Loading…
Loading…
2,514 results • Best match
SUPPLY, FABRICATION AND ERECTION OF LOW ROOF MEZZANINE IN THE EXISTING FACTORY SHEDS AT OIL PACKING STATION, SHIVARAMPALLY, HYDERABAD TELANGANA STATE.
Supply, Fabrication, Erection and Commissioning of STREET LIGHTING for our Oil Palm Processing Plant at Aswaraopet, Bhadradri Kothagudem District, Telangana State.
DESIGN, SUPPLY , FABRICATION, ERECTION AND COMMISSIONING OF NUT POLISH DRUM FOR OUR OIL PALM PROCESSING PLANT AT APPARAOPET, BHADRADRI KOTHAGUDEM DIST
Fabrication and fitment of power container (engine room and pump room) housing for EX-1900 hydraulic shovels working at OCP3, RG2
FABRICATION AND FIXING OF GATE FOR RESTORATION AND CONVERTION OF CHINTHALA CHERU AS MINI TANK BUND AT JAGTIAL (V&M) & DIST
Fabrication, supply and installation of LED signage Board VINAYAK CHOWK letters in English and warm lights etc., at vinayak chowk junction.
AWARDING CONTRACT FOR FABRICATION OF SPECIAL ROOF BOLTS WITH FIXING ALL ACCESSORIES AND SUPPLY TO USE AT SKLWP OF MANDAMARRI AREA.
Supply, fabrication and installation of Rythemic gymnastic hall in PJR stadium in Ward no.110 Chandanagar circle-21, Slp Zone, GHMC
Fabrication of waste - to - art with used tyres and other waste materials in kamareddy municipality under General Fund/SFC/Other Fund
Supply Fabrication and Fixing of Chain Link Fencing at North Side of Play Ground at NALSAR University of Law, Shameerpet, Hyderabad.
Fabrication and replacement of worn out structures like discharge/receiving chutes, walkways, chequered sheets, platforms, ladders etc. at OCP3 CHP, RG2
Fabrication and Supply of Combined Fire Fighting Cum Rescue Vehicle with Turn Table Ladder minimum 27 Meters as per Departmental Specification
Design, fabrication, manufacturing, supply, erection, testing and commissioning of automatic statutory testing and painting system at IOCL Cherlapally LPG Bottling Plant.
Rectification of Rain water leakages (Supply, fabrication and Fixing of GI gutter, bolts and washers require material) at Extruder plant shed
Fabrication Repairs/Replacements on Komatsu 100T Dumpers at OC Projects under RC for a period of 2 years against Open Enquiry.
Design, Fabrication, supplying and commissioning of 72 inches thread chasing machine for manufacturing of roof bolts at CWS, Kothagudem of SCCL.
Fabrication and supply of MS Tree Guards for Telanganaku Haritha Haram program in Bollaram Mniciplity under Municipal General fund 2020-21
Fabrication and supply of 40 cm Iron Mesh Tree guards at various places in pocharam municipality under Municipal General Funds2019-20
Fabrication and supply of 40 cm Iron Mesh Tree guards at various places in Narsingi municipality under Municipal General Funds2019-20.
Providing Civil works for In-pit feeder breakers including fabrication and erection at SRP-OCP in Srirampur area, Mancherial dist., T.S.
Fabrication of W-Straps for all Mines of SRP Area as per the Scope of work, Terms and Conditions of NIT
Supply, Fabrication, Transportation & erection of ventilation shaft for smoke exhaust system and chilled air delivery duct in MCR at PJHES, Revulapally.
Fabrication, supply and laying of No parking boards in TIE Ph-I & II and IDA Balanagar, Medchal Dist(under IALA Funds)
Outsourcing Contract for Fabrication of TISCOGS Required for GDK-11 Incline, RG-I Area for a Period of Two (2) Years
Fabrication of (10)Nos Automatic monkey traps and (10)Nos Manual monkey traps for Veterinary Wing, Khairthabad Zone, GHMC (2nd Recall)
Outsourcing of services for fabrication of fender, cabin, power container and painting of EX 1200 Hyd Excavator working at RGOCM-1.
Fabrication, Supply and Errection of Tubular Trusses to Covered Shed at Mango Market Yard Chelgal under AMC., Jagityal of Jagityal District.
Design and fabrication of Bio Safety Laboratory on Turnkey Basis at Gandhi General Hospital/GMC Secunderabad at Gandhi hospital(3rd Call)
EPC FOR DESIGN, SUPPLY, FABRICATION AND ERECTION OF INDUSTRIAL SHED FOR VARL 300 SKULL MELTING FURNACE THROUGH PEB SYSYTEM AT MIDHANI
1) DESCRIPTION: PAPER BAG 2) FINISHED SIZE: LENGTH:45CMs WIDTH: 36 CMs 3) PAPER : BROWN/ 60GSM (+/-)5% TOLERANCE 4) FABRICATION : a)
BTPS - CHP - Fabrication, Transporting and erection of dummy MS plates, SS liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-4AB, 5AB, BCN-8 connecting chutes at TP-3, BCN-10, TP-4 and ERH in MM-III sub division of MM/CHP/BTPS as and when required for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026
BTPS - CHP - Fabrication, Transporting and erection of dummy MS plates, SS liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-4AB, 5AB, BCN-8 connecting chutes at TP-3, BCN-10, TP-4 and ERH in MM-III sub division of MM/CHP/BTPS as and when required for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026
TGGENCO - KTPS VII Stage - P31 - ADM - S and S - Procurement of Stock items (Welding Electrodes,Holders, Regulators, GP Electrodes etc.) - Quotation called for - Reg.
Custom Bid for Services - Wet leasing of welding works on wagons at Sidings in Secunderabad division for a period of 2 years SCH A Cost of Manpower for, Custom Bid for Services - SCH B Wet leasing of welding machines at 11 Sidings as per scope, ... of welding machine ...
Custom Bid for Services - Wet leasing of Welding/Gas cutting activity of ELS/KZJ for a period of two years (man power portion), Custom Bid for Services - Wet leasing of Welding/Gas cutting activity of ELS/KZJ for a period of two years (Supply portion) Similar Category Manpower Outsourcing Services - Minimum wage Manpower Outsourcing Services - Man-days based
Carrying out the Ducting erection, Alignment, welding, ATT work of Stage -II Unit-04 at FGD Project 3x200 MW 3X500 MW NTPC Ramagundam Site.
Service charges for Conducting PAUT (Non- Destructive Test) on Welding Joints in Pressure Parts of Unit-9 Boiler during Unit-9 Annual Overhaul Works.
Recarpeting of BT road from NAC building, Tayaba Medical Hall to 18-1-514/3, SKS Welding shop at Naseeb Nagar in Uppuguda Divn
Repairing to trolley of sanitation tractors, Autos, Welding, denting and Branding with IEC activities to sanitation tractors , Autos in Town-II in Nalgonda Municipality.
Outsourcing of services for welding of Pick & Pick holders on 500 TPH feeder breakers at RGOCM-1 CHP for a period of 2 years
Engaging of Swimmers, Gas Cutter / Welding Machine, Engaging of Labours and spreading of Quarry Dust for Vinayaka Chavithi Festival Arrangements in Nirmal Municipality-2024
Repairing to trolley of sanitation tractors, Autos, Welding, denting and Branding with IEC activities to sanitation tractors , Autos in Town-I in Nalgonda Municipality.
Outsourcing of services for welding of Pick & Pick Holders on 500TPH feeder Breakers working at CHP RG OCM1 for a period of 2 years.
EXISTING OLD TREE GUARDS CUTTING AND RE WELDING, PAINTING FROM TOOPRAN Y JUNCTION TO PRAGNAPUR ROAD IN MCGP UNDER GREEN BUDGET FUNDS 2021-22.
Extension/formation of shed for welding plants at Shovel section at Base Workshop, Krushibhavan, OCP-III, RG-II area, Godavarikhani, Dist. Peddapalli, Telangana State.
Hiring of Crane, Prividing Barricading, hiring Gas cutter and welding machine set for Immersion of Vinayaka Idols at Vinayaka Sagar Bangalpet in Nirmal Municipality
Custom Bid for Services - Requirement of Manpower for attending routine drinking water supply Plumbing carpentry masonry welding and sanitary works including supply of materials
Construction of Entrace gate two sides pillor with iron support frame welding work board letters background acrylic letters with led lights and grainate stone work at municipal office in W.no 26 in Medak municipality under 15thFCG/MGF
Providing and fixing of false ceiling in CAAO cabin and Fabrication of cupboards in Instrumentation room No.218, 219 and Modification works in room no. A-218 for accommodating CMS and other miscellaneous works in AMD, Hyderabad
RUNNING MAINTENANCE OF LRSB WALL BLOWERS BURNERS AND OTHER MISC WORKS REPAIR RECLAMATION FABRICATION WORKS IN STAGE I II AND III BOILERS AndSERVICING OF HP VALVES IN BOILERS IN STAGE 1,2 AND 3 BOILERS FOR 202021 And 2021 22