Loading…
Loading…
5,737 results • Best match
Raising, strengthening of River embankment
Raising, strengthening of River embankment
Protection work of flood Embankment
Restoration and protection to embankment
Restoration and protection to embankment
Raising and Strengthening of embankment
Restoration and Protection to embankment
Slope protection of flood embankment
Restoration and Protection to embankment
Raising and Strengthing of embankment
Raising and strengthening of embankment
Raising and strengthening of embankment
Improvement to canal embankment road
Restoration and Protection to embankment
Restoration and protection of Embankment
Restoration and protection of Embankment
Raising, strengthening of River embankment
Restoration and protection of Embankment
Restoration and protection of Embankment
Restoration of flood embankment work
Restoration and protection of Embankment
Restoration and protection of Embankment
Raising and Strengthening of embankment
Restoration and protection to embankment
Strengthening and raising of embankment
Raising and strengthening of embankment
Restoration work to saline embankment
Restoration and Protection of embankment
Improvement such as widening and Strengthening of Canal embankment road Byree Chandikhole Irrigation Office from 6/600Km to 14/000 Km in the district of Jajpur under State Plan for the year 2022-23
Construction of paver road and drain from Safiruddin Khan house towards Sk Gulam Mustafa and Sk Rouf and Saifu Khan house and Famida Khatoon house towards River embankment at Nanghamohalla in Ward No.14
Improvement of Ankula-Panikoili road via Nuapada-Trilochanpur, Adanga-Budhaghat (TRE) Budha Right embankment and Adanga-Mokeipur road from 0/000 km to 15/218 km in the district of Jajpur under State Plan
Improvement to Bhargavi Left Embankment from RD.16.00 Km to RD.18.00 Km and 34.00 Km to 37.00 Km (Working RD.16.40 Km to RD.18.10 Km and RD.34.20 Km to RD.36.80km)
Shifting of Utility (Water Supply pipe lines) for widening and strengthening of Taladanda Canal left embankment road from Nayabazar Junction to SH 12 (from 5/130km to 6/730) under WATCO Section, Nayabazar, Cuttack
Protection to Scoured Bank on Nuna Right embankment from RD 8.740 Km to RD 8.810 km (Working RD 8.740 Km to 8.805 Km) near village Dhia Balarampur High School for the year 2020-21
Protection to scoured bank on Mahanadi left embankment from RD 2.640 Km to 2.880 Km on Back side of Industrial Area, Jagatpur (Working RD 2.640 Km to 2.760 Km) for the year 2024-25
Improvement to road of Mahanadi right embankment from Brajabiharipur to Madhusudan Setu (from working RD 1.00 km. to 1.50 km. and 2.375 km. to 3.40 km.) for the year 2024-25. (MBD44/2024-25)
Construction of retaining wall for flood protection at left bank of Haradjore Nallah DS of Gobitola Bridge near broken bridge for 2024-25.
Earth Work, Dumping and Packing
dumping and packing work
dumping and packing work
Earth work and stone work
FDR to Bhargovi right embankment RD 18.300 km to 23.900 km and restoration to piping 3 nos. at RD 7.10 km, at RD 8.20 km and RD 9.50 km near villaglle Terabatia, Phulapal, Binayakpur
FDR to Daya left embankment from RD 46.600 km to 53.300 km and restoration to piping at RD 39.110 km, RD 39.670 km RD 40.600 km RD 42.025 km near village Trilochanpur and Tulasipur.
Renovation Rearing Tank RT and Nursery Tank NT under permanent water supply system for Binika Dist Sonpur OPDC Fish farm and Renovation and Strengthening of embankment at Barimula Govt Fish Farm in Kendrapara Distt Odisha
Improvement to CE No.34 (b) Birupa Right Embankment from Balichandrapur to Benipur road from 0/000 Km to 5/500 Km under State plan in the District of Jajpur for the year 2020-21
Laying and cleaning of hume pipe, placing sand bags in embankment and laying of stone metals in pot holes as and where required in monsoon for the year 2022-23 at Lingaraj OCP, Lingaraj Area.
Repair to Irrigation Embankment road from NH-16 (Gokarneswar) to Budhalingam Majhipada Road such as pothole repair with WMM, BM and SDBC from 0.00K.m to 10.950k.m and 16.700K.m to 21.957K.m for the year 2024-25
S/R to the Road from Gunthunia Bazar to Canal Embankment Via Hanuman Hat (Such as Construction of Protection Wall and Strengthening of Shoulder from 0/0km to 1/0km)for the year 2017-2018
Improvement such as widening and strengthening to CE No.34(b) Birupa Right Embankment from Balichandrapur to Benipur road from 5/500 km to 11/006 km in the district of Jajpur under State Plan
Construction of recharge shaft with , RCC Filtration chamber, RCC storage pit near Percolation Tanks, Govt Ponds and Nalla embankment 20 nos under Artificial Recharge Project in upper silda Nalla under Nuapada Block of Nuapada District