Loading…
Loading…
4,696 results • Best match
Operation of MEP System stage Craft AV system CCTV fire protection system BMS for Dhono Dhanyo Auditorium in Alipore Kolkata For 12 Twelve months
SUPPLY, INSTALLATION AND COMMISSIONING OF FIRE PROTECTION AND DETECTION SYSTEM AT MAYORS HEALTH UNIT AT 29/5 CHETLA CENTRAL ROAD, WARD 82 KOLKATA-700027
Operation of MEP System stage Craft AV system CCTV fire protection system BMS for Dhono Dhanyo Auditorium in Alipore Kolkata For 12 Twelve months
Supply, delivery, installation, testing, commissioning of fire protection and alarm system with wet riser arrangement at New Administrative Building at Barasat, 24 Parganas (N).
Providing attendance and maintenance work for fire protection system at Multi storied office building Bhabani Bhaban during the year 2022 23 One year only
Operation of MEP System stage Craft AV system CCTV fire protection system BMS for Dhono Dhanyo Auditorium in Alipore Kolkata For 12 Twelve months
Supply and installation of Fire Protection System Balance part at Kharagpur Sub-Divisional Hospital in the District of Paschiim Medinipur. RN16001020 Project ID HF232403867S000
Through repairing, renovation, strengthening and other allied works for up gradation to PWD standard of Panihati SGH, North 24 Parganas.Civil and Fire Protection work.
Repair and restoration of Fire Protection System and other allied works at State Govt Circuit House 9 by 1 Hunger Ford Street Kolkata-17
Annual maintenance contract for Fire Protection System at State Govt Circuit House, 9 by1, Hunger Ford Street, Kokata-700017 during the year 2023-24
Installation of fire protection and detection system at Newly Constructed Academic Building , Nursing Training School , Hostel etc. of Govt. College of Nursing , Purba Bardhaman.
Supply, installation, testing and commissioning of Fire Protection and alarm system at Chetla G plus12 Building, 44/A, Jainuddin Mistry Lane, Chetla, Kolkata- 700027
Repairing Of Fire Protection System at Asansol District Hospital In The District of Paschim Bardhaman Under Asansol Division, PWD During The Year 2026-2027.
Vertical extension of ANM(R) Training at 3rd floor within the premises of Vidyasagar S.G. Hospital, Behala.Civil, Internal Electrical Work and Fire Protection work.
Refilling, Servicing, and hydrostatic testing for the period of three (3) years at CSIR-IICB, Jadavpur and Salt Lake Campus.
Mobile Fire Safety Service Installation (with pump) at 4nos different GPs area of Bagnan-I Block Bainan and Subsit and Kalyanpur and Bakshihat, Howrah under BEUP
Fire fighting work for Blood Bank, Radio Therapy, Bijay Chand Mehtab Buillding, Psychiatric Building, P.P unit, MSVP Office, Isolation Word, Chest Building, Damador Canteen at Burdwan MCH, Purba Bardhaman Project ID HF252641750S000.
Construction of temporary water storage Vat/Reservoir with water supply arrangement to facilitate the fire fighting at Lot-8 Point in connection with G.S Mela 2023 under Diamond Harbour Sub, PHE Dte.
MANNING AND OPERATION OF E/M INSTALLATION FOR WATER SUPPLY AND FIRE FIGHTING AT DUMAYUNE AVENUE, TEESTA BLDG, DAMODAR COMPLEX, INS NETAJI SUBHASH AREA AND ALLIED ITEMS UNDER GE (I) (CGP) KOLKATA
Making Pandels, Decoration of Main Stage, Auditorium, Stalls, Pavilions, Installation and decoration of different Gates, Lighting and Sound System, Karigari Hat, Fire Fighting and Security Arrangements, Laser Show and other related works
Supply and delivery of Jockey pump motor set with accessories at Ganga Sagar Main Island and Installation of fire fighting pumping machineries at LOT8, Kakdwip in connection with Ganga Sagar Mela 2024
Supply of Specials for the Laying of new pipe line work at Fire Fighting Zone-I area in connection with G.S. Mela 2026 under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte.
Making Pandels, Decoration of Main Stage, Auditorium, Stalls, Pavilions, Installation and decoration of different Gates, Lighting, Sound, Karigari Hat, Fire Fighting, Security Arrangements, Laser Show and other related works, 6th JMU, Jhargram.
Supplying, Fitting, Fixing and Installation of different types of Fire Extinguisher to be installed at Newly Constructed 100 Beded SGH (Main Building only) at Sainthia under Birbhum Division, PWD during the year 2023-24.
Supply and Installation of Fire Extinguisher at Gargi Hostel Building Maitri Hostel Building Kitchen Cum Dinning Building Academic Building within the campus of GNM Training centre at Ranchi Road in the District of Purulia
ISI marked ABC stored pressure type 4 Kg. capacity fire extinguisher fitted with pressure indicating gauge with ISI marked mono- ammonium phosphate base powder pressurized by Nitrogen Gas complete with discharge hose and bracket
ReFilling and Reinstallation of various types portable Fire Extinguisher at Main Hospital building, OPD building Gynae building Matrima building PMSSY building at Gobindanagar campus of Bankura Sammilani Medical College and Hospital Bankura under B
Dr R Ahmed Dental College and Hospital New and Old Campus Supplying fixing and testing of Wall mounted Inverted Automatic Fire Extinguisher Clean Agent for CCTV Central monitoring room during the year 2025 2026
Refilling and Installation new fire extinguisher within the Different building _Main building, CMDA Building, OPD building, Blood Bank,Super office _ Ward Master office...etc_ of Uttarpara State General Hospital, Uttarpara Hooghly during the year
Day to day Operation Maintenance of internal external Electrical Installation including operation of pumps Diesel Generator Set 3 nos. Elevators Operation of Fire Detection system and Cleaning of Electrical Equipments Fixture other applia
Upkeepment and maintenance of electrical Installation (regular/periodical maintenance as well as preventive and corrective maintenance) including AC machine ,FDS,DG,at CMOH office Bishnupur _ Annual Maintenance of entire Fire Detection system, for
Remodeling and Renovation of State Emergency Operation Centre (SEOC) Of Disaster Management and Civil Defence Department at 2nd Floor, Nabanna- EI works, SITC of Split AC machines and installation of Fire Detection System
Urgently replacement of non-functional parts components incl. checking, testing, rectification, reinstallation and re-commissioning and annual maintenance of the existing Fire Detection an Alarming System at different buildings of Burdwan MCH Purb
Setting up of two(2) nos. dedicated Commercial Courts at 7th floor of City Civil Court Building, Kolkata ---------Electrical Renovation Work, arrangement of Air-conditioning, Fire Detection system, Modernization/ replacement of existing 2nos.
Annual Maintenance Preventive and Breakdown Contract of complete Electrical Installation including Sub Station and Annual ,Preventive and Routine on site maintenance of the complete Fire Detection system by engaging suitable qualified manpower at
Providing the manpower for electrical preventive and breakdown maintenance Day to day operation maintenance of entire electrical installations including Sub Station, compound lighting, DG operation, dusting and cleaning of fire detection sensors an
Annual maintenance of E.I. work and Fire detection with alarming system at Bishnupur Court and allied buildings (residential and non-residential) (for Preventive, Corrective and Breakdown) at Bishnupur under Bishnupur Electrical Sub-Division.
Construction of Proposed (G plush 3) integrated building of consumer Affairs department, Govt of West Bengal at Asansol in the district of paschim Bardhaman under Asansol Division, P.W.D..SITC of Fire Detection System.
Emergent repairing and renovation of Electrical Installation and Fire Detection work and Glow Sign Board at Singur Trauma Care Centre in the District of Hooghly... Electrical Installation Work and LED Glow Sign Board..
Necessary repairing and renovation of 3rd floor of HRBC Bhawan to accomadate office of the enquery Commission at Munshi Premchand Sarani,Kolkata-700021 during the year 2026-27-----SITCof Intelligent Fire Detection System.
Portable Fire Extinguishers (V3) as per BS EN Standards (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6599702 Dated : 04-09-2025 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 581000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this 2/13 Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : GM(MM)/HOD Eastern Coalfields Limited (A Subsidiary of Coal India Limited) A Government of India Undertaking Office of the Chairman-Cum-Managing Director, Materials Management Deptt - (Purchase) Wing, Sanctoria, PO- Disergarh, Distt- Paschim Burdwan, West Bengal (Pin No. 713333) (Eastern Coalfields Limited) Splitting
Construction of Temporary structure and Fitting, fixing Fire Hydrant Lending (FHL) Valve on the existing pipe line etc. including temporary special latrine and allied works for Chemaguri Point i.c.w Ganga Sagar Mela-2020 under Alipore Divn, PHE Dte
Erection of Fire Hydrant, Construction of New Street Stand posts ,repairing of 350 mmdi and 150 mm dia D.I pipe line etc at Zone-VI of Siliguri Municipal Water Supply Scheme under Siliguri W/S Scheme, P.H.E Dte.
Construction of Second and Third floor of Khadya Bhawan at Asansol for accommodating office of the DCF S in the district of Paschim Bardhaman,under Asansol division,PWD-SITC of fire alarm system.
High End Desktop Computer, Visual Presenters (V2), Multimedia Projector (MMP), Podium with Integrated control and Annotation, Networking switch control equipment and matrix switch, Biometric System (Dual Factor), Fire Alarm System, Online UPS (5KVA)
Annual Maintenance of E.I work at Main Hospital Building of Bankura Sammilani Medical College and Hospital , Bankura -----Arrangement of necessary UPS Battery protection work an Installation of Modular Fire Extinguishers at various location of BSMCH
Refilling, Testing and Necessary Repairing of Existing Fire Extinguishers including Supplying and Fixing Wall-Mounted Brackets within the Bishnupur District Hospital premises during the year 2025-26 under Bishnupur Division, P.W.D., in the district o
Emergent repair of firefighting system at Bhabani Bhawan Multi storied building Alipore during the year 2024 2025
Supply, delivery, installation, testing and commissioning of firefighting and protection system against auditorium under Budge Budge Municipality.
Wheeled Fire Extinguishers (V3) ISI Marked to Is 16018 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7071197 Dated : 05-01-2026 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No