Loading…
Loading…
1,077 results • Best match
Window AC 1.5 Tn 3 Star with Stabilizer, Manila Rope 110 Mtrs, Chuna, Sand Bag, Flex 3x4 Ft, Acrylic Frame A4 Size, Smoke Detector BOQ Title boq bid
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Turnover Yes Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, ... Portable Fire Extinguishers (V2) ...
MOEI & Fans, Sub-station equipment i.e. transformer, LT panel with switch gears, 140 KVA DG set, water pump sets, lift, wet riser system, fire alarm system, A.C Machine, Compound light for GPOA building, transit hostel at Chirukandi Road, Ramnagar, Silchar (SH:- Running & Maintenance of 2 nos of 13 Passenger Lifts (Make- Johnson) at Kendriya Sadan, Silchar Assam)
MOEI & fans, Sub-station equipment i.e. Transformer, LT Panel with switch gears, 140 KVA DG Set, Water pump sets, Lift, Wet riser system, Fire alarm system, AC machine, Compound light for GPOA building, Transit Hostel at Chirukandi Road, Ramnagar, Silchar (SH: Running & Maintenance of 02 Nos. of 13 Passenger Lifts (Make-Johnson) at Kendriya Sadan, Silchar, Assam.
RFQ ITEM NO. 10, RFQ ITEM NO. 20, RFQ ITEM NO. 30, RFQ ITEM NO. 40, RFQ ITEM NO. 50, RFQ ITEM NO. 60
Construction Material, B&R Items And Fire Alarm for Medium Living Shelter (10.44m X 6.10m X 4. (Q3)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past ... Portable Fire Extinguishers (V2) ...
SUPPLY AND INSTALLATION OF REMOTE OERATED VALVES AND SECURITY AIR COMPRESSOR, ASSOCIATED FIRE HYDRANT AND LPG PIPELINE WORKS FOR COMMISSIONING OF LPG PUMP
SOPD_G_25_26_66 Construction of 3 Nos. of Helipads along with Double layer barricading including link roads of Helipads and Parking for fire tender and Ambulance at Mouchanda Pather, Kaliabor for the visit of Honble Prime Minister of India for founda
Fibre sheet partition for office, Mirror for Platoons, White Bed Sheets, Fire Extinguisher 1 Kg, Cloth Hanging Wire BOQ Title BOQ ACG
Construction of 3 Nos. RCC G plus 6 storied Housing Project at Dolabari, Tezpur including approach road, earth filling, boundary wall, 630 KVA Substation, 160KVA Diesel Generator set, underground water tank for firefighting, STP 15 kld, CCTV etc.
Supply and refilling of i) Dry chemical powder type BC class make- Andex or similar with new CO2 cartridge having ISI mark, with painting & stickering at outer surface of cylinders. ii) Supply and refilling of carbon dioxide type fire extinguisher with painting and stickering of outer surface of cylinder as per annexure attached. Gaurantee/Warranty certificated required. HSN code- 84241000. Make/Brand:- ANDEX/ISI MARK.
Annual maintenance contract(2021-24) of FADS at Jorhat Airport
CLOSED LOOP FOR FIRE HYDRANT SYSTEM AT TT PARKING AREA ALONG WITH CONSTRUCTION OF PIPE-RACK AND INNER BOUNDARY OF LICENSED AREA AT LPG BP, SILCHAR (ASSAM)
dismantling loading, testing, re- filling and re fitting of co2 cylinders at KHPS.
Gas Pipe, Gas Regulator, Tirpal 24x18 Ft, Tirpal 30x30 Ft, Hand Blower, Patila 18 Inch with Cover, Flex, Smoke Detector, Media Converter, LRP Gas Stove, LRP Butane Gas Can, Connector, TV Stand BOQ Title BOQ BID
Custom Bid for Services - AMC of Gas Monitoring System for three years at LPG Bottling Plant, North Guwahati Similar Category AMC/CMC of Fire Extinguishers
Shoulder Press Macine for OUtdoor Gym, Surf Board for Outdoor Gym, Guard Cabin, Search LIght, Swing (Jhula) 2 seater, Iron SS Garden Bench (3 seater), Fire Extinguisher
Custom Bid for Services - Repair, Painting & Glass Fitting of Fire Fighting Hose Cabinets at Surface Installations of ONGC Assam Asset Similar Category Professional Painting Service
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6538500 Dated : 05-08-2025 Bid Document 1/7 Past Performance 10 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Superstructure including foundation electric fitting furniture misc items fire alarm system, Retaining Wall, ILCB approach path, RCC Hume pipe drain, And all other specification as per RFP
HYDR. STRETCH TEST OF CO2 CYL, CAP. 2KG, CAP 4.5KG, CAP 6.5KG, CO2 CYLINDER REFILLING, CAPACITY 2KG, CAPACITY 4.5KG, CAPACITY 6.5KG, PAINTING OF CO2 CYLINDERS, VALVE, CO2 FIRE EXTINGUISHER
Hiring of Boats - Survey Boat; Less than 5 years; Without Air-Conditioning; 15; 500; Inboard; Wood; Lifebuoys, Fire Extinguisher, Repair kit, Rescue Life Jackets, First Aid Box; Service Provider
E and M items Earthing items alongwith Lightening Conductor for Living Bunker as per store list attached., Fire Alarm System for Living Buner as per store list attached
Water Dispenser, Water Camper, Tiffin Carrier, Digital safe Locker, Fire Extinguisher, Hot Case Tiffin, Emergency Light, Rechargeable Battery With Charger, Thermos, Chair Executive, Pedestal Fan, Computer Chair, Hand Towel, Pen Stand
Supply and installation of Fire suppression system cartridge 8/10 gram - 1 No. to be provided in the on board panel and 100 gm - 1 No. to be provided in the underslung panel of LHB NON-AC COACHES as per the annexure G1 of RDSO Specification No.- RDSO/PE/SPEC/AC/0192-2018 (Rev.1),LATEST TEMPERATURE SETTING 68-72 DEGREES TO BE USED AS PER RLY BRD GUIDELINES. All necessary modifications and back pieces and accessories required for installation of this item shall be with the scope of supplier.
Provn of Store Shelter for Shelter parts FOR ALONG, Provn of Store Shelter for Shelter parts FOR GELEMO, Provn of Store Shelter for Shelter parts FOR MAJA, Provn of Constr Mtrl for store shelter and Internal Pathway 12.00 into 2.00 Mtr FOR ALONG, ... and Fire alarm System ... and Fire alarm System ... and Fire alarm System ...
Foam Based Wheeled Fire Extinguishers (V2) ISI Marked to IS 16018 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6691582 Dated : 21-10-2025 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SLO Air Force Station Kumbhirgram/Assam, Department of Military Affairs, Indian Air Force, Ministry of Defence (Ankita Vishnoi)
Repairing and renovation of OPD RT annexe Old Hospital and Hospital building for retrofitting of existing building HVAC and Fire Fighting MEP works of Dr B Borooah Cancer Institute Guwahati 16
As per BOQ details
SITE SURVEY, DESIGN, MANUFACTURING, SUPPLY, DELIVERY, ERECTION, TESTING AND SUCCESSFUL COMMISSIONING OF FIRE DETECTION AND PROTECTION SYSTEM OF 4X50 MW KOPILI POWER STATION OF KOPILI HYDRO ELECTRIC PLANT, NEEPCO LTD, UMRANGSO. ASSAM.
LIFTING SPINDLE DRIVE, E-MOTOR 24 V WITH LIMIT SWITCH REQ IN CRASH FIRE TENDER MAKE ROSENBAUER (Q3)
Desktop PC, Visualizer, Projection System with Screen, Network, Switching, Control Equipment and Matrix Switcher, Podium with Integrated Control and Annotation, Biometric System, Moblie Jammer, CCTV System, Fire Alarm System, Online UPS 5 KVA
Desktop PC, Visualizer, Projection System, Networking Switching Cont Eqpt and Matrix Switcher, Podium with Integrated Cont and Annotation, Biometric System Dual Factor, Mobile Jammer, CCTV System, Fire Alarm System, Online UPS 5 KVA
Average Turn Over of Last 3 Years 1199 Lakh (s) Experience with Gov. Required 5 Year (s) Portable Pump Set For Fire Fighting ( 100 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values ... for fire fighting IS ...
High pressure 80-liter cylinder assembly with valve, pressure gauge, etc. with charged to 200 bar +/- 10% as per RDSO Specification IS/RDSO/CG/S/22001, for use in Automatic Fire Detection cum Suppression System (High Pressure Water Mist System). Item shall contain 53 liters of de-mineralized water and pressurized with Nitrogen gas at +/- 200 bar pressure. HRDV (High-rate Discharge Valve) should be Twin-Fluid Discharge type which should discharge water and nitrogen gas simultaneously. Make: Chaitanya Electricals Pvt ltd or Similar
Standalone PC, ADN PC, Visualizer, Projection System, Networking Switching Control Equipment and Matrix Switcher, Podium with Integrated Control and Annotation, Biomatric System, Mobie Jammer, CCTV Sys, Fire Alarm System, Online UPS 5KVA with Battery
Standalone PC, ADN PC, Visualizer, Projection System, Networking Switching Control Equipment and Matrix Switcher, Podium with Integrated Control and Annotation, Biomatric System, Mobie Jammer, CCTV Sys, Fire Alarm System, Online UPS 5KVA with Battery
GALVANIZED MILD STEEL FIRE BUCKET (Fire suppression hand tools) as per IS 2546 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6558446 Dated : 26-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Provn of Security Post Shelter part only FOR MENCHUKA, Provn of Security Post Shelter part only FOR TADADEGE, Provn of Security Post Shelter part only FOR YORLUNG, Provn of Security Post Shelter part only FOR LOWER TATO, Provn of Security Post ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ...
Dicharge rod PVC 33 KV, HT 33 KV Shorting rod chain, Measuring wheel digital display 3 section foldable imperial metric wheel, Hand gloves 33 KV HT complete pair, Gum boot for Electrician complete pair, Fire Extinguisher ball
Hiring of Boats - Engine Fitted Country Boats; Less than 5 years; Without Air-Conditioning; 25 to 30 personnel; 2500 to 3000; 20 HP; Wood; Repair kit, Rescue Life Jackets, Lifebuoys, Fire Blanket, First Aid Box, Fire Extinguisher; Buyer
Provn of Security Post Shelter part only FOR MANIGONG, Provn of Security Post Shelter part only FOR SEGONG, Provn of Construction Material for Security Post and Provn of Internal Pathway 20.00 x 1.00 Mtr FOR MANIGONG, Provn of Construction Material ... of Fire Alarm System ... of Fire Alarm System ...
Provn of Sentry Post Shelter part only FOR ORAK, Provn of Sentry Post Shelter part only FOR GELEMO, Provn of Construction Material for Sentry Post and Provn of Internal Pathway 20.00 x 1.00 Mtr FOR ORAK, Provn of Construction Material for Sentry Post ... of Fire Alarm System ... of Fire Alarm System ...
Hiring of Boats - Engine fitted country boat; Less than 15 years; Without Air-Conditioning; 20-25; 1000 kg; Outboard; Wood; Foot pump, Paddles, Repair kit, Rescue Life Jackets, Lifebuoys, 12 Volt Heavy Duty Battery, Genset-2KW, Fire Extinguisher, Fir..
of Furniture for OR Living Shelter 20 Men FOR HOCHE, B Provn of Furniture for OR Living Shelter 20 Men FOR HOCHE, C Provn of Furniture for OR Living Shelter 20 Men FOR HOCHE, D Provn of Furniture for OR Living Shelter 20 Men FOR HOCHE, E Provn of ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ... of Fire Alarm System ...
Standalone PC, ADN PC, Visualizer, Projection System Projector and Screen, Networking Switching Control Equipment and Matrix Switcher, Podium with Integrated Control and Annotation, Biometric System Dual Factor, Mobile Jammer, CCTV System, Fire Alarm System, Online UPS 5 KVA
Water Bottel Plastic 20 Ltr, Cello Water Camper 10 Ltr, Water Dispenser, Box Steel Medium Size, Fire Extinguisher 2 Kg, Paper A4 Size, Paper Legal Size, Color File Cover, White File Cover, Register 350 pages BOQ Title BOQ BASSED BID
Provn of Cook House Dinning Hall Shelter Parts Only FOR GELEMO, Provn of Cook House Dinning Hall Shelter Parts Only FOR TAKSING, Provn of Constr mtrl for Cook House Dining Hall and Internal Pathway 18.00 into 2.00 mtr FOR GELEMO, Provn of Constr mtrl ... and Fire Alarm System ... and Fire Alarm System ...
Superstructure including foundation Electric Fittings Fire Alarm System Furniture and Misc items, And other all specification as per RFP, And all other specification as per RFP, All other specification as per RFP, Bal all other specification as per RFP