TTPS Mech II AHP Dismantling the existing wornout MS Grill and wornout structural supports fabrication of new structural supports erection and painting of new MS grill and new MS structural supports in Ash slurry sump 4A Ash water tank manhole for Un
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
TTPS Operation Circle MPM-II ACP Rubber lining in the existing air duct at O mtr near sea water booster pump, New air duct fabrication, erection and painting the incoming duct of O mtr cable gallery at Unit V Air washer duct
MTPS I Mill Plant Unit IV Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 22 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit IV Hard facing of MS bend multiple port outlets in coal flow lines and Fabrication of MS bend 15deg 22deg to suit dia 508 mm X 12 7 mm thick coal pipe line during AOH 2024 25
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe of Bearing cooling water supply and return pipeline in unit I from Mill plant operator room upto the valve inside the Turbine area including supply of
NCTPS I ES Circle EM I Division SD IV Fabrication of Vacuum Pump motor special type terminal block Laying and Re routing of cables in battery room in all three Units and commissioning of 24V 1450AH 13 cells battery in Unit I
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
NCTPS I Operation Circle CA Dn DM Plant Dismantling the existing damaged 150 NB 125 NB 50NB and 40NB MSRL Spool pieces bends Tee Pieces with flanges and Diaphragm valves Fabrication and Erection of new MSRL pipes and fitting and Overhauling of diaph
MTPS I Mill Plant Unit III Dismantling the damaged Mill outlet Elbows Orifices Transition pieces fabrication of spool pieces Mill port outlet 90deg bend and renewing with new from Coal mill outlet up to Mill floor in coal mill 3A 3B 3C 3F
NCTPS I SE M II Circle AHP Dn Dismantling the damaged severely corroded walk way platform and fabrication erection of new walk way platform and its supporting structural over the newly provided structural column along the Ash Slurry Line No 1 to 5
Fabrication of Toilet View cutter with MS square channel and sheet,foldable both side.center sheet to be painted with Singara chennai 2.0 logo and face portraits of a male and female in while background on both sides at various street in Zone 12
MTPS I BM AOH 2026 Unit III Boiler pressure parts Cutting removing of heavily worn out CRH and HRH tubes roof plate and fabrication and erection of new Corten steel sheet and allied works in the penthouse area at 52 mtr level
TTPS Operation Circle CAD Fabrication and Erection of M.S. structural frames to renew the damaged bearing 600 mm dia A.C.W supply and return water pipe line structure of unit I, II and III near repair bay I area while unit in service condition.
MTPS I Mill Plant Unit III Fabrication of MS bend 10 degree 15 degree and 22 degree 8 Nos to suit dia 508mm X 12.7mm thick coal pipe line and hard facing of existing New MS bends 19 Nos during COH 2019 20
Purchase of Consumables for Welding Section and Fitting Shop in Mechanical Department
NCTPS I Operation Circle CAD CWPH Attending to leaks and puncture Breakdown works in RWPH Service water over head tank for fill line drawl line over flow line over head tank to ICHS line and reject water line by welding in the worn out leaky and
MTPS I Mill Plant Unit I Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level Welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
MTPS I Mill Plant Unit II Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level Renewal of eroded worn out Expansion Joint Welding of eroded 2C 2E 2F and worn out portion of hot air
NCTPS I Operation CAD CWPH Attending to leaks and puncture breakdown works at Cooling Water Pump House by welding in the wornout pipes and valves area and painting the corroded pipe lines for the period of six months from the date of taken over of s
TTPS Mech II TM I Unit I II III Breakdown maintenance of HDPE pipes of various size from 150NB to 450NB plastic welding of punctured joint new joints dismantling and re erection of the HDPE pipes of old new including material for the period from 0
TTPS Mech II BM Unit I Overhaul 2020 21 Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D
MTPS I BM Unit I Annual maintenance 2023 2024 Cutting Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A
Unbranded "As per specification for ""Air arc gouging electrode "",, Unbranded "As per specification for ""Air arc gouging electrode "", with standard C4117 BEML Welding Electrode prepared and approved by BEML LTD, OFFICE OF THE ASSISTANT GENERAL MANAGER, CORPORTAE MATERIAL 'BEML SOUDHA', 231/1 ,4TH MAIN ROA 8 millimeter
MTPS I TM UNIT II changing the defective BFP Suction valve 2C IPT Flange and Stud heating line valve AS8 H2CBP A and B suction valves 2 Nos by cutting and welding and changing the defective eroded 1 and 2 drain line and vent line valves pipes
TTPS MII BM Unit III Removal of ash accumulated over the mechanical dustcollector path ABCD and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path ABCD and suction side duct of ID fan A B cleaning
NCTPS I Operation Circle CAD CWPH Attending to leaks and puncture Breakdown works in RWPH Service water over head tank for fill line drawl line over flow line over head tank to ICHS line and reject water line by welding in the worn out leaky and
Mill Plant Unit II Hot air ducts welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion joints and providing insulation for P A inlet duct to mill for mills 2A to 2F during Annual overhaul 2023
TTPS Mech II BM Unit II Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side
MTPS I Mill Plant Unit IV Hot air ducts welding of eroded and worn out portion of hot air duct joints Renewal of insulation GI sheets and providing guard plates for the expansion joints in hot air ducts 4A to 4F during Annual overhaul 2024 25
TTPS MII BM Unit I Removal of ash accumulated over the mechanical dust collector path ABCD and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path ABCD and suction side duct of ID fan AB cleaning
MTPS I Mill Plant Unit IV Patch Welding of eroded portion of Hot Air ducts 4A to 4F worn out portion of hot air duct joints and providing guard plates for the expansion joint areas of hot air ducts 4A 4B 4C during overhaul 2025 26
Material procurement with EN10204 3 point 2 certifications and approved by DNV, Fabrication testing inspection and supply of PDE endcaps 1 with DNV certificate, Fabrication testing inspection and supply of PDE endcaps 2 with DNV certificate, ... certificate, Fabrication testing ... certificate, Fabrication testing ...
NCTPS I SE MI Circle R M 25 26 MPM Dn Unit II Dismantling of the existing wornout damaged Iron steel structure between L22 column L23 column and Renewal of steel supporting structures by using Angles channel Beam
Dismantling of existing 4 Nos CVTs and Erection commissioning of New 8 Nos 230KV CVT Capacitive Voltage Transformer along with terminal clamps Marshalling box and Galvanised steel structure for 230KV feeders and allied works at 230KV indoor switc
As per NIT Docs
AS PER NIT
As per NIT Docs
ITEM 1 Bullion of Jewelers grades Silver Ag with specification as serial number 1 in technical specification annexure attached, ITEM 2 Aluminum Al with specifications as serial number 2 in technical specification annexure attached, ITEM 3 Copper Cu with specification as serial number 3 in technical specification annexure attached, ITEM 4 Zinc with specification as serila number 4 in technical specification annexure attached, ITEM 5 Silicon Si rod with specification as serial number 5 in technical specification annexure attached, ITEM 6 Magnesium Mg Rod with specification as serial number 6 in technical specification annexure attached, ITEM 7 Aluminum Al Rod with specification as serial number 7 in technical specification annexure attached
AS PER NIT DOCS
As per NIT Docs
MTPS I Mill Plant AC Plant N E Room Unit I to IV Fabrication and Erection of New G I duct with supply air grill Dismantling the ideal duct in the Mini conference hall by removing the false ceiling perforated particle board Erecting etc
Custom Bid for Services - CPCLY25360 - Fabrication and erection of new underground Acid Closed Blowdown (ACBD) piping of plant- 212 (NHT/ISOM) at CPCL Manali Similar Category Piping Erection Service Maintenance and Pigging Service for Oil and Gas Pipelines Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Dismantling of existing damaged RCC Structures and Provision of 3 Nos of 230 KV AB Switch (WOE) Plinth for Providing New Steel Structures in 230 KV OKM,230 KV UdtLink-I and Udt Link-II feeders of Bus-II Isolators at 230 KV Myvadi SS
DESIGN, FABRICATION, SUPPLY, COMMISSIONING, INTEGRATION, TESTING OF INTEGRATED ANTENNA & DRIVE SYSTEM
Supply,Fabrication,Erection of 1 No 230KVABSWOE in 230KV Pallivasal feeder
Fabrication and supply of of Columns for FGD Bolted Ramagundam project
FBC BOILER BED MATERIAL REPLACEMENT, FBC BLR FABRICATION BOILER TUBE SLEEVES
Spares, consumables & accessories for Laser welding& Cutting Machine (OEM: M/s Scan Tech)
NCTPS I SE M II Circle AHP Dn Unit III ECO Hopper Rerouting of hopper ash discharge pipe line and shifting of mixing apparatus and its accessories from 0 Mtr to 22 Mtr elevation fabrication and erection ECO hopper platform for Economizer ash dis