Providing Trf Plinth foundation,cable duct abd allied civil works ,Fabrication and erection of structures and allied SS Erection works for Enhn. of Pr Trf 1x8 MVA to 2x8 MVA at Arakonam (RAPDRP) 33/11 KV SS in Vellore EDC.
Fabrication of Transformer and Pillar Boxes view cutter with MS square channel and sheet, foldable both side and sheet to be painted with Singara Chennai 2.0 logo at DR,Thomas Road TNUHD TENEMENTS in Division-117,Unit 26, Zone 9
MTPS I BM UNIT I Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of wornout buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works
Labour charges for foundation, fabrication and erection of all equipments and earthing of equipment supply of MS materials for introduction of 110 / 33 KV ratio with 1 16 MVA Power Transformer at Singampunary 110/11 KV SS in Sivaganagai EDC
Supply, Fabrication, galvanizing, erection of Pr. Tr. Gantry ,earth pit ,cable duct, plinths, and Road work for enhance. of 33/11KV existing Pr Tr capacity and introduction of LV breakers in the existing 33/11KV Thachampattu SS in TVMalai EDC
Supply, Fabrication and erection of RS Joist, MS Channel, MS plate, MS flats and MS Rod, erection of structures, earth mat and earth raisers, erection of 110KV Equipments, etc, 110 KV Portion for establishment of 230KVSS at existing vembakkam 110kvss
NCTPS I SEMII Circle AHP Dn Unit III Modification of existing chute arrangements by Design Supply Fabrication and erection of Y Chute arrangements with necessary accessories to connect to PDFAC vessel and Wet sluicing Mixing Box of UnitIII 3rd Row
AHP Dn PDFAC System Installation and commissioning of Air cooled Screw compressor FS CURTIS make 1483 CFM and Fabrication erection of Hot air duct for compressors at Surge hopper Unit II ESP Unit III ESP PLC s Rooms at NCTPS I
NCTPS I SEM II Circle AHP Dn Unit II Modification of existing chute arrangements by Design Supply Fabrication and Erection of Y Chute arrangements with necessary accessories to connect to PDFAC vessel and Wet sluicing Mixing Box in 3rd Row
EM I 250MVA 15.75kV 230kV Three phase Generator Transformer Arresting oil leak in the flanges of LV turret and bell mouth Radiator oil leak arresting fabrication of new stainless steel LV turret SS 316 L for rectification of eddy current issue
NCTPS I SE M II Circle AHP Dn Unit II Modification of existing chute arrangements by Design, Supply, Fabrication and Erection of Y Chute arrangements with necessary accessories to connect to PDFAC vessel and Wet sluicing Mixing Box in 2nd Row
Design, Fabrication, Erection and Commissioning of Sodium Hypo Chlorite Dosing System for 9 Nos. LLRS at TIMBER POND East and West, I SECTION North and South, H WAREHOUSE, M2, OH, CISF BARRACKS (South) and TV Quarters of Chennai Port Authority.
TTPS Mech II AHP Dismantling the existing wornout MS Grill in ash slurry sump and wornout handrails in trench spindle wheel gate assembly fabrication of hand rails supports erection and painting of MS Grill in ash slurry sump 4B 5A 5B
MTPS I MP AC Plant Providing additional air diffusers and return air grills in air conditioning main air duct and fabrication and erection of new duct connected with existing main air duct for FSSS DCS room in Unit II etc
Work Contract for Transportation and erection of breakers,drawal and laying of33kV and 11KV,1x630sqmm XLPE,Fabrication of 33kV and 11kV Adaptor panel and earthing arrangements towards enhancement of 33/11 kV PrTr capacity from 3x16 MVA into 4x16 MVA
NCTPS I SE M II Circle AHP Dn Unit I Modification of existing chute arrangements by Design Supply Fabrication and Erection of Y Chute arrangements with necessary accessories to connect to PDFAC vessel and Wet sluicing Mixing Box in 2nd Row
Work Contract for Supply, fabrication sand blasting with zinc painting of RSJoist, MS Channels, MS Plate, MS Angle supply of MS Flats, MS Rod erection of structure, earth bore earth mat earth raisers,erection of 33KV BKR,CT, AB Switches ,LA
MTPS I Mill Plant Unit III Fabrication of various length of 40 dia NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A to 3F and Dismantling of seal air fan motor and overhauling reassembling
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 11 10 to suit 508 mm 12 7 mm thick coal pipe line during COH 2024 25
TTPS Operation Circle OE II FPS Fabrication, erection and commissioning of A1/2 impulse line with control valve for fixing of pressure gauge at various location in fire hydrant line and fixing of pressure switches at Mulsifyre line including supply
Replacement of Existing 110 KV Busbar protection panel by new panel, Laying of 1000 meters 8core 2.5 Sq. mm armoured copper current transformer cable, 250meters 12core 1.5 Sq.mm Feedback Cable, Core cutting and Fabrication of panel bed frame etc., in
MTPS I Mill Plant Unit II Dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2A to 2F and Fabrication of various lengths of 40 NB cooling water pipe flange and assembling in the 2A
MTPS I BM UNIT III Boiler pressure parts AOH 2025 Rectification of buck stay beam and supports renewal of wornout buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works
Providing Foundation concerete for various structural and equipment plinth-supply-fabrication and eretion of steel materials for Re-engineering and modification work for dual 110 KV source for GC breaker of110/22 KV non grid SS at Tuticorin Auto SS
TTPS Operation Circle MPM II ACP Fabrication and Erection of blower casing front cover at Unit V Air Washer blower A and B and erection of grill platform at front side of the electrical panel of Unit V Air Washer.
TTPS Operation Circle MPM I Unit III Reconditioning of mill bottom, mill bottom cover, upper, bearing housing, air seal housing machining and also fabrication of 6 flanges for mill bottom cover, machining worm shaft radial bearing housing of unit et
BEARING HOUSING FOR BENDING ROLL, FINGER CLAMP FOR WELDING M/C
SITC OF LASER WELDING MACHINE WITH ALL ACCESSORIES AND ALLIED ITEMS
TTPSMIIAHP Unit IV V BAH ECO APH BD maint HDPE pipes various size from 32mm to 450mm welding punctured joint new joints dismantling reerection HDPE pipe old new rubber lining MS pipe various size 80 NB to 450 NB and flushing apparatus from 010423to31
NCTPS I Operation Circle CA Dn DM and RO Plant Attending to preventive and breakdown maintenance works in DM Plant and RO Plant such as welding overhauling of pumps etc for the period of one year from the date of handing over of site
Sp. 116 NCTPS II ES circle EM II S.Dn II Routine Maintenance of Power Supply arrangements of Stage II Employees Quarters at Vallur Camp and Temporary and Welding power Supply of NCTPS II For a period up to 31.03.2025 from the date of taking over
TTPS Operation Circle CAD Unit IV Dismantling patch welding of punctured portion and re erection of 1No 450NB suction bend with pressure impulse line in sea water booster 4C and 50NB air vent pipe in sea water suction header pipe line of unit IV ACW
NCTPS I Operation CAD CWPH Attending to leaks and puncture breakdown works at Cooling Water Pump House by welding in the worn out pipes and valves area and painting the corroded pipe lines for the period of six months from the date of taken o
MTPS I BM Unit III Annual maintenance 2023 2024 Cutting Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes etc
MTPS I BM Unit IV Annual maintenance 2023 2024 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes
MTPS I BM Unit I Boiler pressure parts AOH 2023 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st and II nd pass area
MTPS I TM Units I to IV Attending the breakdown maintenance works of Valves Pipe Lines reducers by cutting and welding gasket renewing of valves flanges and defective passing Valves in Units I to IV during 2021 22 as and when required basis fo
Custom Bid for Services - Replacement of the metallic bellows of the main steam pipe line of Size 1420mm Thickness 14 mm which involves Preparation of the edge for welding and new bellow using GTSW or SMAW along with NDT checks Sch Qty 2 Nos
MTPS I BM Unit II Boiler pressure parts AOH 2023 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st II nd pass are
MTPS I BM Unit III Boiler pressure parts AOH 2023 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st II nd pass area
MTPS I BM Unit III AOH 2023 24 FG Duct A B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints e
NCTPS I Operation Circle CA Dn RWPH Attending to leaks and puncture breakdown works in RWPH to Service water over head tank for fill line drawal line over flow line overhead tank to ICHS line and Reject water line by welding in the worn out
NCTPS I Operation CA Dn CWPH Attending to leaks and puncture Breakdown works by welding in the worn out Pipes and valves area and painting the corroded pipe lines and general house keeping of pump and butterfly valve area at cooling water pump house
TTPS Mech II TM I Unit I II III Breakdown maintenance of HDPE pipes of various size from 150NB to 450NB plastic welding of punctured joint new joints dismantling and re erection of the HDPE pipes of old new including material upto 31 03 2025
NCTPS I Operation Circle CA division DM and RO Plant Attending to preventive and breakdown maintenance works in DM Plant and RO Plant such as welding overhauling of pumps etc for the period of One year from the date of handing over of site
MTPS I BM Unit II Boiler pressure parts COH 2023 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st II nd pass area
MTPS I BM Unit I Boiler pressure parts AOH 2024 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler I st and II nd pass area
MTPS I BM Unit I AOH 2024 25 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints
MTPS I BM Unit IV Boiler pressure parts AOH 2023 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I st and II nd pass area
MTPS I TM UNIT II changing the defective valves of IPT Flange and Stud heating line AS 8 BFP RC 2A by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line