Loading…
Loading…
8,513 results • Best match
Emergent Restoration of Sundarban Embankment damaged due to Purnima kotal on 29.09.23 to 03.10.23 in between 34.950 km to 35.140 km at mouza Birajnagar facing Left bank of river Bidya in Block and P.S.- Gosaba, Dist. - South 24 Paraganas under JID.
Maintenance and repairs to severely damaged Sundarban Embankment in between 16.815 Km. to 17.040 Km. along R/B of river Matla near Pitching Cona at mouza Budhakhali, Block Canning-I, P.S Canning, Dist-South 24 Paraganas under Joynagar (I) Division.
Urgent repair of slip slope failure over Right Ex zamindary Embankment of River Buriganga near Elochak MSK for a length of 150 meter occurred due to very heavy rainfall at Mouza Anandapur Block and PS Ghatal and Dist Paschim Medinipur
Emergent Restoration to severely damaged Sundarban Embankment damaged due to VSCS YAAS near Zero point at Mouza Panitor for a length of 200.00 Metre along the Left bank of river Ichamati in Block Basirhat I and P.S.Basirhat under Basirhat Irriga
Restoration to damaged Sundarban Embankment near Near H O Osman Gazi Sardarpara for a length of 150.00 Metre along the Left bank of river Ichamati at Mouza Akherpur, Block Basirhat I of Basirhat Irrigation Sub Division under the jurisdiction of
M/R to Sundarban Embankment in between 4.00 KM to 4.15 KM and 7.00 Km. to 7.06 Km at mouza Pathankhali facing Left bank of river Hana in Block and PS - Gosaba, Dist - South 24 Paraganas under Joynagar Irrigation Division.
supply and plantation of different types flowering AN fruit tall trees at the both side embankment of canal B near Bellevue within Action Area II, New town including bamboo gabion for protection and one year maintenance under New town kolkata
M/R to damaged Sundarban Embankment for a length of 110 M from Ch.14.310 Km to Ch.14.420 Km at Mouza-Durganagar, Block- Namkhana on the left bank of river Saptamukhi under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 18.500 km to 18.650 km at mouza Birajnagar facing Left bank of river Bidya in Block-Gosaba, P.S.-Gosaba, Dist-South 24 Pgs under JID
Reconstruction of 1.5 m width of bituminous road along with special repair of existing road from Kolaghat station to Banpur on Rup Right Schedule D embankment for a length of 3.30 km under Block P.S Kolaghat, District Purba Medinipur.2nd call
Restoration of Sundarban Embankment for a total length of 120 metre along L B of river Dansa near land of Bishnu Mondal at Mouza Kumirmari in Block Hingalganj, under Hingalganj (I) Sub Division of Basirhat Irrigation Division, District North 24 P
Protective works of the road embankment adjacent to abutment wall of Bridge over river kunoor at 2.85 Km of Dauradanga-Baramallick Ghat Road under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman.....
Restoration of Subsidence/Slope failure at RS and CS of Right Ex Zamindary Embankment of River Deuli in between Ramchak culvert and Ramchak Jhil for a length of 447.00 meter at Mouza. -Ramchak, Block and P.S.-Sabang and Dist- Paschim Medinipur.
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal from 22.07.2025 to 27.07.2025 facing River Kanmari (R B) Near Shop of Gobinda Barik (90.0 m) Kanmari crematorium (30.0m) for a length of 120.00 m, Mouza Kanmari , G.P. Hat
Raising ,Strengthening Improvement of Sundarban Embankment with 20 cm thick dry brick pitching for a length of 700.00 Metre near Tetulati Adibasipara on the left bank of river Bidyadhari from Ch- 6.500 K.M. to Ch-7.200 K.M. at Mouza-Ranigachi, P.S.
M/R to severely damaged Sundarban Embankment for a length of 170 metre in between Ch 15.950 Km to 16.120 Km on right bank of Muriganga at mouza-Bankimnagar under Sagar (I) Sub - Division of Kakdwip (I) Division within block-Sagar
M/R to partly damaged sundarban embankment for a length of 100.00 metre in between ch. 2.200 km to ch. 2.300 km at Pradhaner Ghat in mouza- Dakshinlakshminarayanpur along the river walls creek under Brajaballavpur I Section under Patharpratima Irr
Improvement and Strengthening Work of Mallickpur Ex-Zamindary embankment for a length of 2.00 km along with Protection Work of 300 m at Mallickpur Haritala Ghat on the right bank of river Punarbhaba in P.S. Block Gangarampur, Dist Dakshin Dinajpur.
Emergent Restoration of Sundarban Embankment damaged due to Amabasya kotal on dated 16.08.23 to 19.08.23 in between 16.50 km to 16.84 km at mouza Mathurakhanda facing Right bank of river Gomor in Block and P.S.- Gosaba, Dist-South 24 Paraganas
Final breach closure for a length of 125 M and protection work for a length 100 M of Shaikpur Circuit embankment along right side of river Darakeswar at Talit , within G.P. - Kishorepure-II , Block - Khankul-I, P.S.- Khanakul, Dist.- Hooghly.
Emergent restoration of Sundarban river embankment from H O Subhash Das to H O Bholanath Mahato for a length 80.00 metre at Dakshin Akhratala along right bank of river Benti at mouza Dakshin Akhratala in Block Sandeshkhali I under Kalinagar Irrig
Emergent restoration to severely damaged Sundarban embankment damaged due to VSCS YAAS along the right bank of river Kalindi near Gumti Bazar, Sluice towards D s for a length of 700 at Mouza Malekangumti in Block Hingalganj under Basirhat Irrigat
M.R. to Babupara Sangapara embankment for a length of 1400 Mtr on the L/B of river Teesta and Daburipara area for a length of 700 Mts on the R/B of river Dharala in PS and Block Mal, Dist-Jalpaiguri.
Urgent repair to damaged Sundarban Embankment facing Bay of Bengal damaged by Kotal period from 19.08.2020 to 21.08.2020 for a length of 120 M tagging with 57/K at Mouza-Dhablat under Sagar I Sub - Division of Kakdwip I Division.
Emergent restoration to severe vertical slip caused due to very severe cyclonic storm BULBULfor a length of 50 mtr at Rup Right Schedule D embankment in between house of Ranjan Samanta and Dibakar Samanta Mouza Mirpur GP Barbartar Hat Block
Emergent Restoration of Sundarban Embankment damaged due to Amabasya kotal on dated 16.08.23 to 19.08.23 in between 4.90 km to 5.25 km at mouza Satjelia facing Left bank of river Gomor in Block Gosaba, P.S.-Sundarban Coastal, Dist-South 24 Paraganas
Restoration of damaged boulder pitching of Chetua Circuit (C.C) Embankment over Right bank of River Old Cossey through semi permeable spur for a length of 80 meter at Temuhani Steel Bridge at Mouza-Kismat Kolorah, GP-Panchberia, Block-Daspur-I, Dist.
Dumping and placing in position properly filled up Nylon crates to avoid further Erosion at MC Embankment over left bank of River Durbachati in between Ch.14.20km to 14.50 km length of work300 m at Mouza Brindabanchak BlockDaspurII Paschim Medinipur
Emergent protection and restoration work by widening and strengthening from ch. 36.400 km to 36.800 km.of TE1H1 embankment (R/B of River New Cossye) to reduce vulnerability of people due to flood during monsoon-2021 at Mouza- Gaespur, Block and P.S.
Restoration of slip slope failures over Right Embankment of Deuli River for a length of 264 Meter at RS and CS near Ramchak sluice at Mouza Ramchak in GP 4 No Dasagram Block PS Sabang and Dist Paschim Medinipur Karmashree
Protection work along left embankment of river Hooghly for a total length of 500 M at Pujali Palpara (length 400 M) and adjacent to Achipur Launch Ghat (length 100 M) within Block-Budge Budge-I, P.S-Pujali, District-South 24 Pgs.
Urgent Breach closing (55.00 M length) and flood mitigation work along with Strengthening (500.00 M length) of Left Ex-Zamindary Embankment of River Shilabati (near 14 Hana) to reduce vulnerability of people due to very heavy rainfall and high disc
supply and plantation of different types flowering AN fruit tall trees at the both side embankment of canal B near Moon beam within Action Area II, New town including bamboo gabion for protection and one year maintenance under New town kolkata
Emergent repair of severely damaged Sundarban Embankment damaged due to VSCS YAAS for a length of 210 mat Baunia 4 Mouza Baunia Abad G.P. Nazat I Block Sandeshkhali I along Right Bank of River Bidyadhari of Haroa Irrigation Sub Div
Urgent repair to damage Sundarban Embankment facing Bay of Bengal damaged by extremely severe cyclonic storm YAAS on 26.05.2021 for a length of 120 m tagging with 57 K at Mouza Dhablat under Sagar I Sub Division of Kakdwip I Division.
Maintenance and repairs to severely damaged Sundarban Embankment in between Ch. 17.100 km. to Ch. 17.450 km. along R/B of river Matla near Pitching Cona at M/Budhakhali, Block Canning-I under Joynagar Irrigation Division in District South 24 Parganas
Emergent Restoration of Sundarban Embankment damaged due to Purnima kotal on dated 29.09.23 to 03.10.23 in between 8.250 km to 8.410 km at mouza Satjelia facing Left bank of river Gomor in Block Gosaba, P.S. Sundarban Costal, Dist. - South 24 Pgs.
Restoration to severely damaged Sundarban embankment at breach portion and protection to the damaged forward bundh in between ring bundh to fishery of Mahatab Roy along the left bank of river Dansa at Mouza Banstola, Block PS Hingalganj of Hin
M/R to damaged Sundarban Embankment for a length of 180 M in between Ch.28.450 Km to Ch.28.650 Km facing left bank of river Muriganga at Mouza-Ganeshnagar , under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division Block- Naamkhana
Restoration of Sundarban Embankment for a length of 225 Mtr. along the L B of River Gomoti Near H O Naren Mondal at Mouza Parghumti in Block Hingalganj under Hingalganj I Sub Division in the Jurisdiction of Basirhat Irrigation Division, D
Emergent restoration of damaged Sundarban river embankment during New Moon kotal on dated 31.03.2025 to 02.04.2025 facing River Borokalagachi (R B) by constructing a ring bund for a length of 200 m. near H O Gopal Sing, mouza Atapur, G.P Monipur
M/R to severely damaged Sundarban Embankment for a length of 260.00 metre from Ch. 4.84 km. to Ch. 5.10 Km. facing Bay of Bengal at mouza Patibunia under Mousuni Irrigation Sub - Division of Kakdwip Irrigation Division within block-Namkhana, Dist-
Restoration of existing damaged Road side flank of Betbaria Dhosa Road to protect embankment collapse at chainage 10.500 kmp. to 12.00 kmp by bullah pilling in stretches and allied work under Baruipur Sub-Division 24 Pgs (South)- RnB works-2019-2020.
Emergent Restoration of Sundarban Embankment damaged due to Purnima kotal on 29.09.23 to 03.10.23 in between 7.10 km to 7.25 km at mouza Ranipur facing Right bank of river Bidya in Block and P.S. - Gosaba, Dist. - South 24 Paraganas under JID.
Urgent ditch filling along the bank of Hooghly Right embankment from existing filling work to concrete ramp adjacent to water treatment plant for a length of 97.00 metre in Uluberia Municipality in P.S-Uluberia, District-Howrah under Seijberia(I) Sub
Restoration of Sundarban river embankment for a length of 200.00 m. of R B of river Dansa from Deshbandhu club to Niranjan Mistri House at Mouza Baro Sehara, Block Sandeshkhali I in the jurisdiction of Kalinagar Irrigation Sub Division under Bas
Restoration of Sundarban Embankment for a total length of 40 metre along L B of river Kantakhali near Angnara Ferry ghat at Mouza Angnara in Block Hasnabad, under Hingalganj I Sub Division in the jurisdiction of Basirhat Irrigation Division, Dis
Restoration of depressed road stretch due to crossing of pipe line by waterjetting including protection of damaged embankment caused due to laying of pipe line by PHED at 5.90 Km of DCDKM Road under Purulia Higway Division, Purulia (Deposit Work)
Emergent restoration of Sundarban Embankment damaged due to Purnima kotal from 30.08.23 to 04.09.23 in between 11.125 Km. to 11.300 Km. at mouza Dayapur facing Right bank of river Sazna in Block Gosaba, P.S. Sundarban Coastal, Dist-South 24 Paraganas
Restoration of Sundarban river embankment for a length of 30.00 m. of R B of river Boalia near H O Suman Gayen at Mouza Bhanga Tushkhali, Block Sandeshkhali II in the jurisdiction of Kalinagar Irrigation Sub Division under Basirhat Irrigation D