Loading…
Loading…
5,734 results • Best match
Improvement to Saline embankment from Badapal to Nagarighat saunlia right from RD 7.500Km to 9.00Km
Restoration to Mahanadi right embankment (Teremanapur Gherry) from RD.0.00 Km to RD.2.60 Km
Protection to scoured bank of Kandal Left Embankment from RD 8.790 Km. to 8.830 Km.
Improvement to Luna left embankment between RD 23.00 km to 24.00 km near village Badabali
Improvement to Mahanadi left embankment between RD 13.30km to RD 14.40km from Olagada to Tartol
Improvement to service road on KSDR Embankment from RD 41.100 Km. to RD 42.00 Km
Construction of bed bar in KSDR Embankment at RD 39.450 Km. and RD 39.500 Km
Improvement to Chhanchina Dia Deuli Bajarpur Saline Embankment From RD 11.00 km to 11.500 km.
Restoration to Devi Right Embankment from RD 1.00 Km. to 1.200 Km. near village Sudhasailo
Improvement to saline embankment on Erasama Nagarighat from RD.1.380 Km to RD.3.700 Km.
Protection to scoured bank of CE No. 78(A) on Mahanadi right embankment near Barda
Restoration to Brahmani right Embankment from Kharipadia to Gokha Sahi under NABARD Assistance RIDF-XXV
Restoration to C.E No. 78 (A) of Mahanadi right embankment from RD 11.00Km to 11.870Km
Construction of service road from Balitutha Bridge to Barunipadia on Fatepur to Guamaunda saline Embankment
Restoration to Spur at RD 25.100 Km. and at RD 25.200 Km. on KSDR Embankment
Protection to scoured bank of Devi left embankment from RD 61.700 Km to 61.820 Km
Protection to scoured bank of Devi left embankment from RD 62.600 Km to 62.720 Km
Protection to scoured bank of Devi left embankment from RD 55.400 Km to 55.520 Km
Protection to scoured bank of Devi left embankment from RD 54.800 Km to 54.920 Km
Construction of R.C.C. Guard wall on Southkania left embankment at RD 2.800Km. Near village Jaukhia.
Restoration to Daya left embankment from RD 2.00 km to 2.30 km (Launching and packing)
Protection to Daya Right Embankment from RD 26.500 Km. to 26.630 Km. near village Rengala
Protection to Brutanga left embankment near village Khajudi for 2023-24 (WRD 1300m to 1500m)
Repair and Restoration to Jappabhuyan to Bhobei Saline Embankment from RD 20670.00M to RD 22094.00M
Improvement to road erasama Nagarighat saline embankment from RD 3.750km to RD 4.60km near Sahadabedi
Construction of Drainage Sluice on Hansua right embankment at RD 12.100 Km near village Atamula
Construction of spur No. CE No. 78(A) on Mahanadi right embankment near RD 38.00Km
Construction of toe wall with strengthening to KSDR Embankment from RD 59.85 to 60.20 Km
Widening and strengthening of Biluakhai left embankment from RD 18.065 to 19.565 Km near Krutibasapatana
Protection to scoured bank on Devi left embankment, providing 3 Nos. spur near village Barakolinasi
Restoration of Mahanadi left embankment from RD 2.30Km to 2.72Km at village Madhapur Diha Palanda
Restoration to Sukapaika right embankment near Tatalapada and construction of guard wall of Talapada syphon
Restoration of Kathilagotha saline embankment from RD 0.00km to 0.60km near village Ujala Gopinathpur
Restoration and protection to embankment of Salia River link channel at Gambharimunda of Banpur
Raising and strengthening of embankment with construction of sluices
DESILTING, CLEANING GRASS AND SHRUB JUNGLE WITH BANK PROTECTION WORK FROM RD 1820 M TO 2120 M, 3695 M TO 4877 M, 4937 M TO 5200 M AND 5500 M TO 6750 M OF NAHANGA DISTRIBUTARY.
DESILTING, CLEANING GRASS AND SHRUB JUNGLE WITH BANK PROTECTION WORK FROM RD 100 M TO 510 M, 580 M TO 787 M, 855 M TO 1415 M AND 1830 M TO 3750 M OF BAGHUA DISTRIBUTARY.
Restoration and protection work to saline embankment
Road improvement work of river embankment
Restoration of spur No.1 at RD 66.480 Km near village Garoi on devi left embankment
Strengthening to embankment of Damaranalla from RD 2700 m to 3200 m under Daha Irrigation Project.
Repair to bridge over HLC range-1 embankment to Immamnagar road for the year 2025-26
Protection of embankment at erosion prone area with sand bags at Garjanbahal OCP under Basundhara Area
Strengthening of Embankment with protection wall raising of key wall including stone pitching of JRMC systems.
Improvement to Malaguni Left Embankment from Golabai to Atharabatia Working RD.0.0 Km to 3.25 Km
Protection to Bareni Padia on Mahanadi Left Embankment near village Berhempur for the year 2020-21
Improvement to Genguti left embankment from Express Highway to Railway bridge for the year 2022-23
Improvement to Nuna right embankment from village Kanibanka to Baspur Bridge for the year 2021-22
Protection to scoured bank on Birupa right embankment near village Laptuan for the year 2020-21
Protection to Scoured bank on Genguti right embankment near village Achhutabasanta for the year 2020-21