FABRICATION AND ERECTION OF 2 X 8000 KL MILD STEEL IFRVT WITH FOUNDATION FOR MS and CONVERSION OF EXISTING 1 X 5000 KL CONE ROOF TANK TO IFRVT FOR UTILISATION AS SWING TANK WITH PIPELINES FOR RECEIPT OF PRODUCT FROM UPCOMING SANKARI- IRUGUR PIPELINE
TTPS Operation Circle CAD Dismantling the badly corroded portion of M.S structural arch of pipe supports and fabrication and Erection of new Structural arch of pipe supports near unit IV and V east side of switch yard Reach - 4, 5, 6, 7, 8 and 9
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes and providing cement pedestal for a length of 180mtrs from sewage treatment plant arch to before EE/CMD I office. GLR III to DM Plant II raw water line incl
MTPS I OANDAHS unit III IV Ash handling pump house stage II Dismantling of worn out suction pipe lines bends and grills in Ash slurry sump III and IV Fabrication and erection of 300NB M S suction pipes and bends in the suction lines
Fabrication of Toilet View cutter with MS Square channel and sheet, foldable both side center sheet to be painted with singara chennai 2 0 logo and face portraits of a male and female in whitebackground on both side in Division-173, Unit-40, Zone-1
MTPS I Mill Plant Unit I Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 1A to 1F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
Sp.77 NCTPS II ES circle EM II Division Sub division I Overhauling VPI of 11KV 4000W 239A 1494 RPM Primary Air Fan Motor 48266A421 81 01 including machining of NDE side rotor shaft and fabrication of labyrinth seal to match with rotor shaft new
NCTPS I ES Circle EM II Division S Dn II AHP Fabrication and erection of motor base bed suitable for KD 400 frame 230 KW ASDP HT motors after removal of existing corroded defective motor base bed and renewing of the damaged concrete pedestal a
FABRICATION SUPPLY AND ERECTION OF 200 NB SS 316 GR SEAMLESS PIPE SCH 80 FITTINGS FOR BACK WASH LINE OF HEAT EXCHANGERS SUCTION IN UNIT IV and V ACW SYSTEM SUPPLY OF M 18 X 100 MM SS 316 BOLT NUT WITH 2 NOS WASHER
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200 NB M.S pipes of OHT 1 inner tank pipe lines from Clarified water pump house I Discharge Header to cooling water pump seal water line for a length of 190 Mtrs Auxilary cool
NCTPS I SE M II Circle AHP Dn Dismantling the damaged severely corroded walk way platform and fabrication erection of new walk way platform and its supporting structurals over the cement concrete pillar of Ash slurry line No 1 to 5 from North East
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200 NB M.S pipes of OHT 1 inner tank pipe lines from Clarified water pump house I Discharge Header to cooling water pump seal water line for a length of 210 Mtrs upto Auxilary
NCTPS I Operation Circle CA Dn DM and RO Plant Dismantling the existing wornout line Fabrication Rubber lining and erection of new MSRL Pipe Bend T Piece and Reducer in Pressure sand filter I II III IV and V inlet and outlet connecting pipe lines
MTPS I BM AOH 2025 Unit III Boiler pressure parts Cutting and removing of heavily wornout CRH and HRH tubes roof plate and fabrication and erection of new corten steel sheet 3.15mm thick and allied works in the penthouse area at 52 mtr level
Supply of COWL chassis and Fabrication, furnishing and installation/ mounting of Bus body on max 32 feet length COWL and Chassis for ARRV AMF (Accident Relief Road Vehicle) as per attached annexure (A, B, C, D, E, and F) including RTO vehicle registration/passing
MTPS I Mill Plant Unit I Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 1A to 1F and Dismantling of seal air fan motor and overhauling reassembling and setting the alignment
MTPS I Mill Plant Unit IV Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 4A to 4F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
MTPS I Mill Plant Unit II Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 2A to 2F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
MTPS I Mill Plant Unit I Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 1A to 1F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment etc
FABRICATION OF TABLE WITH CHAIRS FOR CGAIS CHENNAI AND PROVISION OF U SHAPED TABLE AND CHAIRS FOR CONFERENCE HALL AT CGDHQ-5 AND PROVISION OF MODULAR WORK STATION FOR ADMIN SEC ILMC AND IT SEC AND DRAWING TABLE WITH SLIDING RACKS AND DRAFTSMAN ETC
ECHP-I- Fabrication and machining of guide roller for rack and pinion gate in Vibrex Screen C bypass gate and removal of bend in cage bars released from Secondary Crushers and kept as common spare for Secondary Crusher A, B C at SCH-I
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 deg 11 deg 10 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit III Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A to 3F and Dismantling of seal air fan motor and overhauling reassembling and setting etc
TTPS Operation Circle O E II FPS Dismantling, Fabrication and Erection of 150 NB, 100 NB, 25 NB Header lines, Detection lines, 150/100 NB Deluge valves, 150 NB/100 NB Isolation valves in Medium Velocity Water Spray System of unit IV and V.
MTPS I Mill Plant Unit III Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr and 18 mtr level Renewal of eroded worn out Expansion Joint 3A 3B 3F Welding of eroded and worn out portion of hot air duc
TTPS Mech II AHP Unit IV V BAH ECO and APH Breakdown maintenance of HDPE pipes of various sizes from 32 mm OD to 450 mm welding of punctured joint/ new joints dismantling and reerection of the HDPE pipe of old/new and rubber lining of MS pipe
NCTPS I Operation Circle CA Division RWPH AMC IInd Half Attending to leaks and puncture breakdown works in RWPH to Service water over head tank for fill line drawl line over flow line and over head tank to ICHS line by welding in the worn out leaky a
MTPS I BM Unit I AOH 2024 25 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A and B sides
TTPS MechII AHP Unit IV V BAH ECO and APH Break down maintenance of HDPE pipes of various size from 32 mm OD to 450m welding of punctured joint new joints dismantling and reerection of the HDPE pipe of old new and rubber lining of MS pipe of vari
TTPS Mech II BM Unit III Removal of ash accumulated over the mechanical dust collector path ABC D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan
TTPS Mech II AHP Unit IV V BAH ECO and APH Breakdown maintenance of HDPE pipes of various size from 32mm OD to 450mm welding of puntured joint new joints dismantling and reerection of the HDPE pipe of old new and rubber lining of MS pipe of various s
NCTPS I Operation CA Dn RWPH Attending to leaks and puncture breakdown works in RWPH to Service water over head tank for fill line drawal line over flow line over head tank to ICHS line and Reject water line by welding in the worn out leaky and corro
MTPS I Mill Plant Unit I Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr and 18 mtr level Renewal of eroded worn out Expansion Joint 1A 1B 1C Welding of eroded and worn out portion of hot air
Sp.103 NCTPS II ES circle EM II Dn Routine Maintenance of Power Supply arrangements of Stage-II Employees Quarters at Vallur Camp and Temporary and Welding Power Supply of NCTPS II For a period of one year up to 31 03 2026 from 01 04 2025 or from
TTPS Mech II BM Unit I III Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct
MTPS I BM Unit II AOH 2025 26 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A and B sides
TTPS Mech II AHP Unit IV V BAH ECO and APH Breakdown maintenance of HDPE pipes of various sizes from 32 mm OD to 450 mm OD welding of punctured joint new joints dismantling and re erection of the HDPE pipe of old new and rubber lining of
MTPS I BM Unit IV AOH 2025 2026 Cutting Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A and B sides
MTPS I BM Unit III AOH 2026 27 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and outlet of APH hoppers and renewal of eroded duct support pipes both A and B sides
Custom Bid for Services - 1 Supply and safe delivery of metal grating along with correlated test certificates as per scope of work Qty 20 Unit Sqm, Custom Bid for Services - 2 Removal of Hatch blocks each 10 ton from EL twenty two and a half meter ... 3 Fabrication Painting ... of steel structures as ...
As per NIT Docs
AS PER NIT
As per NIT Docs
1
3D Visualisation system, 3D Model, High Definition Projection, Fabrication, Air conditioner, Networking
Design, fabrication & supply of conveying system using power rollers as per annexure
Design, fabrication and supply of Mechanical seal for DM water supply pumps
Supply,Fabrication,Erection of 1 No of 230KVABSWE in 230KV Pallivasal feeder
Fabrication and supply of ECW Tanks and Dished End through OVM Route
Fabrication and Supply of PLATE FORMED MITRE BENDS with BHEL Material - OSB