Loading…
Loading…
1,293 results • Best match
A/E measures to protect L/B embankment of river Puthimari at Dwigunpar including widening of embankment.
Restoration of R/B embankment of Suklai and breach closing at Bholajhar including R/S of embankment.
Construction of flood protection work along Mahur River (left bank) to protect Maibang Town under SDMF for the year 2024-2025.
Restoration of Puthimari L/B embankment of breach at village Balabari including R/S of embankment
Restoration of Puthimari L/B embankment of breach at village Balabari including R/S of embankment
Restoration of Puthimari L/B embankment of breach at village Balabari including R/S of embankment.
Immediate measures for flood damage restoration work at Pithaguri, 80 No. Solmari and its adjoining areas on R/B of river Dikrong under SDRF for the year 2021-22
Permanent Restoration of flood damage of Monjuri to Nizchirakhowa Road under Reconstruction and Recovery Window (Assam Floods and Landslides 2022, PDNA) for the year 2025-26. Package No. SSDTRD_PDNA_2
Restoration of flood damage of Jangal Chariali to Puthimari bazar road under Reconstruction Recovery Window (Assam Floods and Landslides 2022, PDNA) for the year 2025-26. Package No. SSDTRD_PDNA_4.
Construction of 4-lane Extradosed PSC Bridge over river Brahmaputra connecting Palashbari and Sualkuchi including Viaduct, Approaches and River Training works etc on EPC mode
River bank protection/ erosion control measures on the Left bank of River Subansiri adjacent to village Geriki 1 (RD 26Km - 27Km).
River bank protection/ erosion control measures on the Right bank of River Subansiri near village Bihidia (RD 25.65 Km to 26.35 Km).
Restoration of Flood damaged Road from Tako Village to Borong Charaibari from 3.71 to 3.85 KM Length 0.140 KM under SDRF FDR for the year 2021-22
Flood resilience through New embankment with RCC sheet at Noanodi B/B Embankment from Manitari to New B-dyke.
Restoration of puthimari R/B embankment and Closing of breach at Bagribariand Dholkuchi including R/S of embankment
Restoration of puthimari R/B embankment and Closing of breach at Bagribariand Dholkuchi including R/S of embankment.
Restoration of puthimari R/B embankment and Closing of breach at Bagribariand Dholkuchi including R/S of embankment
River bank protection/ erosion control measures on the left bank of River Subansiri adjacent to village Pamme (RD 25 Km to 26 Km).
River Bank protection /erosion control measures on the Left Bank of River Subansiri adjacent to village Gerki -2 (RD 29 KM. - 30 KM.)
Bank Protection Work at Moradiya FIS under State Disaster Mitigation Fund (SDMF) for the year 2023-24 under Tihu Division Irrigation Tihu Package_7
River bank protection erosion control measures on the Right bank of River Subansiri adjacent to Mahaijan Alengri RD42.75KM to 43.65KM beyond 30KM 900m
RE_RIDF-XXVII_Morigaon_01 Construction of Embankment cum Road on (Morigaon Town Protection embankment) Kollong river embankment (right) From Ch 0.0 M to 1690.00 M under RIDF-XXVII of NABARD for the year 2021-22
RE_RIDF-XXVII_Morigaon_03 Construction of Embankment cum Road on (Morigaon Town Protection embankment) Kollong river embankment (right) From Ch 2930.00 M to 4300.0 M under RIDF-XXVII of NABARD for the year 2021-22
Immediate Measures for restoration of flood damage of dyke along R/B of river Borak from Katigorah to Harinagar BOP Camp under SDRF for the year 2021-22 (Restoration of Madarpur area).
TN-236/2___Restoration Flood Damaged of Hortola Road (Ch. 3710.00m to Ch. 4130.00m and Ch. 5210.00m) under SOPD-FDR for the year 2019-2020
River bank protection n erosion control measures on the left bank of River Subansiri upstream of village Tinsukia RD 23 km to 24 km
River bank protection erosion control measures on the Left bank of River Subansiri adjacent to KalianiGunasuti GP RD41.65KM to 42.55KM 900m beyond 30KM
River bank protection n erosion control measures on the left bank of River Subansiri adjacent to village Tinsukia RD 24 km to 25 km
River bank protection/ erosion control measures on the left bank of River Subansiri adjacent to village Goraimari/ Bhimpara Pathar (RD 21 km. - 22 km)
River bank protection erosion control measures on the left bank of River Subansiri downstream of village Geriki 1 RD 27 km to 28 km.
River bank protection/ erosion control measures on the left bank of River Subansiri upstream of village Goraimari/ Bhimpara Pathar (RD 20 km. - 21 km.)
Bank Protection Work at Barpeta ELIS (Hariharghat Point) under State Disaster Mitigation Fund (SDMF) for the year 2023-24under Tihu Division Irrigation Tihu Package_5
River bank protection erosion control measures on the Right bank of River Subansiri downstream to Sonowal gaon beyond 30KM RD 36.13KM to 37.13KM 1000m
Reconstruction of breach embankment providing back berm to R/B embankment of river Barnadi from Suktaguri to Lenga including A/E measures at Kalitapara, Mandakata and Alta area.
Reconstruction of breach embankment providing back berm to R/B embankment of river Barnadi from Suktaguri to Lenga including A/E measures at Kalitapara, Mandakata and Alta area.
Restoration of flood damage for PDNA 2022 - Procurement of GeoTube, Porcupine members, Geo Bag Type A,Geo Bag Type B, Geo Sheet, Wire Netting Boxes, Sewing Thread under Jorhat W.R. Division. Package 2
Restoration of flood damage road from Naskara to Namashersow road via Fakirganj Sonali Maket (Reconstruction of SPT Br. No. 1/1) including approach under SDRF for the year 2020-21. Package No. SDRF_GSSRC_10
Construction of road cum embankment of Dikrong Right Bank embankment from Railway guidebund to Madhupur Ch 1700.00m to 4700.00m under RIDF-XXVII of NABARD for the year 2021-22 in Nowboicha LAC
Restoration of damaged embankment of Damaged of B/Dyke on R/B embankment of river Brahmaputra in between Ch.0.00km to 6.80km.
Bank Protection Work at Bajali ELIS (Choudhurypara Point) under State Disaster Mitigation Fund (SDMF) for the year 2023-24 under Tihu Division Irrigation Tihu Package_4
Bank Protection Work at Bajali ELIS (Kaharpara Point) under State Disaster Mitigation Fund (SDMF) for the year 2023-24 under Tihu Division Irrigation Tihu Package_3
River bank protection erosion control measures on the Left bank of River Subansiri adjacent to Na-ali RD 60.10km to RD 61.00km 900m Beyond 30km
Immediate measures for restoration of flood damage of dyke along R/B of river Borak from Gonirgram to Katigorah under SDRF for the year 2021-22 (Restoration of breach like damages at Mohadevpur area).
Restoration of flood damage for PDNA 2022 - Procurement of Geo Tube, Porcupine members, Geo Bag Type A, Geo Bag Type B, Geo Sheet, Wire Netting Boxes, Sewing Thread under Jorhat W.R. Division. Package 1
Comprehensive maintenance to IBB Road ID 84 85 and 86 under Karimganj Sub-Division in Assam sector during 2022-23 2023-2024 and 2024-2025 SH Ordinary repair Bridge repair and Flood damage repair
Detailed Geotechnical Investigation of Railway Embankments and Associated Structures Between Ch. Km 116.100 and Km 124.830 for the Jiribam-Imphal New BG Line Project.
Detailed Geotechnical Investigation of Railway Embankments and Associated Structures Between Ch. Km 116.100 and Km 124.830 for the Jiribam-Imphal New BG Line Project.
Detailed Geotechnical Investigation of Railway Embankments and Associated Structures Between Ch. Km 116.100 and Km 124.830 for the Jiribam-Imphal New BG Line Project.
Restoration of flood damaged of road from BMR village to Bezisuti Bazar road under SDRF for the year 2020-21 (Repairs of SPT Bridge No. 3/1 with earth work and gravelling)
Reconstruction of breached embankment at Punia (Ch. 22700 m) including improvement of Nonoi L/B embankment (Ch. 10500 m to Ch. 24484 m) under SOPD-FDR for 2019-20