Loading…
Loading…
1,293 results • Best match
Reconstruction of Breached embankment at Dullavpur and Mukamerbond along with improvement ofShingla R/B embankment from Phanirbond to Dullavpur including anti-erosion measures at differentreaches.
Reconstruction of Breached embankment at Dullavpur and Mukamerbond along with improvement ofShingla R/B embankment from Phanirbond to Dullavpur including anti-erosion measures at differentreaches.
Anti erosion measures to protect the left bank at the intake point for water supply project by Tata Semi-Conductor Test and Supply Pvt. Ltd at Hatiamukh area from erosion of river Kopilli.
Reconstruction of Breached embankment at Dullavpur and Mukamerbond along with improvement of Shingla R/B embankment from Phanirbond to Dullavpur including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
RIDF-XXVII/Golaghat/08 Extension of RCC Br. No 5/1 over river Dhansiri on Morongi Ali including anti-erosion measures of bridge approach from river Dhansiri under RIDF-XXVII for the year 2021-22
Restoration of Flood damaged section of different embankment ( Procurement of Geo Tube ).
Restoration of flood damage of embankment along the left bank of river Longai at different reaches.
RESTORATION OF FLOOD DAMAGE OF EMBANKMENT ALONG THE RIGHT BANK OF RIVER LONGAI AT DIFFERENT REACHES.
Restoration of R/B embankment at 1st km of Balipara from the flood damage of river Noona.
Closing of breach at 7th Km and strengthening of Bhogdoi left bank embankment from Garumara grazing to Chengeliati including anti erosion measures at different reaches.
Closing of breach at 7th Km and strengthening of Bhogdoi left bank embankment from Garumara grazing to Chengeliati including anti erosion measures at different reaches.
Closing of breach at 7th Km and strengthening of Bhogdoi left bank embankment from Garumara grazing to Chengeliati including anti erosion measures at different reaches.
Restoration of flood damage for PDNA 2022 along Hatilung R/B embankment from CH 795m to CH 4,805m.
Restoration of flood damage for PDNA 2022 along Kakoi R/B embankment from Ch. 8,210m to Ch. 9,500m.
Restoration of flood damaged embankment at different reaches on the L/B of river Kushiyara.
Restoration of flood damaged embankment at different reaches on the L/B of river Borak.
RESTORATION OF PAGLADIA L/B EMBANKMENT FROM THE FLOOD DAMAGE AT NAKHAT AREA(Ch 4th Km) INCLUDING A/E WORKS
RESTORATION OF PAGLADIA L/B EMBANKMENT FROM THE FLOOD DAMAGE AT KEHERUA AREA (CH 8TH KM) INCLUDING A/E WORKS.
RESTORATION OF NOONA R/B EMBANKMENT FROM THE FLOOD DAMAGE AT SATHAMOU AREA (CH 7th KM) INCLUDING A/E WORKS.
Quotation for Supply of Flood Relief Materials
RESTORATION OF NOONA R/B EMBANKMENT FROM THE FLOOD DAMAGE AT SATHAMOU KATURIA AREA(CH 8th KM) INCLUDING A/E WORKS.
Thengal Gaon River Training Golaghat
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of Breached embankment at Kabaribond village along with improvement of Longai L/B embankment from Ch. 0 to 21.95 KM including anti-erosion measures at different reaches.
Reconstruction of flood damage stretches of LBP Road
Closing of breach at 7th Km and strengthening of Bhogdoi left bank embankment from Garumara grazing to Chengeliati including anti erosion measures at different reaches.
River training works along with construction of new embankment and A/E measures to resolve perennial flood inundation problem of Singra river at Gelahati area.
Modarkhat River Training Project under RIDF-XXX
KHERKATI RIVER TRAINING PROJECT AT RATANPUR MIRI
KAILYANPUR RIVER TRAINING PROJECT UNDER RIDF XXV
Immediate measures to flood damage restoration of Kallong L/B embankment from Baghjap to Genesh Hill at Amara Pathar and its adjoing areas under Sonapur revenue circle under SDRF
Anti-erosion measures to protect Pub-Makeli area on the right bank from erosion of river Kulsi
Immediate measures for restoration of flood damaged on R/B embankment of river Pohumara at 7th Km Pachim Kolorguri under SDRF for 2019-20.
MORA PAGOLDIA RIVER TRAINING PROJECT UNDER RIDF-XXVI
Kaldia River Training cum Boulder Pitching Project ,Dubargaon
Restoration of Flood damage road 3 no kenduguri nepali gaon road
Closing of Avulsion Channel of River Jiadhal on its L/B by constructing Embankment along with bank protection works in the breach portion including Channelisation
River Training Project at Kathaldia Part-III, RIDF- XXVII
MONGLAJHORA RIVER TRAINING PROJECT 2023-24 AT VILLAGE JOLAIGAON
Pohumara River Training Project (Boulder Pitching Work) at Koragari
Nala River Training Project 2021-22 at Village Beltari
Sindrinala River Training Project 2022-23 at village Bollamjhora.