Loading…
Loading…
1,293 results • Best match
Restoration of flood damaged road from Ramfalbil to Athiabari PMGSY Road Bridge No.2 at Kapurgaon (Br. No.2/1 and 3/2) under SDRF for the year 2021-22 of Kokrajhar District, Assam (LAC-30 th Kokrajhar East (ST), Package No.176_1
Reconstruction of Flood Damaged Rajgarh Road to Noya Ghogra by Gravel Wearing Course (GWC) under SOPD-G for the year 2025-26 under Gohpur Civil Sub Division Territorial Road Division of Biswanath District. Gohpur LAC. Package No. SBRC/GOH/2025-26/04
Restoration of flood damaged road from Mothambil and Nasraibil to Dolgaon Road under SDRF for the year 2021-22 (Providing Earth work and GSB Works from Ch.350.00m to 1050.00m including construction of 3x3-5 Cell RCC Box Culvert).Pkg No.178_5
Restoration of flood damaged road from Asomia Gaon Homobai homiti road to Asomia Gaon ,1 no balijan gaon to Naharkatia TE sub staff quarter road in balimora GP, Dighola Sonwal to Teli Basti,Rangonibam LP School to Madan tinali in Nigam GP
Restoration of flood damaged roads in stretch ID 85 in between AOR of BOP Bilbari and Sonatola and ID 86 in between AOR of BOP Lakhipur and Mukamtila of 134 Bn BSF in the State of Assam along Indo Bangladesh Border IBB
Reconstruction of flood damaged Sandha Satra Road under SOPD -FDR
Reconstruction of Flood damaged road in Titabor LAC (Gar-Ali)
Reconstruction of flood damaged Dhamdhama Barkhat Road under SOPD -FDR
Reconstruction of breach embankment at Ch. 190 m to 250 m including improvement works at Kurua ring bund
A/E measures to protect Kopilli left bank embankment at South Ghilani area from the erosion of river Kopilli.
Breach closing works on L/B embankment (DRDA Bund) of river Buradia at Amoni Smashanghat, Gathanorkhat and Hatipota areas.
Construction of embankment cum Road on Disam Bund from Disam Borbil to Dhaman Kenduguri (L/B) under RIDF-XXVII of NABARD for the year 2021-22 (Tingkhong LAC)
Construction of Road Patsaku to Disangpani Embankment cum road of Disang river including protection work from Ch. 660.00m to Ch. 8860.00m (L- 8.20 Km) under RIDF-XXVII of NABARD for the year 2021-22
A/E measures to protect Kopilli left bank embankment at Pub-Darrangi Gaon area from the erosion of river Kopilli.
Construction of embankment from Kollonga to Phangtengprang area on R/B of the river Kollonga in West Karbi Anglong District.
Construction of embankment from Kollonga to Chomkan area on L/B of the river Kollonga in West Karbi Anglong District.
Construction of new embankment on left bank of Sessa river from Sessa PWD bridge to PWD Road at Phuta-Bhog.
Immediate measures to restore L/B embankment of river Puthimari at Azara area under SDRF for the year 2020-21.
Construction of Paver Road on the embankment for movement of heavy motor vehicles leading from FSTP to Gerons project site.
Restoration of Damaged L/B Embankment of River Nonna in between chainage 5th km to 7th km at Tokankata Area.
Slope protection of embankment and outlet channel with Geo-bag at U/S and D/S of Potia Sluice gate.
Immediate measures for recoupment of damaged embankment at Tikritola village from River Rowta under SDRF for the year 2019-20
Construction of new embankment from Bukagaon to Mansiri outfall of river Jiabharali on its right bank including A/E measures.
Raising and Strengthening of Jiadhal R/B embankment from Avoipur to Holodonga along with A/E measures at different reaches
Immediate measure to Brahmaputra Embankment at Naokata area from the flood damages of river Brahmaputra (Ananta Nallah) for 2024-25.
Construction of embankment by widening the Kakodunga bund LB from Borholla to Barbaruah Ali including excavation of the Singijan Channel.
Construction of Flood Embankment on Right B ank of River Pokoria from Tetliguri to Patekibori.(Ph II)Package No. 02
M and R to Kopilli R/B embankment from Mantabori to Railway Bridge at Dipsing for the year 2025-26.
Extension of Gainadi L/B Embankment from Somanigaon to Amguri PWD Road (Ph-I) from Ch.6200m to 10410/4210m.
M and R to protect Kollong right bank embankment at d/s of Patrabori sluice for the year 2023-24.
Immediate measures for restoration of Khaloibeel area on the right bank embankment of river Jiabharali under SDRF for 2021-22.
M and R to restore erosion of river Puthimari at different reaches of Puthimari B/B embankment for 2024-25.
Immediate measures for recoupment of the right bank embankment of river Belsiri at Benchimari area under SDRF for 2019-20.
Widening and strengthening of Kakoi Right Bank embankment from Lilabari T.G. to Kadam including A/E works at different reaches.
Construction of Flood Embankment on Right B ank of River Pokoria from Tetliguri to Patekibori.(Ph II)Package No. 01
Extension of Gainadi L/B embankment from Sumonigaon to Amguri PWD Road (Ph-II) along with 4 shutter sluice.
Extension of Gainadi L/B embankment from Sumonigaon to Amguri PWD Road (Ph-II) along with 4 shutter sluice.
Reconstruction of breached embankment at Roypur including protection works on Dyke along L/B of Borak from Masimpur to Katakhal.
Construction of embankment cum road on Rangamati to Kurua Brahmaputra Dyke(From Ch. 10150.00m to 12650.00m and 13500.00m to to Ch. 15000m) under RIDF -XXVII of NABARD for the year 2021-22 under Sipajhar LAC, RE/RIDF-XXVII/ Sipajhar /1
Rest. of flood damaged road from Kachugaon Sonkosh Road to Dumbazar via Pokalagi Road (Eroded at Ch.450.00m to Ch.650.00m, resurfacing from Ch.0.00m to Ch.800.00, providing GSB from Ch.800.00m to Ch.2500.00m) under SDRF for the year 21-22.Pkg.176_6
Construction of Road cum Embankment of B/dyke from Mukaloni to Jhanjimukh road, from Ch. 0.00 M to ch. 7000.00 M (L- 7.0 Km) under RIDF-XXVII of NABARD for the year 2021-22
Construction of road from Baralia Embankment to Digara Garamsung under SOPD (G) for the year 2025-26 Pkg no. NKTRD(R)/ SOPD(G)/ 2025-26/07
Construction and shifting of HT and LT line along with dismantling works due to construction of embankment from Dighaliati to Khatobori.
Restoration of damaged section of Kumatiya Left Bank Embankment from Ch. 10700 m to 11825 m during the flood of 2022.
Protection of flood embankment along Kollong river from Azarbari to Rly Bridge(L/B) in between Ch. 8.50Km to 10 Km
Construction of new embankment from Batachara to Barama NH-27 crossing on R/B of river Mara Pagladia including protection work.
I M to restore R/B embankment at 4th km of river Hajo suti at Kajibari under SDRF for 2019-20
Widening and strengthening of Subansiri R/B embankment from 37th Km to 41st Km including construction of causeway in Mudaibeel area.
Restoration of damaged embankment of river Noona and river Pagladia during the flood of 2022 (procurement of supply materials). Package 1
Construction of new embankment on both bank of river Pohumara and Anglisiga along with protection work at different reaches, Package 3.