MTPS I TM UNIT II Changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective VDAS 122 valve by IBR Non IBR welding in Unit II during Capital overha
MTPS I BM Unit III AOH 2022 23 FG Duct B side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints between APH ou
MTPS I BM Unit III AOH 2026 27 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints
MTPS I BM Unit II Boiler pressure parts AOH 2022 Rectification Replacement of Defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at I st and II nd pass area
MTPS I BM Unit III AOH 2024 25 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion of the expansion joints
MTPS I BM Unit IV Annual maintenance 2022 2023 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes
MTPS I Mill Plant Unit II Renewal of eroded worn out Expansion Joint 2A 2B 2D Welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion joints and providing insulation for PA inlet duct to mill
Portable welding type Fume Extraction Unit 2.2 KW., Suction Air Flow 2200 m3/hr, Dia 200 mm suction point, Prefilter, Activated carbon filter, Electrostatic filteration, Filteration efficiency 99%, Suction hose 2.5 meter self supported 360 degree rotating spring loaded suction arm, similar to FE300E model.
Portable welding type Fume Extraction Unit 2.2 KW., Suction Air Flow 2200 m3/hr, Dia 200 mm suction point, Prefilter, Activated carbon filter, Electrostatic filteration, Filteration efficiency 99%, Suction hose 2.5 meter self supported 360 degree rotating spring loaded suction arm, similar to FE300E model.
Operation Circle CA Division CWPH Attending to leaks and puncture breakdown works at Cooling Water Pump House by welding in the worn out pipes and valves area and painting the corroded pipe lines for the period of six months from the date of taken ov
RAW MATERIALS FOR CHAFF CUTTER MACHINE REFER NIT TECHNICAL FOR DETAILS
AS PER NIT
AS PER NIT DOCUMENTS
.
Industry Unit; Sl No 10 Modification and fabrication of Structural Steel Support structure as per suit to site condition; As per tender conditions, Repair, Maintenance, and Installation of Plant/Systems/Equipments (Version 2) - Industry Unit; Sl No ... 11 Fabrication and ... 19 Fabrication and ... 20 Fabrication and ...
Fabrication and supply of Foundation Bolt Material with BHEL materials.
Fabrication and supply of TT BURNER ATTACHMENTS with BHEL materials
Fabrication of Shop Pressure Parts Attachment requirements through OSB model
Fabrication and supply of TT BURNER ATTACHMENTS with BHEL materials
Fabrication and supply of Box Columns for NTPC Patratu project
Fabrication and supply of ATTACHMENTS with BHEL material (OSB Model)
Fabrication and Supply of Auto Welded Items with Vendor material
Fabrication of THREADED CLEVIS for Patratu projects through OSB model
Annual Rate Contract for fabrication and supply of Feeder Components
Fabrication and supply of AW Vertical Bracings with BHEL materials
Fabrication and supply of Bellows (NON NTPC) with BHEL materials
Supply,Fabrication,Erection of 1 No 230KVABSWEin 230KV Aliyar feeder
Contract for fabrication repair works-34nos. of Battery operated Vehicles.
Fabrication and supply of DUCTs for NALCO R-M project
Fabrication and Supply of TIE RODS LENGTH ABOVE 6000 MM
Cable tie 4, Araldite, Cable tie 8, Cable tie 10, WD-40, Cutting wheel, Grinding wheel, 5 MM Big head rivet, Sikaflex, Insulation tape 1, Argon gas, Aluminium sheet 2 mm 8X4 feet, Dendrite rubber gum, Cable tie 6, Aluminium welding roll, Welding ... MS, Welding electrode
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
S.64 NCTPS II ES circle CI Division Lab Subdivision Carrying out painting works in Unit I and II SWAS areas Fabrication and Erection of working platform for Generator Main Bushing R S T Flow Transmitters and Cold gas Temperature Control Value i
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes and providing cement pedestal from GLR III Discharge Header to DM Plant II for a length of 190 Mtrs upto the western wall of sewage treatment plant including
TTPS Operation Circle CAD Attending repair and overhauling of Raw Water Pump A, B and C in GLR III and Fabrication, Machining and supply of Gland Bolts Nut with washer for Sea Water Booster Pumps in Unit-IV and V ACW System
Supply, fabrication, erection of 110 KV LAS dismantling 22 KV strung bus, providing earthing, associated equipment erection on LV side for enhancement of 110 / 22 KV power transformer capacity from 2 x 16 MVA into 3 x 16 MVA at Madhampatty 110 KVSS
EM I Complete rewinding of 90 KW 415V 3 Phase Induction Motor of Instrument air compressor Motor 3A Bearing Machine No 104 208 02 and fabrication of new rotor shaft of 90kW 415 V AC 3 phase Induction motor of Instrument Air Compressor
TTPS Operation Circle CAD Unit IV Dismantling of worn-out punctured 600NB Sea Water pipe of Self Cleaning Strainer A B suction header line. Fabrication and erection of new M.S 600NB Sea Water pipe in original position in Unit-IV ACW System
NCTPS I ES Circle EM II Division SD II AHP Fabrication and erection of motor base bed suitable for KD 400 frame 230KW ASDP HT motors after removal of existing corroded defective motor base bed and renewing the damaged concrete pedestal at loca
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes and providing cement pedestal for a length of 180mtrs from western wall of sewage treatment plant to Sewage treatment plant arch GLR-III to DM Plant II raw
MTPS I BM AOH 2025 Unit IV Boiler pressure parts Cutting and removing of heavily worn out CRH and HRH tubes roof plate and fabrication and erection of new HR Sheet and allied works in the penthouse area at 52 mtr level
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
Rotation of steel cord pipe conveyor reels to change its present position to 90 degree position to avoid sagging and supply and fabrication of PVC coated tarpaulin of 630 GSM or higher grade and covering the belt reels during the year 2020-2021
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
NCTPS I SE MII Circle AHP Dn Unit II Modification of existing chute arrangements by Design, Supply, Fabrication and Erection of Y Chute arrangements with necessary accessories to connect to PDFAC vessel and Wet sluicing Mixing Box in 1st Row of ES
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes for a length of 210Mtrs from EE/CMD I office to Time Office Gate. GLR III to DM Plant II raw water line including supply of 200NB M.S. pipe
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac
TTPS Mech II AHP Dismantling the existing wornout MS Grill and wornout structural supports fabrication of new structural supports erection and painting of new MS grill and new MS structural supports in Ash slurry sump 4A Ash water tank manhole for Un