Loading…
Loading…
6,731 results • Best match
(1) MAKING OF 04 NOS. OF MOTOR DALA END COVER AND 04 NOS.BEARING GREASE CAP OF AT AKWMC FOR 150HP AND 167 HP.(2) FABRICATION OF BASE PLATE H.T PUMP MOTOR TO BE INSTALLED AT OCP PUMP.(3) DISMANTLING OF 3000 GPM PUMP FLOW MORE 3000 GPM PUMP SET FLOW M
Fabrication and erection of new HR gates at outlets exit from OR-45, OR-46, OR-48, OR-49A, OR-49B, OR-49C and R/m of 02 nos. of ER gate, 24 nos. of HR gate, 19 nos. of turnout HR gates of sardiha subdistributory of CLMC with five year
Fabrication and erection of receiving chute rodent (1300 mm x 30 mm) 05 nos., plate (2 mtr x 700 mm x 16 mm) of 267 belt conveyor and tail drum repair by plate (600 mm x 1200 mm x 6 mm) of 248 B/C in HMS Section of Kathara Washery
Fabrication and erection of Suction pipe 200 mm (60 m), Nozzle 200 mm (04 nos.), Pipe bends of 200 mm (30 m) along with fitting of drain/plug valve 4 inch (11 nos.), Plug valve 10 inch (4 nos.), gate valve 10 inch (4 nos.) and Flange making and fitti
Fabrication and erection of 200 mm pipe in unit no. 42, 300 mm pipe in unit no. 51 and Y change, 200 mm suction pipe in unit no. 39, 40 in gallery section-1 after dismantling old damaged pipe and changing of reducer in pump 51 250 mm pipe changing at
Dismantling of unused 28 span of 440 V, 3 phase, 4 wire O/H line from SILO/RLS to 20 MW Solar power plant construction site with fabrication and fixing of 02 nos. tubular pole make lighting tower and some related 440 V O/H line work at Bahera DURGA M
1. Repairing of the broken portion of the bucket door assly. 2. Broken portion door gousing and welding by steel electrode. 3. Lock bar and lock bar pin repairing. 4. Door hinges broken portion gousing and welding by steel electrode.
1. The damage structure of the all four side of the cabin straightening. Rusted portion of structure cutting and new M.S.Sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Damage blade arm broken plate cutting in side lower and upper size- 12x4 2. New plate cutting setting and welding in side lower and upper plate. 3. Pin hole oval worn out portion welding building buildup as per size
a. Front damage plate cutting size 4x12. b. New plate welding in place of damage plate by steel and low hydrogen electrode. c. Front ribs new plate bending shaping and welding size 6x5. d. Blade lower portion development with plate for
1) The damage structure of all four side of the cabin straightening, rusted portion of structure cutting and new M.5.sheet changing by welding. 2) The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Front damage plate cutting size 4x12. 2. New plate welding in place of damage plate by steel and low hydrogen electrode. 3. Front ribs new plate bending shaping and welding size 6x5. 4. Blade lower portion development with plate
1. Repairing of broken portion of the bucket door assly. 2. Broken portion door gousing and welding by steel electrode. 3. Lock bar and lock pin repairing. 4. Door hinges broken portion gousing and welding by steel electrode. 5. New bush
1. The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
Repairing of bucket assy., Center bearing oval eye (both lower n upper) by material depositing n line boring as per bearing size n bearing fitting work and rep./welding of 08 nos. tooth point and repairing, straightening, denting n welding of
1.Repairing of the broken portion of the bucket door assly 2. Broken portion door gousing and welding by steel electrode 3. Lock bar and lock bar pin repairing 4.Door hinges broken portion gousing and welding by steel electrode
Repairing and reinforcement of broken eye of bucket and repairing of bucket body by welding and reinforcement of bucket body by welding of metal piece as float bucket for BE1000 Hydraulic Shovel SL.No. G10079/S-389 of Rajapur OCP, Bastacolla Area
1. The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Front damage Plate Cutting Size 4 feet x 12 inch. 2. New Plate Welding in place of damage Plate by steel AND Low Hyd. 3. Electrode. Front ribs now plate bending shaping and Welding size 6 inch x 5 feet.
Repairing of blade cutting edge and end bit broken hole and worn out portion replacement by gas set and resetting and steel electrodes depositing welding and grinding and hole making and supporting welding and HT bolt, nut with washer providing 35
1) The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S. sheet changing by welding. 2) The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. The damage structure of the all four side of the cabin straightening noted portion of structure cutting and new M.S. sheet changing by welding. 2. The structure of roof of the cabin rushed portion cutting new sheet changing welding.
1) The damage structure of the all four side of the cabin straightening. Rusted portion of structure cutting and new M.S. Sheet changing by welding. 2) The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Heating of the housing of the final drive for burning the oil and grease before welding of the worn out potion for the boring. 2. Welding of the worn out housing of the busing part no-1004-19-57
1. The damage structure of all four side of the cabin straightening, rusted portion of structure cutting and new M.S sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1) The damage structure of the all four side of the cabine straightening, rusted portion of structure cutting and new M.S. sheet changing by welding. 2). The structure of roof of the cabin rusted portion cutting new sheet changing try welding.
1. The damage structure of the all four side of the cabin strengthening rusted portion of structure cutting and new M.S. sheet changing by welding. 2. The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Damage blade arm broken plate cutting in side lower and upper side -12x4 2. New plate cutting, setting and welding in side lower and upper plate. 3. Pin hole oval worn out portion welding build up as per size.
1. Heating of the housing of the final drive for burning the oil and grease before welding of the worn out portion for the boring. 2. Welding of the worn out housing of the bushing part no-1004-19-57
1. Front damage plate cutting size-4 ft x12 ft. 2. New plate welding in place of damage plate by steel and low hyd. Electrode. 3. Front ribs new plate bending shaping and welding size-6 inch x 5 ft.
1) The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S. sheet changing by welding. 2) The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Boom broken portion gousing V making and alignment. 2. Two nos. box making inside the portion of boom. 3. Required plate cutting from grounded shovel. 4. Plate cutting as per required plate welding alignment box making. 5. Root welding
1. Repairing of the broken portion of the bucket door assly. 2. Broken portion door gousing and welding by steel electrode. 3. Lock bar and lock bar pin repairing. 4. Door hinges broken portion gousing and welding by steel electrode.
1. The damage structure of all four sides of the cabin straightening rusted portion of structure cutting and new M.S. sheet changing by welding. 2. The structure of the roof of the cabin rusted portion cutting new sheet changing by welding.
1) The damage structure of the all four side of the cabin straightening, rusted portion of structure Cutting and new M.S. sheet changing by welding. 2) The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1. Heating of the housing of the final drive for burning the oil and grease before welding of the worn out potion for the boring. 2. Welding of the worn out housing of the busing part no-1004-19-57
1. Damage blade arm broken plate cutting in side lower and upper side-12x4 2. New plate cutting, setting and welding in side lower and upper plate 3. Pin hole oval worn out portion welding build up as per size
1. Arm end lower and upper side damage plate cutting and plate welding. 2. Boom end (left side) damage plate cutting and plate welding. 3. Damage portion plate cutting by gas. 4. Plate cutting from grounded machine. 5. Plate setting
1) The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S sheet changing by welding. 2) The structure of roof of the cabin rusted portion cutting new sheet changing by welding.
1) The damage structure of the all four side of the cabin straightening, rusted portion of structure cutting and new M.S sheet changing by welding 2) The structure of roof off the cabin rusted portion cutting new sheet changing by welding
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Pipelines, A Repairing of 02 set Impeller welding machining of 4000 GPM 10UPH 8 Pump and b repairing of 04 Nos Neck ring outer welding machining of HT Pump ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Pipelines, A Repairing of 02 Sets impleller welding machning of willo HT pump b repairing of 04 nos neck ring outer inner welding machining of willo HT pumps..
A. 1. Reinforcement of bucket assly. B. Fabrication and repairing of broken lock bar keeper plate which include. 1. Fresh lock keeper plate fabrication as per size. C. 1. Bucket oval holes rebuilding and bush fitting.
Sheel Cellular Foam 6, Plywood for General Purpose, Steel Plate Carbon 2500x1250, Electric Welding Rod, Red Anabond
Propeller Shaft Complete Dismantling, Fitting. 2 Sets. Propeller Shaft Teeth and Yoke Cutting, Welding Fitting. 2 Nos.
1.Complete Bumper damaged cutting, denting, welding, repairing, removing, fitting. 2.Steering pump removing and changing, Fitting.
(i) Bottom dump cylinder body assly. dismantle. (ii) Piston rod eye welding. (iii) Cylinder body housing polishing.
1. Gouging of cracked bare tower. 2. V joint bead welding on cracked portion by steel electrode.
GAUGINGELECTRODE 4MM, 450MM, CHMFER, ELECTROD MEDIO CARB 7018, 4MM, ELECTRODE DUROCHROME ESAB 4MM, ROD WELDING 4MM, CI