Loading…
Loading…
8,513 results • Best match
Urgent repair of damaged Moorum Inspection Path due to incessant rainfall from 21.08.24 to 25.08.24 in between Ghugu Pool to Karan Para over Right Ex Zamindary Embankment of Debi Khal (Length-500m) at Mouza- Dubrajpur, GP-11 No. Mohar in Sabang
F.P.M work and sealing of Sluices at Damodar Right embankment from Kultepara Lock Gate to Nalpukur Ghat during the monsoon of 2024 at G.P -Chandrabhag and Hallyan in Block-Bagnan-II, P.S-Bagnan ,Dist-Howrah under LDC Sub-Division No-I
Emergent flood Precautionery Measure works to Lower Rampur Khal both embankment from Satpota R C C Bridge to Syphon in Block Amta II P S Joypur under Lower Damodar Construction Sub-Division No IV of Lower Damodar Construction Division durin
Restoration of 1 one number slip slope failures over Left Ex Zamindary Embankment of Kapaleswari River for a length of 30 Meter at river side near Nandapura Sluice at Mouza Chak Badalpur in Block PS Sabang and Dist Paschim Medinipur
Emergent restoration of Sundarban Embankment damaged due to Purnima Kotal from 31.07.2023 to 04.08.2023 in between 3.100 Km to 3.180 Km at Mouza Amtali facing right bank of river Puinjali in Block Gosaba, PS Chotomollakhali Coastal, District S 24 Pgs
Emergent Restoration to damaged sundarban embankment near Dulu Mondal s Shop at Dwip media for a length of 170 Metre along the right bank of river Ichamati of mouza Bajitpur of Block Bajitpur Dist. North 24 Parganas under Basirhat Irrigation Sub
Urgent restoration to damage by repair of slip failure over Right Ex Zamindary Embankment of Dokhali Khal for a length of 60 Meter at River side near HO Sanjoy Mondal at Mouza-Hariharpur, GP-7 No. Narayanbarh, in Block PS-Sabang
Flank protection, construction of embankment at Bulundi Kanaria Road from ch. 2.10 km to ch.2.55km, ch.4.10km to ch.4.65km and ch.6.35km to ch. 6.90km (effectively 1550m) in stretches under Arambagh Highway Sub-Division under Hooghly Highway Division
Urgent repair of damaged Moorum Inspection Path due to incessant rainfall from 21.08.24 to 25.08.24 in between Bhua Bridge to Kapal Lochan over Left Embankment of River Kapaleswari (Length-499m) at Mouza- Sabang, GP-8 No. Sabang in Block PS-Sabang
Emergent restoration to the severely damaged Sundarban Embankment due to Very Strong Cyclonic Storm YAAS near Amberia kheya ghat for a length of 120 mtr along the Right bank of river Sahebkhali at Mouza Amberia in Block PS Hingalganj under
Restoration of slip slope failures over Kaliaghai Left Embankment Length 25m at river side in between Dhamsai Teen Matha More Nedhyua Kheya damaged due to very heavy rainfall at Sabang occurred during 1st week of October2023 at Mouza Nedhyua, GP6 No
Restoration of slip slope failure over Right Embankment of Bonai Khal for a length of 23.00 Meter at country side at oposite of Chhina Sluice at Mouza Ghusinga in GP 6 No Chaulkuri Block PS Sabang and Dist Paschim Medinipur Karmashree
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 0.900 km to 0.940 km at mouza Birajnagar facing Right bank of river Durgadwani in Block-Gosaba, P.S.-Gosaba, Dist-South 24 Pgs under JID
M R to damaged Sundarban Embankment for a length of 150.00 m. at Sulkuni Mouza Sulkuniabad G P Bhabanipur I Block Hasnabad along R B of river Dansa in the jurisdiction of Kalinagar Irrigation Sub Division under Basirhat Irrigation Divisi
Flood protective maintenance of right embankment of river Darakeswar in between ch. 0.00 km to 5.50 km for a length of 5.50 km from Digra sluice to Trimohani in Blocks- Goghat- II, P.S- Goghat, Dist- Hooghly under Arambagh ISD under LDID
Emergent restoration of damaged Sundarban Embankment due to New Moon Kotal on and from 25.05.2025 to 30.05.2025 in beween Ch.11.30 km and Ch. 11.70 km for a length of 155 m at mouza Dakshin shibganj facing river Barchara under Patharpratima
Final breach closure for a length of 160 M and protection work for a length 100 M of Ex Zamindary embankment along left side of river Darakeswar at Kaknan Khute para within G.P.- Dhannagari, Block- Khanakul-II, P.S.- Khanakul, Dist.- Hooghly
Raising, Strengthening of Sundarban embankment with 20 cm thick dry brick pitching for a length of 45metre near Akherpur Sluice along the left bank of Akherpur outfall channel at Mouza Akherpur, Block Basirhat I, District North 24 Parganas under Ba
Restoration of Sundarban Embankment for the of length of 100 metre along L B of Sahebkhali river Near Old Ferri Ghat at Mouza Choto Sahebkhali in Block Hingalganj under Hingalganj (I) Sub Division of Basirhat Irrigation Division, District North 2
Restoration of Sundarban river embankment for a length of 75.00 m. of L B of river Benti at near H O Laxmi Sardar at Ghoshpur Mouza Ghoshpur, Block Sandeshkhali I in the jurisdiction of Kalinagar Irrigation Sub Division under Basirhat Irrigatio
Emergent restoration of severely damaged Sundarban Embankment during full Moon kotal from 5.05.2023 to 7.05.2023 for a length of 60.00 m alog with one no.ghogh at Jagarani para , mouza Durgamondop , Block Sandeshkhali II at L B of river Boalia u
Restoration of Sundarban Embankment for a length of 130 Mtr. along the L B of river Sahebkhali Near H O Bablu Das at Mouza Ramapur in Block Hingalganj under Hingalganj I Sub Division in the Jurisdiction of Basirhat Irrigation Division, Dist
Emergent restoration of Sundarban Embankment occurred on 27.07.2025 damaged due to New Moon Kotal from 24.07.2025 to 27.07.2025 along right bank of river Kalindi for a length of 200 M at Mouza Sahebkhali near H O Gopal Mondal , G.P Sahebkhali Block
Lot 1 Protection of both banks of river Damodar at different locations for a length of 7.10 km and strengthening of Damodar right embankment at different locations for a length of 0.475 km of River Damodar District Purbo Bardhaman and Hooghly.
Restoration of River Side Subsidence causing heavy rainfall and passing of high discharge (above EDL) during 1st Week of August 2024 at Right embankment of Hooghly River near Purba Basudebpur in Belari G.P, Block-Shyampur-I under Sei(I)Sub-DIv.
Emergent Restoration of Sundarban Embankment damaged due to Amabasya kotal on dated 16.08.23 to 19.08.23 in between 1.80 km to 2.15 km at mouza Dayapur facing Left bank of river Gomor in Block Gosaba, P.S.-Sundarban Coastal, Dist-South 24 Paraganas
Improvement of Drainage Channel removal of Congestion beside Juki Embankment from ch.2.50 km to 5.00 km for a length of work2500m in Mouza -Gopinathpur, Sunia, Shipur,GP-Sahara, Block-Egra -I Dist-Purba Medinipur under21-22 15th Finance Commisson
Restoration of 1 (one) number slip over Right Embankment of River New Cossye (TE1H1) for a length of 40.00 Meter at Country side and 60.00 Meter at River Side at Mouza-Gayespur in Block and PS- Debra and Dist. Paschim Medinipur
Emergent restoration of Sundarban Embankment damaged on dated 11.08.2025 due to wave action Full Moon Kotal from 31.07.2025 to 13.08.2025 along the Left bank of river Ichamatil for 40 m length at Durgapur Samshan ghat , Mouza Durgapur of Block Swa
Special repair work for restoration of damaged embankment and Carriage way caused by cyclone yaas for the PMGSY road T02 Santrapara Khoprjala to Patrapara L028 Panchpara SN Bose Rd to Andul Rd vide PMGSY Package No. WB09489 under Sankrail PS
Emergent Restoration of Sundarban Embankment damaged due to Amabastya Kotal from 19.05.23 to 22.05.23 from 12.65 km to 12.69 km at Mouza Amlamethi facing Right bank of river Gomor, Block and PS Gosaba, Dist- South 24 Paraganas under Joynagar (I) Divn
Relaying and Improvement of Sundarban revetted Embankment damaged during full Moon Kotal from 15.05.22 to 17.05.22 for a length of 140.00 M in between Ch. 4.850 Km to Ch. 4.990 Km at Mouza- Kusumtala West, facing river Muriganga within Block
Dumping and placing in position properly filled up Nylon crates to avoid further Erosion at MC Embankment over L bank of River Durbachati near Nona Narayanchak EP fora length of 80m at Mouza Nona Narayanchak Block DaspurII PS Daspur Paschim Medinipur
Strengthening and making Inspection Path for a length of 800 M in between chainage 2 3 KM to 3 1 KM over Jagatkhali Embankment in GP Plassey I Block and PS Kaliganj under Debagram Irrigation Sub Division of Nadia Irrigation Division
Relaying of pipeline in the affected area of Sajinatala and Matgaran due to flood like situation created by damage river embankment from Matgaran School More to Jetty Ghat at Basanti Water Supply Scheme Zone-I, Block-Basanti under Alipore Divn, PHE.
Emergent construction of retired embankment for a length of 50.00 m to prevent entrance of river water of Hooghly river to the country side near Nisarga House in GP Belari, Block Shyampur-I District-Howrah under Seijberia Irrigation Sub-Division
M/R to damaged Sundarban Embankment in between ch.6.400 km and Ch.6.510 km for a length of 103.00 m (antierosion) at Mouza- Lakshmipur, facing R/B of river Hooghly under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division
F.P.M. on Right embankment of river Damodar in between ch. 6.00 Km. and ch. 13.00 Km. for a length of 7.00 Km from Kora to Baikunthapur in Block Pursurah District Hooghly Under Champadanga Irrigation Sub Division of Lower Damodar Irrigation Divisi
M/R to damaged Sundarban Embankment from Ch. 19.000 km to Ch. 19.150 Km for a length of 150 m at mouza Bamanagar, Block-Kakdwip on the left bank of river Chunpuri under Kakdwip irrigation Sub- Division of Kakdwip Irrigation Division
Emergent restoration of 1 no Ghoge of Sundarban embankment damaged due to Full Moon Kotal on and from 04.11.2025 to 07.11.2025 in between Ch.18.95 km and Ch. 19.00 Km at Mouza Bhagbatpur facing river Gazir Khal under Patharpratima Irrigation
Emergent restoration to Sundarban Embankment damaged during Full Moon Kotal from 04.11.2026 to 08.11.2026 for a length of 210.00 m from Ch.6.700 KM to Ch.6.910 KM at mouza Lakshmipur, facing the left bank of river Hooghly Block-Kakdwip
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on and from 04.11.2025 to 07.11.2025 for a length of 110 m inbetween Ch. 21.20 km and Ch. 21.34 km facing river Curzon creek in mouza-Krishnadaspur under Patharpratima
FPM on Right embankment of river Damodar in between ch.- 26.50 Km. and ch. 30.60 Km. for a length of 4.10 Km from Ankri High Scool to Dihibhursut Bus Stand in G.P.- Chiladangi and Shyampur Block - Pursurah, District - Hooghly of LDID
Restoration of Forward Embankment damaged for a length of 60 Mtr. along the L/B of River Raimongal Near L O of Tarak Singh at Mouza Madhabkati in Block Hingalganj under Hingalganj (I) Sub Division of Basirhat Irrigation Division, District No
Repair of embankment inbetween Ch. 75.00 near Road Bridge and Ch. 108.00 near Cross Regulator over Left bank of DBMC of Borobataspur (I) Section of Mouza- Kabindnagar, GP- Digalgram, Block and PS-Md. Bazar and Dist.-Birbhum under M.N.C. Division dur
Emergent restoration to Sundarban Embankment damaged on 17.05.2026 due to New Moon Kotal along the river Sahebkhali (R/B), Near BSF check post at Mouza Amberia for a length 50.00 metre in Block - Hingalganj of Hingalganj (I) Sub-Division under Basi
Emergent restoration of Sundarban Embankment damaged on dated on 20.05.26 along left bank of river Raimongal for a length of 110M near H/O Anju Haldar at Mouza- Hemnagar, Block-Hingalganj under Basirhat Irrigation Division in the District of North 2
Emergent restoration of Sundarban Embankment Damaged occured on dated 03.6.2026 due to Full Moon Kotal Near HO Sabir Molla for a length 170.00 m, facing River- Bidyadhari (L/B) Mouza-Baunia, G.P.-Nazat -I, Block-Sandeshkhali -I of Haroa Irrigatio
Emergent restoration of road embankment of Upper Chengmari T.G. to Nepali Line Bhutan Border Road at CH. 0.563 km to 0.613 km (L.H.S) and Ch. 0.790 km to 0.810 km (L.H.S) under Jalpaiguri Highway Division in the district of Jalpaiguri
Urgent Maintenance of Canal Slope Lining including Strengthening of canal Embankment in between ch. 36.00 to ch. 40.00 of Dy.- 6 of IMC for Rabi Irrigation under SDS Maintenance of K.C. Sub-Division No.-V under Kangsabati Canals Division No.-II