Loading…
Loading…
8,505 results • Best match
Repair of Flood Damaged Road at Dighara under Bali GP, Goghat I Block
Flood Damaged restoration work of the Road from Saldaha to Dhandar under SonamukhiBlock
Flood Damaged restoration work of the Road from Khosalpur to Dayalpurunder Patrasayer Block
Flood protection and mitigation work for reducing vulnerability of area due to damages of Sundarban Embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 between Ch. 16.890 Km and Ch. 17.070 Km facing river Muriganga at Mouza Banki
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch.26.600 km. to Ch. 26.700 km for a length of 100 m.
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Shaikpur Circuit Embankment of River Sankari for a length of 1100.00 meter from shaikpur Janapara to Basanta bati ( 9.70 Km to 10.80 Km) within G.P.- Salepu
Flood Protection and mitigation work for reducing vulnerability of people by making Final closure at breach point of Left embankment of Kuldipi khal for a length of 60.00 Mtr. Mouza- Solbhaga G.P- G.B Chitnan, Block Amta-II, Dist. Howrah.
Flood protection and mitigation work for reducing vulnerability of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.2022 to 19.04.2022 from ch 0.420 km to ch 0.485km for a length of 65 m
Flood protection and mitigation work for reducing vulnerability of people by restoration of Inspection Path to the Left Ex Zamindary Embankment of River Darakeswar for a length of 670m Kishorepur Berapara TO Mayal Bustand From 1.58km to 2.25km with
Flood protection and mitigation work on right embankment of river New Cossye damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 for a length of 35 m in Mouza Serhati, Block Panskura under East Midnapore Division
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Right Ex Zamindari embankment of River Mundeswari from 7.185 KM. to 7.239 KM. for a length of 54.00 Mtr. at Paschim Durgapur Samantapara G.P. Tantishal Block
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.14.60 km. to Ch. 14.653 km for
Flood protection and mitigation work for reducimg vulnerability of area due to damaged of Sundarban Embankment effected during full moon kotal from 17.04.2022 to 19.04.2022. in between ch.0.000 km and ch.0.350 km. for a length of 350.00m
Urgent flood protection and mitigation work for reducing vulnerability of people by mending slip in between Ch22.250 Km to Ch.22.750 Km on Right Embankment of River Cossye at Mouza Haridrapat in Block Debra, P.S Debra, Dist,Paschim Medinipur
Emergent flood protection and mitigation work to reduce vulnerability of people by closing breach near Talghugi Sluice on the Left embankment of Hurhura Khal within Palaspai I GP in Block Khanakul II in District Hooghly under Lower Damodar Cons
Emergent flood protection and mitigation work on Rup-Right Schedule D embankment damaged due to high tide on 14.08.2022 for a length of 80 m ner house of Sankar Dalapati at Mouza Mirpur Block Nandakumar under East Midnapore Division
Emergent restoration of the Right Embankment of Kaliaghai River at different location in between Amgachia section Office and Singlai more Sluice for Flood protection and mitigation work in G.P.- Amarshi-II and Gopalpur, Block- Patashpur-I in Dist.- P
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EX ZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 270M AT DHANNYAGHORI UPPER PRY. SCHOOL FROM CH. 3.05KM TO 3.32KM G.P. DHANNYAGHORI BLOCK KHA
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 60 mtr. at Mouza-Gobindapur, G.P. - Rammohon-I , Block - Khanakul-I, Dist.- Hooghly on Right embankment of Kana Mundeswari River under LDID
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EX ZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 380M FROM DHALDANGA SHAIKPARA TO PANSULI BAZAR FROM CH. 11.60KM TO 11.98KM G.P. MAROKHANA BL
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EX ZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 180M AT MAKALTALA FROM CH. 6.00KM TO 6.18KM G.P. JAGATPUR BLOCK KHANAKUL II DIST. HOOGHLY
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EXZAMINDARI EMBANKMENT OF RIVER DARAKESWAR FOR A LENGTH OF 270M NEAR MALANCHA ANANDABAZAR FROM CH. 3.60 TO 3.87 KM G.P. GHOSHPUR BLOCK KHANAKUL I DIS
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 20 mtr. at Mouza-Purba Radhanagar, G.P. - Balipur , Block - Khanakul-I, Dist.- Hooghly on Left embankment of river Lower Harinakhali under LDI
Flood Protection and mitigation work for reducing vulnerability of people for Slip Subsidence failure to to Right Ex Zamindary Embankment of Amrakhali Khal near Transformar at Haiharpur for a length of 20 M by using EUC bullah pilling at
Flood Protection and mitigation work for reducing vulnerability of people by making Final closure at breach point on River side Panchaet ring bundh of Hurhura left flood embankment for a length of 50.00 Mtr. near Takipara Ghat. Mouza-Takipara
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EXZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 100M AT SAMABAY SAMITY FROM CH. 7.50KM TO 7.60KM G.P. JAGATPUR BLOCK KHANAKUL II DIST. HOOGHL
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Shaikpur Circuit Embankment of River Sankari for a length of 1600.00 meter from Komra RLI Centre to Srimantapur Mahakal Temple ( 13.40 Km to 15.00 Km) wit
Flood protection and mitigation work on Ex-Zamindary right embankment of river New Cossye damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 for a length of 92 m near Masjid in Mouza Domghat, Block Panskura
Flood Protection and mitigation work for reducing vulnerability of people for Slip Subsidence failure to Right Ex Zamindary Embankment of Amrakhali Khal near Near Manmath Barman House for a length of 25 M by using EUC bullah pilling at
Flood Protection and mitigation work for reducing vulnerability of people for Slip Subsidence failure to Left Ex Zamindary Embankment of Amrakhali Khal near Nabo Ghorai House for a length of 15 M by using EUC bullah pilling at Mouza
Flood protection and mitigation work for reducing vulnerability of area due to damages of Sundarban Embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 for a length of 600 Meters between Ch. 6.500 Km to Ch. 7.200 Km
Flood protection and mitigation work for reducing vulnerability of people by strengthening of Shaikpur Circuit Embankment of River Sankari for a length of 1800.00 meter from Srimantapur RLI Centre to Balarampur RLI Centre ( 15.20 Km to 17.00 Km) wi
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment of Upper Harinakhali Khal from 14.195 KM. to 14.267 KM. for a length of 72.00 Mtr. at Gholdigrui G.P. Chiladangi Block Pursurah
Flood protection and mitigation work for reducing vulnerability of people by Initial closing of Breach for a length of 160 mtr. at Mouza-Kedarpur, G.P. - Arunda , Block - Khanakul-I, Dist.- Hooghly on Right embankment of river Mundeswari under LDID
Flood protection and mitigation work for reducing vulnerability of puple due to damage of Sundarban embankment affected during Cyclone JAWAD on 05.12.2021 For a length of 170.00 M near Hujjait kheya Ghat at mouza Rajnagar along the river Chen
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Right Ex Zamindari embankment of Upper Harinakhali Khal from 14.650 KM. to 14.734 KM. for a length of 84.00 Mtr. at Gholdigrui Ghoruipara G.P. Shyampur Bloc
Flood protection and Mitigation work for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal near Sluice in mouza Hogalduri and near Fisheri in mouza Kalahajra along river Hana in Block and PS Basanti, S24Pgs
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EX ZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 110.M AT BHOWMIKPARA AND KARPARA FROM CH. 3.52KM TO 3.63KM G.P. DHANNYAGHORI BLOCK KHANAKU
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EXZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 55.00M AT GHORADAH RLI 1 FROM CH. 5.38KM TO 5.435KM G.P. DHANNYAGHORI BLOCK KHANAKUL II DIST.
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.16.500 km. to Ch. 16.556 km for
Flood Protection and mitigation work and reducing vulnerability of people by Restoration of Left Ex Zamindari embankment River Mundeswari from 3.740 KM. to 3.824 KM. for a length of 84.00 Mtr. at Digruighat Manasa Mandir G.P. Shyampur Block Pursura
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.2022 to 19.04.2022 from Ch. 1.495 km. to Ch. 1.867 km for a length of 372.00 m.
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EX ZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 285M AT GHORADAHA DAKHSHIN PRY SCHOOL SITOLA MANDIR TUNGPARA KUMIRPARA FROM CH. 5.535KM TO 5.8
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch.16.200 km. to Ch. 16.365 km for
Flood Protection and Mitigation Work for reducing vulnerability of people due to damage of sundarban embankment affected during New Moon Spring Tide from 07.09.2021 to 08.09.2021 synchronized with easterly wind from Ch. 27.600 km. to Ch. 27.815 km fo
Flood Protection and Mitigation work to alleviate vulnerability of people due to damage of embankment occurred during SCS SITRANG on 24.10.2022 in between diff Ch. at M/ Shambhunagar facing L/B of R/Hana, Block, P.S.- Gosaba, Under JID
Emergent construction of temporary dwarf bundh over Kaliaghai right embankment near Section Office length of work 140mtrdue to heavy Incessant rainfall on 2nd week of Sep-24 for Flood protection and mitigation work in GP.-Amarshi-II, Block-patashpurI
FLOOD PROTECTION AND MITIGATION WORK FOR REDUCING VULNERABILITY OF PEOPLE BY RESTORATION OF LEFT EX ZAMINDARI EMBANKMENT OF RIVER RUPNARYAN FOR A LENGTH OF 130M AT NEAR SAMANTAPARA FROM CH. 3.35KM TO 3.48KM G.P. DHANNYAGHORI BLOCK KHANAKUL II DIST
Flood protection and Mitigation work for reducing vulnerability of people due to damage of embankment occurred during Purnima Kotal at mouza Kachukhali (near Hari Mandir) facing left bank of river Bidya in Block and P.S.- Gosaba, South 24 Pgs.
Flood protection and mitigation work for reducing vulnerability of people due to damages of embankment occurred during Amavasya Purnima Kotal synchronized with depression 28.09.21 to 19.10.21 for a length of 85 m along the left bank of river Rai