation of different type of temporary structure such as stall etc. at Ramananda Mancha Ground in c/w 36th Bishnupur Mela-2023.
Hiring of Desktop, Laptop, Printer and its peripherals for Milan Utsav 2023.
Engagement of Event Management Agency for Designing and Implementing the Event part of Tele Academy Award Ceremony 2019
Engagement of Event Management Agency for City Branding of 31st KIFF at different Places in and around Kolkata
Engagement of Event Management Agency for City Branding of 29th KIFF at different Places in and around Kolkata
The work related to engagement of an Event Management Agency for organizing the programme related to Anurodher Asar2024
Ganga Sagar Social Media 2026
Floor Tiles, Outside Wall Tiles and Wall Paneling Work of Underpass Near Milanmela and Energy Education Park.
Ganga Sagar Sankirtan Prabachan 2026
Ganga Sagar 2026 Video Documentary
6. Construction of road in between Milanmela and ITC Sonar Bangla (Proposed).
Sheet piling -U-Type along with allied works behind Milanmela.
2. Restoration of Milanmela service road beside GD2 to GD10 (Modified)
Sagar Arati 2026
Ganga Sagar 2026 Still Photography
Setting up of various temporary structures for office, accomodation, erection of K.Oil Shop, M.R. Shop, watch tower etc. at BUS STAND - 1 for Gangasagar Mela - 2026 at Namkhana Point
Repairing of road from h/o Farida Banu to Ananda Mela School at Gangabag Tikiyatuli in ward no 11 within Englishbazar Municipality, Malda Under APAS Scheme, part no-183.
SETTING UP OF TWO WAY VOICE TRANSMISSION SYSTEM USING VHF RADIO TECHNOLOGY THROUGH HAND HELD RADIO (WALKIE TALKIE) AND REPEATER DURING SAGAR MELA 2022 COVERING 50 KM RADIAL DISTANCE
Temporary arrangement for Illumination, PA System and DG Set for accomodation of Police at 6 (six) no. locations at Kulpi in connection with Gangasagar Mela-2023 for 9 days
Construction of Temporary Hogla shed for gents Police (for advance party) at Lot No. 8 point in Connection with Gangasagar Mela - 2026 under Kakdwip Panchayat Samity, South 24-Parganas
Erection of temporary structure of Stage, Truss, Other Pandal and Decoration in connection with Shristishree Mela 2023-24 from 19.01.2024 to 25.01.2024 at Durgapur Hut Near Disha Hospital, Durgapur.
SUPPLY OF MOORING CHAINS AND ANCHORS ON HIRE BASIS FOR PLACEMENT OF 07 NOS. SEMI-PEMANENT JETTIES AT LOT-8 AND KACHUBERIA IN CONNECTION WITH GANGA SAGAR MELA 2023.
Installation of Solar Light 12W and 1800 Lumens Stand Along LED Semi Integrated Solar System NEAR PANCHAMI MELA at Kanko Village within Kanko G.P. under Binpur-II Development Block
Temporary arrangement for Road Illumination Zone-A 3 nos. locations from Konchowike Dumpyard Water Tank to Saheb Dhaba Gangarampur in connection with Ganga Sagar Mela-2026 for 9 days.
INSTALLATION OF SOLAR LIGHT AT BARABONA NEAR MANSA MELA MOUZA GORA JL NO 254 PLOT UNDER METYALA GP UNDER CHHATNA PANCHAYAT SAMITY UNDER 15th FC FUND DURING 2022 - 23