Loading…
Loading…
2,283 results • Best match
ATASEE Portable Fire Extinguishers (V3) ISI Marked to IS 15683, ATASEE Portable Fire Extinguishers (V3) ISI Marked to IS 15683 Carbon dioxide 4.5 kg
GENERAL-Installation of Fire extinguisher at various courts - Thrissur-Installation of Fire extinguisher at special court SC-ST POA Act cases-General Electrical Work
Design,Supply,Installation,Testing,Commission of Semi Automatic Puzzle Parking Multi level Car Parking facility,Internal and External Electrical installations, Fire Alarm, Fire Fighting system with Sump,OHT,Landscaping and allied works
Purchase of 1500 Nos of Fire Fighting Suits
Purchase of 1600 Nos of Fire Fighting Suits
TURNKEY JOB OF FIRE FIGHTING FOR NAVY VESSELS
FIRE FIGHTING AMC WORKS AT HPCL KOZHIKODE DEPOT
re tender for HV AC and fire fighting
Non-Percolating Flexible Fire Fighting Delivery Hose (Q3)
MOEI AND FANS I/C RMO OF SUB STATION EQPT, WATER SUPPLY PUMP SETS, LIFT, FIRE ALARM AND FIRE FIGHTING EQPT, VRF TYPE AC UNITS, CCTV SYSTEM, UPS, STREET LIGHTS ETC AT EXPORT INSPECTION AGENCY, PANAMPILLY NAGAR, KOCHI DURING 2025-26
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF FIRE ALARM SYSTEM AT FACT COCHIN DIVISION, AMBALAMEDY
DEPOSIT-Regional Institute of Ophthalmology, TVM - Refilling of fire extinguishers along with supply of new extinguishers at New and Old buildings Refilling and supply-Electrical Fire Fighting Work
Procurement & Installation of Hooter, Manual Call point & Smoke detector in existing Fire Alarm Syst
COST OF FIRE PROTECTION WORKS AT PAMBA DAM TO KFDC BOUNDARY OF GAVI FOREST STATION IN VALLAKKADAVU RANGE
1.Electrification 2.160 KVA Unitised Outdoor Substation 3. Electrical Fire Fighting Work 4. Electrical AC Work 5. SITC of UPS
NEWAGE High Pressure Fire Fighting Hose With Delivery Couplings, NEWAGE High Pressure Fire Fighting Hose With Delivery Couplings As Per Is 14933
NABARD-Infrastructure work in Taluk Hospital- Phase 2 - at Vaikom Kottayam- Installation of Fire fighting Equipment - Additional requirements -Electrical Fire Fighting Work
DEPOSIT_ANNUAL PLAN 2021_2022_Medical Education_Implementation of plan schemes_Govt Medical College_Ernakulam_Various Minor works_Revamping of fire fighting balance works at Govt_medical college_Ernakulam_Electrical Fire Fighting Work
DEPOSIT Urgent Maintenance and Servicing to the existing fire fighting installation at the old building General Hospital Pala Electrical Fire Fighting Work
GENERAL-CONSTRUCTION OF CLASSROOM BLOCK FOR G.M.L.P SCHOOL ANDATHODE IN PUNNAYOORKULAM GRAMAPANCHAYATH(FIRST FLOOR) Phase II-Fire Fighting-Electrical Fire Fighting Work
ESTIMATE FOR THE COSTS OF FIRE PROTECTION WORKS AT VARIOUS PLACES IN THEKKADY SECTIONS UNDER THEKKADY RANGE DURING 2019-20
ESTIMATE FOR THE COSTS OF FIRE PROTECTION WORKS AT VARIOUS PLACES IN MULLAKKUDY SECTION UNDER THEKKADY RANGE DURING 2019-20
ESTIMATE FOR THE COSTS OF FIRE PROTECTION WORKS AT VARIOUS PLACES IN EDAPPALAYAM SECTION UNDER THEKKADY RANGE DURING 2019-20
DEPOSIT-Deposit work -Providing Fire Hydrant at Maithanam, Varkala-General Civil Work
GENERAL-Kerala Rajbhavan - Servicing and refilling of fire extinguishers for the period from April 2023 to March 2024-Refilling of FIRE EXTINGUISHERS-General Electrical Work
SAFETY PLUS Portable Fire Extinguishers (V3) ISI Marked to IS, SAFETY PLUS Portable Fire Extinguishers (V3) ISI Marked to IS 15683 Foam based 9 litre
SAFETY PLUS Wheeled Fire Extinguishers (V3) ISI Marked to Is, SAFETY PLUS Wheeled Fire Extinguishers (V3) ISI Marked to Is 16018 Foam-based 45 litre
INSTALLATION OF FIRE ALARM SYSTEM AT FACT-CD, AMBALAMEDU
Supply installation testing and commissioning of Fire Alarm System.
Operation And Maintenance Of Fire Alarm System - Complete System
Operation And Maintenance Of Fire Alarm System - Complete System
GENERAL- Air Conditioning and Fire Fighting-Supply Installation Testing and Commissioning of Air Conditioning unit and Firefighting in SAT Golden Jubilee Third Floor attached to Govt.Medical College Thiruvananthapuram-Electrical AC Work-1
Supply, Delivery of Fire Safety Equipment
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire Extinguishers (V3) ISI Marked to IS 15683 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire extinguishers as per IS 15683 (2018) ( PAC Only )
Portable Fire Extinguishers (V2) ISI Marked to IS 15683 (Q2)
Foam Based Wheeled Fire Extinguishers as per IS 16018 (Q3)
Powder Based Wheeled Fire Extinguishers as per IS 16018 (Q3)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Powder Based Wheeled Fire Extinguishers as per IS 16018 (Q3)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)
Portable Fire Extinguishers (V2) as per IS 15683:2018 (Q2)