Loading…
Loading…
4,930 results • Best match
FABRICATION and SUPPLY OF MARMAN COUPLING and ORIFICE PLATE WITH BHEL MATERIAL
Design, Engineering Procurement, Fabrication, Delivery Of air Heater Box as per specification
C12A250049 2945260018 Design, engineering, fabrication, inspection, testing and supply as perCPCL-HE
Supply,Fabrication,Erection of 1 No 230KVABSWOE in 230KV Aliyar Breaker Switch
Design, Fabrication, inspection and supply of Ultrasonic Cleaning System as per specification
Development, Fabrication & Supply of Electronics systems integrated in a ABS Surface Float
PCB MOTOR CONTROLLER M370/1E LAY14, M. 3.76-A TAURUS SYNERGIC WELDING MACHINE CONTROL
PCB MOTOR CONTROLLER M370/1E LAY14, M. 3.76-A TAURUS SYNERGIC WELDING MACHINE CONTROL
Spares, Consumable and Accessories for M/s. Migatronic Make PI 350 DC Welding Machine
WELDIND ELECTRODE E308 L15 - 4.00 MM (Q3), WELDING ELECTRODE E308 L15 - 3.15 MM (Q3)
NCTPS I ES Circle EM II Division SD I Replacement of failed HT mill motors at location 3E and 3C twice and PA fan motor 1B reconditioning of rotor shaft of defective mill motors and Fabrication and erection of rain hood for PA fan motor 1B
NCTPS I ES Circle EM II Dn SD n IV Cables Fabrication and Erection of cable tray support structure work in Ash Handling pump House motor room of Unit I and III with AHP transformer A and B yard and cleaning relaying binding and dressing variou
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes for a length of 120Mtrs from Repair Bay II to Bottom Ash Hopper of Unit V. OHT II to Power House of Unit IV and V service water line including supply of 200NB
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200 NB M.S pipes of and providing M.S Supports for a length of 150 mtrs from Time Office Gate to DM Palnt_I GLR III to DM plant II raw water line including supply of 200 NB
Fabrication Supply Erection and Commissioning of 100 NB sea water sealing pipe andfittings for cooling water pumps and 200 NB seamless pipe for sea water pipe line from AHP to cooling water pump of Unit I II and III for pipe No. 5 7 15 a
MTPS I M I CA CWS I Fabrication of sun shield roof structure for replacing a portion of damaged Corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of Cooling Tower II during COH 24 25 of Unit II
MTPS I BM UNIT III Boiler pressure parts AOH 2026 Rectification of buck stay beam supports renewal of worn out buck stay pin Fabrication of buck stay cover plate etc in Ist and II nd pass area and allied works Maintenance of various sizes of hanger
TTPS Mech II BM Unit II Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan
TTPS Mech II AHP Unit IV V BAH ECO and APH Breakdown maintenance of HDPE pipes of various size from 32 mm OD to 450mm welding of punctured joint new joints dismantling and re erection of the HDPE pipe of old new and rubber lining of MS pipe of variou
TTPS Mech II AHP Unit IV V BAH ECO and APH Break down maintenance of HDPE pipes of various size from 32 mm OD to 450mm welding of punctured joint new joints dismantling and re erection of the HDPE pipe of old new and rubber lining of MS pipe of vario
TTPS Mech II BM Unit II Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan
TTPS Mech II BM Unit III Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID f
TTPS Mech II BM Unit I Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan
TTPS Mech II BM Unit III Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fa
Design, Fabrication & Supply of an electrostatic deflector system as per the specification enclosed
Manufacturing, Fabrication, Third Party inspection and Supply of Tube bundle for FOG Condenser
FABRICATION AND SUPPLY OF COAL COMPARTMENT ASSEMBLY WITH PLATE AND PIPE FORMED NOZZLE
Fabrication and supply of Tension Bar and Casing Seal Box with BHEL materials
Supply, Fabrication and Testing of Pre- Filter as per the detailed specification enclosed
Design supply fabrication erection testing and commissioning of 3x600MTS mounted type Pressure Vesel
Manufacturing, Fabrication, Third Party inspection and Supply of Tube bundle for FOG Condenser
Fabrication and Supply of Primary Pipe Supports for Tissue Machine#5 Lot - 2
Supply of materials, fabrication, Replacement of damaged Cable duct slabs damaged Vinyl flooring
Fabrication and Supply of Spherical Washer and Washer cup with BHEL Material - OSB
" Construction, Fabrication, and Allied Works for Outdoor Canteen at IMU Chennai Campus (Uthandi) "
supply fabrication and erection of radial gate deck bridge at pv 4 shep
Fabrication and erection of roof over the Neutralizing pit of DM Plant I
Supply, Fabrication & Erection of Ducting system for package air conditioner as per Annexure.
Slide Bar Part No-3128045828, Moc- Stainless steel (316 Grade) Without any joint, without welding
TURRET FRAME ASSEMBLY, WELDING & MACHINING/SEMI TO DRG. NO. 188.10. 087SB-2A-MK-III/SF
Welding, Bending, Greasing of threaded portion painting and delivering as 11 22 lines Stay Rod
Spares, Consumable and Accessories for M/s Kempii make X3-400 DC MIG Welding Machine
SMAW ELECTRODE FOR SA213T92 AND SA335P92 WELDING. SIZE- DIAMETER 2.5mm AND LENGTH 300 or 350mm.
PCB MOTOR CONTROLLER M370/1E LAY 14, M. 3.76-A TAURUS SYNERGIC WELDING MACHINE CONTROL
Custom Bid for Services - Fabrication and Erection of pipes and structures in conventional areas ITEM NO 1 Transportation of piping to required lengths Erection of Carbon steel and Stainless Steel piping SCHEDULED QTY 3000 INCH METER, Custom Bid for ... 1 Welding of ... 1 Fabrication of ... 2 Fabrication of ... 3 Fabrication of
AS PER NIT
As per NIT Docs
As per NIT Docs
AS PER ANNEXURE- 1
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200 NB M.S pipes and providing cement pedestal for a length of 150 mtrs from DM Plant I to Express lab II GLR III to DM Plant II raw water line including supply of 200 NB M.S