Loading…
Loading…
1,293 results • Best match
Restoration of flood damaged road of namsang puberun gaon road,Labagkula to Naharjan road,Long-jong Kapahuwa,Tipam sripuria LP school, Tipam Bordubi, Kendukuri Post office
Recovery and Reconstruction of flood damaged to SH-18 (Kampur-Singimari-Baithalangso Segment) (28th to 35th Km) under NDRF (PDNA - 2022) for the year 2025-26.
Immediate Restoration of Flood Damaged road from Pratapganj Pesterghat to G.K. Road (Ch. 1350.00 m to Ch. 1935.00 m) under SDRF for the year 2021-22
Construction of Suklai L/B embankment at Bholajhar Kakatisupa.
Restoration of Flood damaged Road from Sundarpur to Santipur Jengrai Road Package No AS-04-228 under SDRF FDR for the year 2021-22 in 114 Jonai ST LAC under Jonai Territorial Road Division in Dhemaji District. Package No. JT/SDRF/2021-22/38
Restoration of dyke Flood protection and drainage of Bakrihaor area under Hailakandi Civil Sub Division on the left bank of river Borak including breach closing works.
Raising and Strengthening of Sumdiri left bank embankment from CH. 0m to 5150m including extension upto right bank embankment of river Subansiri at Sumdirimukh
Reconstruction of breached embankment at Kumarpara (Ch. 16800 m) including improvement of Nonoi R/B embankment from Ch. 4925 m to 24925 m under SOPD (FDR) for 2019-20
Restoration of damage embankment from Mohemari Gaon to Bantow Chamuah Pathar areas from the flood devastation of river Korha during 2022-23 on L/B embankment and Restoration of Sampora L/B embankment from Gurathali Chapori to Dhakuakhana PWD Road.
Permanent Restoration of flood damage of New Fekamari to South Bhurakata Road (Ch.6000.00m to Ch.7500.00m) under Reconstruction and Recovery Window (Assam Floods and Landslides 2022,PDNA) for the year 2025-26. Package No. SSDTRD_PDNA_11
A/E measures to protect R/B embankment at Monipurtup from the erosion of river Kollong
Bank protection measures to protect Tamarhat Bazar and its adjoining areas from the erosion of river Gangadhar on its L/B (Ch. 0.00 m to 725.00 m).
River bank protection/ erosion control measures on the left bank of River Subansiri between village Goraimari/ Bhimpara Pathar/ Bhimapara Chapori and Tinsukia (RD 22 km. - 23 km.)
River bank protection erosion control measures on the Left bank of River Subansiri adjacent to Balibheta goan in Gunasuti GP RD44.70 KM to 45.60KM 900m beyond 30KM
River bank protection erosion control measures on the Right bank of River Subansiri adjacent to Ghancharai U S of WRD works RD55.625KM to 56.125KM 500m Beyond 30KM
Restoration and improvement of Singra both bank embankment, Package 1
Construction of New Embankment from Chereng to Magurmari, Package 2.
Construction of Pagladia L/B embankment from Polokata to Balabari.
Construction of New Embankment from Chereng to Magurmari, Package 1
Restoration and improvement of Singra both bank embankment, Package 2
Raising and Strengthening of Singra both bank embankment (Package 4)
Construction of New Embankment from Chereng to Magurmari. Package 3
Reconstruction of breached embankment at Punia (Ch. 22700 m) including improvement of Nonoi L/B embankment (Ch. 10500 m to Ch. 24484 m) under SOPD-FDR for 2019-20
Immediate measures to recoup flood damaged crest and slope of PGJH from Ch.4775M to Ch.9900M and Ch.11000M to Ch.15000M under SDRF for 2019-2020.
Immediate measures for restoration of flood damaged river bank at Garmur and its adjoining areas (Balijokaibowa to Silakola)of Kherkotia river in Majuli for the year 2019-20
Construction of Road from Laomuri to No. 2 Gohain gaon at Naruwa Than Dhemaji Flood Damaged Portion under Thengal Kachari Autonomous Council Fund for the year 2017 18
Repairs and Restoration of Flood damaged Road from Kamchi to Jengrai Road via Goroimari Road Package No- AS-04-33 under SDRF FDR for the year 2021-22
Restoration of L/B embankment of river Pagladia by closing of breach at Hahkata including R/S of embankment with A/E measures at different reaches
Restoration of damage embankment from Mohemari Gaon to Bantow Chamuah Pathar areas from the flood devastation of river Korha during 2022-23 on L/B embankment.
Restoration of damage embankment from Mohemari Gaon to Bantow Chamuah Pathar areas from the flood devastation of river Korha during 2025-26 on L/B embankment.
Integrated River Bank Protection Work cum Horticulture Plantation for Ecological Balance vis-A-vis Livelihood Generation (Part I) at Harmudisa Village, Dima Hasao under SDMF during 2025-26
Integrated River Bank Protection Work cum Horticulture Plantation for Ecological Balance vis-A-vis Livelihood Generation (Part II) at Harmudisa Village, Dima Hasao under SDMF during 2025-26
River bank protection erosion control measures on the Right bank of River Subansiri adjacent to Kokatitup Downstream of 1 Nos Sumdiri RD 49.45KM to 50.35KM 900m beyond 30KM
Restoration of flood damaged road from Juria Pukhuri Achabam weekly Market Road, Umatra weekly Market to Staff Line Road, Dillighat Nepalijan Road, Betoni Bam Main road, Jungle Basti Road
Immediate Restoration of Flood Damaged road of Satrasal Jhapusabari-IV Road under SDRF for the year 2021-22 (Repairs to approaches of RCC Box Cell Culvert No. 1/1)
Restoration of flood damaged road from Jyotinagar Tiniali Kartik Tanti House to Bitu House,Tarani Pathar Nirmolia Chuk Road, Bhebela Path, Tokowbill to Mothawari , Uriamguri Mazdoor gaon to Silkoshubam
Restoration of Flood damage on road from Bilotia to Bonkowal (From Ch.3000.00m to Ch.6000.00m)under SOPD(FDR) for the year 2019-20under GSRD, Bokakhat under Bokakhat Territorial Road Division,Bokakhat. Pkg. No.SOPD(FDR)/BKTRD/01/RE
Restoration of right bank embankment of river Brahmaputra at Jarani area.
Extension of Gainadi R/B embankment from Ch.9100m to 10700m.
Construction of Suklai R/B embankment from Madalbari to Niz-Kuchula.
Restoration of Tikritola embankment on its L/B of Rowta river.
Emergency measures to protect Brahmaputra Embankment at Hatighuli, Phelai and Naokata.
Extension of Kumatiya right bank embankment from Balichapori to Hatigarh area.
Construction of Suklai L/B embankment from Pachim Naukata to Nathkuchi.
Restoration of Suklai R/B embankment at Bhola Batabari and Bholajhar.
Construction of Pagladia L/B embankment from Chapatal to G.K. Ali.
Construction of Embankment from Malbhug Tiniali to Tarimajgaon under SOPD-G.
Construction of embankment from Bera-Nagaon to Bhalukaguri under SOPD-G.
Restoration of damages to the right bank embankment of river Depota.
Reconstruction of breached embankment at Gobradal and Samatiapara alongwith improvement of Mora-Pagladia L/B embankment from 2.50 Km to 10.86 Km alongwith A/E measures at different reaches under SOPD-FDR for the year 2019-20