Loading…
Loading…
1,293 results • Best match
Anti erosion measures to protect the village Balajan near Bodoland University campus from the erosion of river Gaurang on Left Bank.
Anti erosion (A/E) measures to protect the Kulshi river of Bholabari area under SOPD-G for the year 2022-23.
Anti-Erosion cum Water Conservation Measures at Neularbhita, Eratari and Era Kacharipara village of Barpeta District, RIDF-XXVIII DURING 2022-23
Anti erosion measures to protect Nehru H.S. School and its adjoining areas from the erosion of river Dikrong on R/B.
Anti erosion measures to protect village Kurshakati and its adjoining areas from the erosion of river Guruphella on its R/B.
Anti erosion measures to protect most vulnerable reaches of river Gangadhar on its both banks under Dhubri District. Package 2 RETENDER
Anti erosion measures to protect Biswanath Ghat, Sanyashi Gaon and its adjoining areas from the erosion of river Brahmaputra Ph-I
Strengthening of both bank embankment of river Gabharu at different inadequate sections and Anti-erosion measures at Kalakuchi and Ghatua on R/B and L/B From the erosion of river Gabharu.
Anti Erosion measure to protect Baligaon near Mugasong L. P. School from the erosion of river Kopili in West Karbi Anglong District.
Anti-erosion measures to protect Achera Kata, Gowalbari, Baligaon, Dafalakata and Balibheta and its adjoining areas from the erosion of river Subansiri.
Anti erosion (A/E) measures to protect Golondi river on its R/B at Kathalguri village and Dandupur area in Udalguri district.
Anti-erosion measures to protect D/S area of Tangabari village from the erosion of river Jilling for the year 2025-26
R/S of Dhansiri bund from Panjan to Barpathar and Dowel bund at Old Komargaon including anti-erosion measures at different reaches.
Anti-erosion measures to protect Pabhakati/Garubandha area from erosion on the left bank of river Brahmaputra (Re-Recast) (Sub-Estimate) RETENDER.
Anti erosion measures to Dyke along L/B of Borak from Uttarkrishnapur to Tarapur (Railway gap portion) at down stream of Annapurnaghat
Anti-erosion measures to protect village Simlabari F V and its adjoining areas from the erosion of river Sonkosh on L/B.
Anti erosion measures to Protect the D/S of Panchgram petrol Pump from the erosion of river Borak on its L/B.
Anti erosion measures to protect Nawarbhita (D/S)village and its adjoining areas from the erosion of river Longa on R/B.
Raising and strengthening of Darika bund left bank from Bahgarh to AT road including anti-erosion measures at different reaches (Ph- II).
Anti-Erosion measures to protect Laibeel area of Dehing bund L/bank from Joongaon to Laibeel from the erosion of river Dehing.
Anti erosion measures to protect at Santinagar WNo.1 Ram Mandir on its adjoining area of river Gaurang on LB in Kokrajhar district
Anti-Erosion Measures to Protect of new Law College at Chiripool near Lakhipur from the erosion of river Chiri on its R/B.
Anti-erosion measures to Tengakhat bund section -III on R/B of river Buridehing up to Jokai R.F. at 11th and 12th km
Anti-Erosion Eeasures to Protect Lallangkitta Laboc Par Part-II near Pailapool area from the Erosion of River Chiri on its R/B.
Anti-erosion measures to protect Katha Kakharani, Kotha Sema, Kotha Adarsha and its adjoining areas on both bank from the erosion of river BuriDehing.
Anti Erosion (A/E) measures to protect the Dhansiri River on its L/B at No.2 and 3 Rangapani area in Udalguri district.
Breach closing works on the right bank ring bund of river Subansiri including anti-erosion measures at Pomua Khaboli area for the year 2024-25.
Anti Erosion (A/E) measures at different reaches at Harizon Basti (Kadamtala) area from River Kawadanga on its R/B for the year 2025-26.
Anti Erosion (A/E) measures to protect Golondi river on its R/B at Kajiya mati Barigaon, Daifam barigaon and Hazaragaon area in Udalguri district.
R/S of R/B embankment of river Kopilli from Kharikhana to Jugijan (1.50 km to 13 Km)including permanent breach closing work at Dakhin Laskar pathar (ch. 10800m) and anti erosion measures at different reaches.
R/S of R/B embankment of river Kopilli from Kharikhana to Jugijan (1.50 km to 13 Km)including permanent breach closing work at Dakhin Laskar pathar (ch. 10800m) and anti erosion measures at different reaches.
R/S of R/B embankment of river Kopilli from Kharikhana to Jugijan (1.50 km to 13 Km)including permanent breach closing work at Dakhin Laskar pathar (ch. 10800m) and anti erosion measures at different reaches.
R/S of R/B embankment of river Kopilli from Kharikhana to Jugijan (1.50 km to 13 Km)including permanent breach closing work at Dakhin Laskar pathar (ch. 10800m) and anti erosion measures at different reaches.
Anti-erosion measures to the dyke along L/B of river Sonai from S. M. Road to Dharmikhal (Restoration of damages at Jamalpar) Ph.-I
Anti-erosion measures to protect Sahabad Rongpur village area from the erosion of river Katakhal on its L/B Ph-II (Under C M special package)
Anti-erosion measures to protect Kordoiguri area from Tamuligaon to Bagjan Gaon and its adjoining areas from the erosion of river Brahmaputra (Ananta Nalah) Ph-I
Anti erosion measures to protect Baka Shyam Ghat Radha Gobinda Mandir at Sapatgram and its adjoining areas from the erosion of river Loska on its RB.
Anti-erosion measures near Numaligarh Refinery to safeguard the new Raw Water Intake Well to be constructed and adjoining areas in the L/B of River Dhanshiri
Anti erosion measures to protect Hatipota, Kathaldi, Kazaikata, Nayaralga village and its adjoining areas from the erosion of river Gaurang on its R/B (Phase-II). PACKAGE 2
Anti Erosion measures at right bank of Dikrong river in between 1st km and 3rd km to protect Madhupur and Dahgharia area from the erosion of river Dikrong.
Anti erosion measures to protect Hatipota, Kathaldi, Kazaikata, Nayaralga village and its adjoining areas from the erosion of river Gaurang on its R/B (Phase-II). PACKAGE 1
Anti erosion measures to protect village Kachugaon Rabhapara and its adjoining areas from the erosion of river Kujia on left bank under SOPD G for the year 2022-23.
Anti erosion measures to protect Jhanji bund left bank at Bora Gaon, Sensuwa gaon area, Gayan gaon, Dhemaji gaon area and Hatimuria area near RCC bridge of Dhudor Ali.
Construction of retirement embankment in the breach portion and improvement of Borghuli Ring bundincluding anti erosion measures
Construction of retirement embankment in the breach portion and improvement of Borghuli Ring bundincluding anti erosion measures
Construction of retirement embankment in the breach portion and improvement of Borghuli Ring bundincluding anti erosion measures
M and R for Anti-erosion and River Stabilization of Kundil River through Porcupine Screens and Strategic Dredging Operations at Na- Lakhimipuria area of Sadiya Co-District for 2024-25.
Anti-erosion measures to the dyke along L/B of river Sonai from S. M. Road to Dharmikhal (R/B of river Rukni) restoration of damages at Malugram Ph-I
Repairing Guide bundh and de siltation work s at Tipomia River phase I phase II and Agriculture bundh cum anti erosion work at Domjan Tanti Basti and adjoining areas Samoguri Jorhat
Anti-erosion measures to the dyke along L/B of river Sonai from S.M. Road to Dharmikhal of (R/B of river Rukni) (Restoration of breach like damages at Malugram)Ph-II.