Loading…
Loading…
28,918 results • Best match
Construction of Boundary wall along with Retaining wall and River bank protection at periphery of Burdwan dumping ground under SWM scheme of Burdwan Municipality.
River bank protection/ erosion control measures on the left bank of River Subansiri adjacent to village Goraimari/ Bhimpara Pathar (RD 21 km. - 22 km)
Bank protection measures in between RD 38.80 and RD 39.10 on the left bank of the Feeder Canal under Farakka Barrage Project (Reach -6).
Construction of River Bank Protection Wall (Retaining Wall) at Chilakaluru L.I. Scheme on Vakkileru River in Rudravaram Mandal of Kurnool District on Turnkey basis
Construction of River Bank Protection wall (Retaining wall) at Chilakaluru LI Scheme on Vakkileru River in Rudravaram Mandal of Kurnool District on Turnkey basis
River bank protection erosion control measures on the left bank of River Subansiri downstream of village Geriki 1 RD 27 km to 28 km.
River bank protection/ erosion control measures on the left bank of River Subansiri upstream of village Goraimari/ Bhimpara Pathar (RD 20 km. - 21 km.)
Bank Protection Work at Barpeta ELIS (Hariharghat Point) under State Disaster Mitigation Fund (SDMF) for the year 2023-24under Tihu Division Irrigation Tihu Package_5
River bank protection erosion control measures on the Right bank of River Subansiri downstream to Sonowal gaon beyond 30KM RD 36.13KM to 37.13KM 1000m
Construction of River Bank Protection wall (Retaining wall) at Chilakaluru LI Scheme on Vakkileru River in Rudravaram Mandal of Kurnool District on turnkey basis
River bank protection works for Indrani river from Girish Kanchans house to Ramesh Poojarys house of Kalmadi ward in Udupi taluk of Udupi district
Restoration work of River bank protection near Kodi Kanyana fisheries bridge towards West in Kodi gram panchayath limit in Brahmavara taluk in Udupi district.
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA D/S OF SHASTRI BRIDGE , FROM CH.400.00 M TO 1000 .00 M IN MAGH MELA 2020-21
TEMPORARY RIVER TRAINING WORKS ALONG RIGHT BANK OF RIVER GANGA D/S OF SHASTRI BRIDGE , FROM CH.150.00 M TO 750 .00 M IN MAGH MELA 2020-21
Desilting and River Training of Patiala Ki Rao both upstream and downstream of UT Bridge and structure near Khudda Lahora UT Chandigarh Chargeable to Non Plan Head 2059
Desilting and River Training of Patiala Ki Rao both upstream and downstream of UT Bridge and structure near Khudda Lahora UT Chandigarh Chargeable to Non Plan Head 2059
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA U/S OF SHASTRI BRIDGE , FROM CH.500.00 M TO 1100 .00 M IN MAGH MELA 2020-21
TEMPORARY RIVER TRAINING WORKS ALONG LEFT BANK OF RIVER GANGA D/S OF SHASTRI BRIDGE , FROM CH.400.00 M TO 1000 .00 M IN MAGH MELA 2020-21
Strengthening and formation of flood bank with River Training Works damaged due to Cyclone Michaung in Araniyar River from LS.124.150 Km to 126.100 Km in Thiruvallur District
DREDGING WORK FOR THE RIVER TRAINING WORK BY CHANNELIZATION TO PROTECT VILL- MAURAHAWA and OTHER GROUP OF VILLAGES SITUATED AT LEFT BANK OF GHAGHARA RIVER IN DIST- BAHRAICH
Strengthening and formation of flood bank with River Training Works damaged due to Cyclone Michaung in Araniyar River from LS.69.135 Km to 103.600 Km in Thiruvallur District
DREDGING WORK FOR THE RIVER TRAINING WORK BY CHANNELIZATION TO PROTECT VILL- MAURAHWA AND OTHER GROUP OF VILLAGES SITUATED AT LEFT BANK OF GHAGHARA RIVER IN DIST- BAHRAICH
Restoration to K.V Right Embankment near Khandiakuda
Improvement to Bhargavi Left Embankment near Matagajapur.
Repair of Embankment
Saline Embankment Protection
Embankment strengthening work
Saline embankment protection
Saline embankment protection
Embankment improvement work
Embankment protection work
Saline embankment protection
Saline embankment protection
Saline embankment protection
Embankment improvement work
Embankment improvement work
Embankment protecton work
Civil and Electrical Works for Reconstruction/Renovation of Flood Damaged Institution and Devoloping Primary Health Centre to Family Health Centre at PHC Choornikkara, Ernakulam at Kerala as per Schedule of Work enclosed
Reconstruction of breach embankment providing back berm to R/B embankment of river Barnadi from Suktaguri to Lenga including A/E measures at Kalitapara, Mandakata and Alta area.
Reconstruction of breach embankment providing back berm to R/B embankment of river Barnadi from Suktaguri to Lenga including A/E measures at Kalitapara, Mandakata and Alta area.
Flood Protection works at Devanj viilage In Left Bank Of Bhilangna River Distt-Tehri Garhwal (reach 0.075 Km to 0.150 Km) Job-2
Flood Protection works at Devanj viilage In Left Bank Of Bhilangna River Distt-Tehri Garhwal (reach 0.000 Km to 0.075 Km) Job-1
Flood Protection works at Devanj viilage In Left Bank Of Bhilangna River Distt-Tehri Garhwal (reach 0.225 Km to 0.300 Km) Job-4
Flood Protection works at Devanj viilage In Left Bank Of Bhilangna River Distt-Tehri Garhwal (reach 0.150 Km to 0.225 Km) Job-3
Restoration/ Construction of flood protection work in Kargal, Ratti, Padmi, Khul, Sarote Nallah and its tributaries in Village Kargal, Ratti, Padmi and Sarote
Zapade M I scheme Tal Lanja Dist Ratnagiri embankment and pitching from chainage 80 m to 150 m
Supply of 150 nos of 150W LED FL with integrated driver required for maintenance of lights in all Corporation Buildings Schools Hospitals Flood Relief centres etc in all Zones during monsoon and emergency flood situations in Chennai City
Embankment protection
Embankment protection
Embankment protection